HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. tJ 0 Lot SC Zone of Contribution: In Out ✓ Acreage at.90.2/C,2o
Commercial: Residential:
Street:
Village: Floor Plan: V # Bedrooms:
Owner: P e;/A c��, s c J Installer: - 0 Li r
Address: _ Phone:
Phone:
Builder: Engineer: (-V A. CC- i-aE _Sc, f 'C...
Address: Phone:
Phone:
N/A YES / NO 1
1. Required#of copies received
✓ I
2. Date of soils exam and percolation test not older than 2 years - I
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1 -5. Water line 10 ft from septic components Var.: 1
6. Benchmark indicated and shown-NGVD if near wetlands _
7. Septic tank minimum 10 ft from foundation, deck Var.: c./
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: I /w"
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leachin<g minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.: 1
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal /
16. Proposed contours are suitable
_ 17. System meets slope requirements-min. 1/8", !%"preferred
18. System meets breakout requirements PVC liner: Wall: i 7
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel 7 '
21. No garbage disposal i
22. System adequately sized for its intended use /
23. Minimum 6"stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade, pump chamber cover to grade /
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber,-Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size /
2S. Se tic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking 1
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: i/ '
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I
33. H-20 loading is subject to vehicular traffic, groundwater 1
34. Title V Application and permit fee, installer signature �/ I
35. Foundation footing min. 2 feet above adjusted ground water for new house I L
36. Deed Restriction required max. #bedrooms: max. flow: gpd j f
37. Check area lots for groundwater/Label groundwater in Assessor's Map I V
Plan reviewed by: Q� --_ -- -_--- 6 01 0;