Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. tJ 0 Lot SC Zone of Contribution: In Out ✓ Acreage at.90.2/C,2o Commercial: Residential: Street: Village: Floor Plan: V # Bedrooms: Owner: P e;/A c��, s c J Installer: - 0 Li r Address: _ Phone: Phone: Builder: Engineer: (-V A. CC- i-aE _Sc, f 'C... Address: Phone: Phone: N/A YES / NO 1 1. Required#of copies received ✓ I 2. Date of soils exam and percolation test not older than 2 years - I 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1 -5. Water line 10 ft from septic components Var.: 1 6. Benchmark indicated and shown-NGVD if near wetlands _ 7. Septic tank minimum 10 ft from foundation, deck Var.: c./ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: I /w" 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leachin<g minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 1 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons) or 5' removal / 16. Proposed contours are suitable _ 17. System meets slope requirements-min. 1/8", !%"preferred 18. System meets breakout requirements PVC liner: Wall: i 7 19. Specified tee sizes are proper, gas baffle on outlet tee / 20. Sewage is under 10,000 gpd for parcel 7 ' 21. No garbage disposal i 22. System adequately sized for its intended use / 23. Minimum 6"stone or compacted below tank and dbox I 24. Manhole covers within 6"of grade, pump chamber cover to grade / 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber,-Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size / 2S. Se tic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 1 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: i/ ' 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I 33. H-20 loading is subject to vehicular traffic, groundwater 1 34. Title V Application and permit fee, installer signature �/ I 35. Foundation footing min. 2 feet above adjusted ground water for new house I L 36. Deed Restriction required max. #bedrooms: max. flow: gpd j f 37. Check area lots for groundwater/Label groundwater in Assessor's Map I V Plan reviewed by: Q� --_ -- -_--- 6 01 0;