HomeMy WebLinkAboutBLDE-22-005428 PLANS i
/ 1
INSTALLATION OF NEW CHECKERBERRY LANE•
ROOF MOUNTED PV SOLAR SYSTEM
16 CHECKERBERRY LANE
WEST YARMOUTH, MA 02673
Issued/Revisions
A,
0 VICINITY MAP SITE NO. �`DESCRIPTION[w DATE„
SCALE:NTS Project Title:
HANSEN,HOLLY-
TRINITY ACCT X:2022-03-675119
Project Address:
16 CHECKERBERRY LANE
WEST YARMOUTH,MA 02673
41.654736,-70.231422
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX
B JUNCTION BOX PV-1 COVER SHEET W/SITE INFO&NOTES
Drawing Title:
1.THE INSTALLATION CONTRACTOR 13 8. THE DC VOLTAGE FROM THE PANELS IS 14. CURRENT PREVAILING UTILITY
RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, CMIL THOUSAND CIRCULAR MILS
EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS VA KILO-VOLT AMPERE PV-2UROOF PLAN W/MODULE LOCATIONS PROPOSED PV SOLAR SYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PNS HAVE BEEN W KILO-WATT
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF WH KILO-WATT HOUR PV-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL MID AGENCY REVIEW AND LINE
2 THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED,THE MOB MAIN CIRCUIT BREAKER AP APPENDIX Drawing FOR INSTALLING ALL THAT THE SOLAR MAI
MODULES ARE INSTALLATION CONTRACTOR IS MOP MN DISTRIBUTION PANEL Information
EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MLO MAIN LUU ONLY DRAWING DAT, 1 3/21/2022
DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. SYSTEM COMPONENTS AS DESCRIBED IN MTD MOUNTED DRAWN BY: I qG
IN THE COMPLETE MANUAL. 9, ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. MTG MOUNTING
3,THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 18 ALL INFORMATION SHOWN MUST BE N NEUTRAL REVISED BY:
RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CERTIFIED PRIOR TO USE FOR NEC NATIONAL ELECTRICAL CODE
UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTION ACTIVITIES NIC NOT IN CONTRACT
COMPONENT AND INVERTER MANUALS ARTICLE 8904705. NOR NUMBER System Information
PRIOR TO INSTALLATION.THE INSTALLATION I0. PRIOR TO THE INSTALLATION OF THIS NTS NOT TO SCALE
CONTRACTOR IS ALSO REQUIRED TO RAVE PHOTOVOLTAIC SYSTEM,THE OCP OVER CURRENT PROTECTION DC SYSTEM SIZE 6kW
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL ABBREVIATIONS P POLE AC SYSTEM SIZE 7 6k
POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING MAP AMPERE PB PULL BOX MODULE COUNT i 15
THE INSTALLATION OF ALL FUSE BEARING FOR THE REVIEW OF THE INSTALLATION AC ALTERNATING CURRENT PH 0 PHASE MODULES USED: ,HANWHA 400
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND AL ALUMINUM PVC POLY-VINYL CHLORIDE CONDUIT MODULE SPEC p: !LIRAS DUO ILK Ml-G10.27400
4.ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF AMP.FRAME PWR POWER
MOUNTED,THE INSTALLATION II, PRIOR TO THE SYSTEM START UP THE AFF ABOVE FINISHED FLOOR OTT QUANTITY UTILITY COMPANY: EVERSOURCE
CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AG ABOVE FINISHED GRADE RGS RIGID GALVANIZED STEEL UTILITY ACCT p: 14297460058
ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL AWG AMERICAN WIRE GAUGE SN SOLD NEUTRAL UTILITY METER X: 230)0]9
SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING C CONDUIT I GENERIC TERM OF JSWBD SWITCHBOARD DEAL TYPE: SUNNOVA
COURSE ON SITE. CONDUCTIVITY CHECKS, RACEWAY.PROVIDE AS TYE TYPICAL
5.FOR SAFETY,IT IS RECOMMENDED THAT 12, FOR THE PROPER MAINTENANCE AND SPECIFIED? V.0.1. UNLESS OTHERWISE INDICATED
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX WP WEATHERPROOF
MINIMUM OF TWO PERSONS WORKING THE ISOLATION PROCEDURES IN THE CKT CIRCUIT XFMR TRANSFORMER
Rev.NO. Sheet
TOGETHER AND THAT EACH OF THE OPERATION MANUAL CT CURRENT TRANSFORMER '72 MOUNT 72 INCHES TO BOTTOM
INSTALLATION CREW MEMBERS BE TRAINED 13. THE LOCATION OF PROPOSED ELECTRIC CU COPPER OF ABOVE FINISHED FLOOR OR
IN FIRST AID AND CPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRADE P1 PV - 1
8.THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO TO FINAL APPROVAL OF THE DISC DISCONNECT SWITCH
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIES AND DWG DRAWING
CONVENTIONS OF THE NATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER
ELECTRICAL CODE.ANY LOCAL CODE 14. AL MATERIALS,WORILMANSHIP AND EMT ELECTRICAL METALLIC TUBING
WHICH MAY SUPERSEDE THE NEC SHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE
7.ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH'. GND GROUND
INSTALLED WITH THIS SYSTEM ARE TO BE AI CURRENT PREVAILING MUNICIPAL GEI GROUND FAULT INTERRUPTER
"UI'LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, HZ FREQUENCY(CYCLES PER
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND)
4111111Y. ®
GENERAL NOTES SOLAR
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN-A',PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TOAVAILABLITY OF EQUIPMENT.
2211 Allenwood Road 877-786-7283
Wall,New Jersey 07719 www.Tliroy-Solar.corn
ss
(........ DoE,- 22 -ao cL{ 7
F
14
NOTES-'RErCR TO MODULE SPECS FOR MODULE DIMENSIONS /
'DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE
ECOFAOTENSEAMP
NEWPV TrO MODULETYPIML (RESER To PREP SHEET FOR oETAM1q
mig (REFER TO EQUIPMENT SCHEDULE ...
FOR SPECS ArvO OWwrRIES) SOLAR MODULEMN
SOLAR MODULE
• MO. NEW MOUNTING FOOT(ATTACHMENT a
( j/
POwTS.uNVINU (REFER r0 ECOFASTEN'L'FOOT ECOFASTEN RAIL V GI
111111
II ENGWEEARNG LETTER FOR SPAdNGASTE ]c IVL,Lu u�svLc svEei Eua pElu� , IaEF[a ru svEc wEEi F,w pETn,Lq Q \� ],
EWEMOUNTED OAIL,TYPMALr \ /ro BE MOUNTED PERPINDICUUR i0EXISTING ASPHALT SHINGLES •I� ECOFASTEN FLASHING� STRUCTURE(REFER TO ECOFA9TEN IREFEA TO ENGINEERS LEr EA EDV BPECR (REFER TO SPEC SHEET FOR OE.. ��
SPECIFICATION I DATA SHEET FOR �-�
DETALSI
NEW END LLP.TYPICAL SS.LAG BOLT APOC SEALANT ,/ r,Tl
I �I (REFEris-r OMSr TMI.SIIFbATbN VEEEa TOE ONEEVELE Eq FOR SPEER SOLAR MODULES SHALLNOT
I MTA SHEET FOR DETNIs) EXISTING RAFTER
EXCEED PEAK HEIGHT.
klilb- NEW Mb CLIP,TYPICAL (REFER TO ENGINEERS LE,TEa FOR SVEC5
(REFER TO ECOFASTEN SPECIFICATION
I DATA SHEET FOR DETAILS)
ATTACHMENT 8 CLIP DETAIL ❑PV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF
SCALE1.4 NOT TO SCALE SCALE.NOT TO SCALE SCALP.NOT TO SCALE
ARRAY SCHEDULE
Issued/Revisions
I -(PROPERTY LINE) — — BACK r, ,NNm,o,dwga.,r,4a.,gx, Y,,,,w,
I NO. DESCRIPTION DATE
I Project Title.
II HANSEN,HOLLY-
TRINITY ACCT N:2022-03-675119
I 1 •
R 1 1 Project Address:
16 CHECKERBERRY LANE
I
BACK I WEST YARMOUTH,MA 02673
41.654736,-70.231422
I
I E Drawing Title:
1 R4
1 R3 PROPOSED PV SOLAR SYSTEM
Ac
Iril ® II
R2 DC Drawing Information
DRAWING HTE'. '3/21/1021
I ® ®® DRAWN BY RG
P REVISED BY:
FRONT System Information:
....__ _ -- OC STSTEM SIZE: SEW
I EP M) AC SYSTEM SIZE: I765W
MODULE COUNT: 15
I_ — — — — — MODULES USED: I HANWHA400
MODULE SPEC N: O.PEAK DUO ELK MI-USD.a+400
UTILITY COMPANY:.EW RSOURCE
.'"NOTE:SMART METER TO BE LOCATED UTILITY ACCT N. i 1429 246 DOSS
NOTES: FRONT
<10'FROM UTILITY METER UTILITY METER 2307029
1.1 ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE DEAL TYPE: I SUNNOVA
WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2.1 ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION.
4)AN AC DISCONNECT SHALL BE GROUPEDWITH INVERTER(S)NEC 690.13(0. Rev.No. Sheet
5J ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING.
SJ ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE.
ROOF 1 SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE P1 1-[�
V - 2
MODULE5:0 OTT SPECS
PITCH:9' '.INDICATES ROOF DESIGNATION.REFER TO !INDICATES NEW UNFUSED PV DISCONNECT TO BE 'INDICATES NEW PV ONLY SUBPANEL
ORIENTATION:or CO,ARRAY SCHEDULE FOR MORE INFORMATION ' II INSTALLED OUTSIDE(UTILITY ACCESSIBLE) SP TO BE INSTALLED 15 HANWHA 400(Q.PEAR DUO ALE ML-G10.a+400)
ROOF 2 _
MODULES.11 INDICATES NEW PV SOLAR MODULE.RFD MODULES
PRCN:3S 1 SE7600H-USOSHBNC4
ORIENTATION:217 I I.,I I INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. 0INDICATES NEW DC DISCONNECT •
ROOF 3 �1 REFER TO EQUIPMENT SCHEDULE FOR SPECS. ISI
MODULES:4 I i - - -- - - , OTHER OBSTRUCTIONS
PRd1:3S KIDICATESEXISTING ELECTRICAL PANEL E/��I INDICATES NEW PRODUCTION METER TO BE SOLAR ORIENTATION 212 EP LOCATION:INSIDE L E'U INSTALLED OUTSIDE. Sp INDK:ATES EXISTING SERVICE DISCONNECT JOLAR
ROOF4 I IJ ...
MOOULE5:0
PRCH 30' MDILATES NEW fUSEO PV DISCONNECT TO BE ��[''��JJ''�I INDICATES NEW INVERTER TO BE
ORIENTATION.3]' [ INSTALLED OUTSIDE(UTILITY ACCESSIBLE) VJ.INSTALLED OUTSIDE. TS I INDICATES EXISTING TRANSFER SWITCH 2211 Allenwood Road 577-7E6-7283
V REFER TO EQUPMENT SCHEDULE FOR SPECS Wall,New Jersey 02719 www.TrinilYSclaccom
9
Engineer!License Holder:
ARRAY CIRCUIT WIRING NOTES
1.)LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND
EXECUTING INSTALLATION IN ACCORDANCE WITH
NEC 2020SOLAR MODULES MOUNTED TO ROOF ON 2 ARRAYS
15.400W MODULES W/1 SOLAR EDGE P401 PER MODULE
2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON 15 ADC MAX PER STRING
ASHRAE MINIMUM MEAN EXTREME DRY BULB
1 STRING OF 15 MODULES IN SERIES-400 Vmax ---- _ 8"X8" _
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOJUNCTION
INSTALLATION LOCATION.LOWEST EXPECTED AMBIENT O BOB
TEMP=-16'C
'TERMINATED INSIDE INVERTER 1
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED
ON ASHRAE HIGHEST MONTH 2%DRY BULB
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION.HIGHEST CONTINUOUS TEMP=
DEC
4.)2005 ASHRAE FUNDAMENTALS 2%DESIGN
TEMPERATURES DO NOT EXCEED 4TC IN THE UNITED
STATES(PALM SPRINGS,CA IS 44.1"C).FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS INA ROOF-MOUNTED
SUNLIT CONDUIT AT LEAST OS"ABOVE ROOF AND USING Issued/Revisions
THE OUTDOOR DESIGN TEMPERATURE OF 4TC OR LESS
(ALL OF UNITED STATES)
5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH Pr is4Xor0 1-0V04111!r
NEC 690.12(A)THROUGH(0) o.nwar 1/11001)
6.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED NO. DESCRIPTION DATE
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC Project Title:
SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41(74(4)
].)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE HANSEN,HOLLY-
IDENTIFIED WITH THE FOLLOWING OUTER FINISH:
POSITIVE CONDUCTORS=RED TRINITY ACCT 4:2022-03-675119
NEGATIVE CONDUCTORS=BLACK
NEC 210.5(q0) Project Address:
81 ARRAY AND SUB ARRAY CONDUCTORS SHALL BENIOPV EXISTING ��1FFF���...��`�EE' 24OV 10 NOTE:
WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE 10120/240V II NAL REVENUE GRADE MONITORING
PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT 150A MAIN BREAKER 16 CHECKOUTH,PLANE
UTILITY METER CONTAINED WITHIN SOLAR EDGE INVERTER WEST YARMOUTH,MA 02673
SUNLIGHT.SUB ARRAY CONDUIT LONGER THAN 24"SHALL I50A BUSBAR
CONTAIN 510 CURRENT CARVING CONDUCTORS AND
SOLAR EDGE PN.RWND-3D-240-MB 41.654736,-70.231422
WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN
5 9 CURRENT CARRYING CONDUCTORS.
9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100'UNLESS tj Drawing Title:
OTHERWISE NOTED
10.1 FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON i SMART METER PROPOSED PV SOLAR SYSTEM
LOCKABLE 60A DISCONNECT PRODUCTION
ROOFTOP AND SHALL BE LIMITED TO 12"IF USED FUSED W/40A FUSES METER
OUTDOORS
i 240V 10 16ne.em.. INVERTER Xl D
11.)OVERCURRENT PROTECTION FOR CONDUCTORS n.0 r.
[woo")u ' _ �T. Drawing Information
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE �meoeel -i+0 • �",� DRAWING DATE: '3/21/2022
LOCATED WITHIN IO'OF THE POINT OF CONNECTION NEC -- 0� I
690.9161131121 �\ I'7 7II' '''.,'' ILL, o o 9 --,
l ll L`N\ _ J DRAWN BY. RG
12.)
E A
BREAKER(5)
(5)RE SHALLWO BE LOCAFEEDP SITEFROM UTI C--- o Xe A (1 LCa B i- !� E F- - lel`4j�� ,,}-� �+ I JI System Inform
UTILITY AND THE OTHER AN INVERTER,PV BACKFEED r--- --a r-�\77 G YYY--_ Lv, D r 1V\ Y I,II r
DC SYSTEM
JOS 1 2 SHALL BE LOCATED OPPOSITE FROM UTILITY Information,
NECn6c IDs.1z18113)(z) la a a a m a I
EXISTING MAIN BREAKER LOAD CENTER SQUARE 0 I J I 6kW
13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY INSULATED LINE TAPS INSTALLED ON PN:0222NRB I _J AC SYSTEM SIZE: T.6kw
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR MAIN FEEDERS MODULE COUNT: X15
LOADS
NEC 705.12(A) MODULES USED: NANWHA4W
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE MODULE SPEC N: D.PGX DUO BLK ML'GI0.a+900
A NEMA BNG
UTILITY COMPANY: EVERSpURCE
UTILITY ACCT 4: 1429 746 0058
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS
REQUIRED CONDUCTOR AMPAZITV PER31 RING DEALUTILITY METER N: 2307079
[NEC 690.)')(1)]:(15.00'1.25)1=18.756 DEAL TYPE: SUNNOVA
PV MODULE SPECIFICATIONS
AWG 010,DERATED AMPACITY HAN WHA 400(Q.PEAK DUO INK ML-G10.a+400)
AMBIENT TEMP:33'C,TEMP DERATING FACTOR:.96 Rev.NO. Sheet
RACEWAY DERATING=2 CCC:1.00 Imp 10.77
(40'.96)1.00=38.406 Vmp 3].13 E .6 Fx, r grvuiJ(n .v.MI CON NACU,
38.40A'-18.75A,THEREFORE WIRE SIZE IS VALID Voc 45.3 A N6 THWN-2 GEC TO EXISTING GROUND ROD P1 PV - 3
TOTAL AC REQUIRED CONDUCTOR AMPACITY lu 11.14
32.00A"1.25=40.00A B 3/4"CONDUIT W/2-NB TOWN-2,1410 TNWN-2,1910 LNWN-2 GROUND
AWG 48,DERATED AMPACITY INVERTER NI-SE760011-USOSHBNC4 C 3/0.CONDUIT W/2-NIOOMNI,1-410 THWN 2GROUND
AMBIENT TEMP,30.C,TEMP DERATING:1.0 AC 0 3/4"CONDUIT W/2-K10THWN'2,1-NIDTHWN'2 GROUND
RACEWAY DERATING 1.3 CCC:N/A DC
SSA'1.0=SSA Imp 15 Pout 7600 E 3/4"CONDUIT W/246THWN-2,1-1110THWN-2,1.410THWN.2 GROUND
55/1"4000A,THEREFORE AC WIRE SIZE IS VALID Vmp 400 Imax 32
Voc 480 OCPOmin 40 F 410 PV WIRE(FREE AIR)W/116 BARE COPPER BONO TO ARRAY _ A
CALCULATION FOR PVOVERCURRENT PROTECTION At 15 Vnam 240 G 3/4"CONDUIT W/1-p6 TNWN-2.1-BA TNWN-2,1# 2 GROUND
B TOWN.? SOLAR
32.00/01.25=40.006
-->40AOVERCURRENT PROTECTION IS VALID 2211 Allenwood Road 877-786-7283
Wall,New Jersey 07719 www.Tnnity.Salar.com
1