HomeMy WebLinkAboutEngineer Plano6
PQ
V-i
Map 50
Parcel 58
Clifford Str
-,T 40) IrN eet
Publ'
N 8§:3-r 10"
7. ... ........ ..
88-38,
vvay
S 80*44:40"
E
S 80"44940ft
3.07
D/W
I
'Vow
House #
2 Bedroom L
57,13'
CD1
4
001
1:10
TOF EL = 20.5± R
31.74'
Wooded
1
Liv
Bed
18
Area
#1
I
Lot
37 & Lot 38
Garage
242,620±
Sq. Ft.
Slob
Kit
UJI
w
at Bed
#2
!01
100.0
W
Mop 50
Parcel 55
20 0
LOCATION OF UTILITIES IS APPROXIMATE AND ALL
UNDERGROUND AND OVERHEAD UTILITIES MUST BE
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO,
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES
AND THE LOCAL WATER DEPARTMENT.
ocu
b
Jupiter
co,l o,�o
0, �
South Yarmouth,- MA
SITE LOCUS
NOT TO SCALE
1.) Assessor's Map 50 Parcel 57
2.),Bk 31045 Pg. 329
3.) Pion Book 174 Page 31 Lot 37/38
5.) This property is not in the Aquifer -
Protection District
5.) This property is in Flood Zone X
Firm map 250001CO587J Doted: 7/16/14
C*4 TBM EL - Q)
C-41 20' Top of Concrete;r)I ��� Min TP #2
.0
-Lo er--�6(19.7) / / 0
Per
Test'-c,
SAS STT---- b
(0 - -4 0�
0 0)/
00
C.�
LO M See
Lo TP C5 -,Note #19 18
181.76
GRARHIC SCALE
10 20 40
1 1 1
( IN FEET )
1 inch = 20 ft.
Mop 50
Parcel 5
5 IYarmouth Health Department
VED ;ame Date
so
Proposed Septic Plan
3 Clifford Street South 'Yarmouth, MA
Prepared
Prepared for: by.
All Cope Septic LLC
Priscilla Anderson 618 Route 28
Clifford 'Street hest Yarmouth, MA 02673
South Yarmouth, MA 02664 (508) 771-4200
alicapesepticOgmoil.com
Date: 08/23/22 Sheet 1 of 2 '1 By. MA I Check: SM I Project No. AC-486
CONSTRUCTION -NOTE
1.) ALL WORK SHALL CONFORM To THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR I& }:
STANDARD REG UREMF.NTS FOR THE SITING. CONSTRUCTION. INSPECTION- UPGRADE, AND
EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGF, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED 'IN A LOCATION- WHERE THERE IS POTENTIAL I OR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
3.) TO MINIMIZE UNEVEN SETTLING. SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK. THE DISTRIBUTION BOX. AND
THE SOW. ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL OJUM. LEACHING
FIELDS, TRENCHES. AND OTHER SOIL ABSORPTION ON SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) NSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED
VERTICALLY TO THE BOTTOM OF TIME SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC
MARKING TAPE. ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC'OR EQUIVALENT. PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE Of HOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC T
AND NOT LESS THAN IX OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTTED. LINES SHALL BE CAPPED
AT END ONE AS NOTED.
7.) LINES FROM THE - DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTIO W
&) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUC
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL. FIELD, DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10.) 1% ACCORDANCE WITH 310 CMR t5.221, ALL SYSTEM COMPONENTS SHALL BE MARKED O
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 15W OF THE PROPOSED SOIL. ABSORP ftON
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. AN y CHANGES SHALL BE APPROVED IN WRITING BY THE ENGI
14.) THE BOARD,or HEALTH. REQUIRES INSPECTION OF ALL CONSTRUC71ON BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THIS DES04M SHALL CERTIFY 1N WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITI{ THE TERMS OF THE PERMIT
AND THE APPROVED PLANS, 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGS
ANY PRIVATE UTILITY COMPANIES. AND THE LOCAL WATER DEPARTMENT.
16.}. CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC CO MPO>1NENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF AN
SEPTIC SYSTEM COMPONENTS,
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL Cam, TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS To BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REOULRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING
RAISE MIN. 20" DIAMETER COVER
RAISE MIN. 20" DIAMETER COVER
TO WITHIN 6" OF FINISH GRADE
TO WITHIN 6" OF FINISH GRADE
EL=20.5t
19.4+
19.8t
EL-i20.5#
-
x
O
18.0
GEOTEXTILE
17.6g
FABRIC
18.5t
Existing
17.9
17.65
17.47 17.3 17.1
3 4" to
1- 1st' (Bauble was
GAS BAFFLE
DB- 3 H-20
D -- B O X THREE (3) 500
GALLON H-- 20 PRECAST
• - '
15.1 CONCRETE LEACH
CHAMBERS WITH 4' OF
-�--•- _-_______
> 28' t
1,500 GALLON
STONE ON ENDS AND 4' ON SIDES
I -16'± t------1 '± ---- ,
5.S
SEPTIC TANK
LEACH
CHAMBERS
END VIEW
FLOW PROFILE
NOT TO SCALE
EL=9.3 Bottom Test Hole
SYSTEM.
T r- c^ T 1 1 /1% 1 r` ' I r% /'* (_
Test Hole 1 (EL= 20.5f)l
L- J I I L V.1 L . L_ V✓ V ..
Qepth
Elev.
Layer
Soil Class
Snit Color
other
0"-6"
20.0
A/E
Loamy Sand
10YR4/1
6"-35"
17.6
8
Loamy sand
10YR5/6
35"-125"
10.1
C
Med Sand
10YR6/4
Test Hole 2 (EL=19.7f )
Depth
Elev.
Layer
Soil Class
I
Sall Color
Other
0"-10"
19.1
O/A
Loamy Sand
10YR4/1
10"-33"
16.9
8
Loamy Sand
10YR5/6
33"-125"
9.3
C
Med Sand
10YR6/4
DATE OF TESTING: 08/10/22
SOIL EVALUATOR., MARK POSELU
WITNESS: ,JAY GARDINER YARMOUTH HEALTH AGENT
PERCOLATION RATS; HOLE #2: LESS THAN < 2 MIN/INCH (0 70")
NO GROUNDWATER ENCOUNTERED
NO MOTTLING ENCOUNTERED
SYSTEM DESIGN CALCULATIONS
SEWAGE DESIGN FLOW: EXISTING TWO BEDROOM DWELLING 0 110 GPD/BEDROOM - 220 GPD
(MINIMUM DESIGN REOXIIRED 330 GPD)
SEWAGE DESIGN FLOW PROVIDED: THREE (3) 500 GALLON CHAMBERS
WITH 4' STONE ON - THE ENDS AND 4' STONE ON THE SIDES
Vt = [(33.5 x 12.83) + 2(33.5 + 12.53) (2) x .74 = 455 GPD PROVIDED
455 GPD PROVIDED > 330 GPD REO?UIRED
SEPTIC TANK CAPACITY REOUIRED: 330 GPD X 200 = 660 (MINIMUM)
SEPTIC TANK CAPACITY PROVIDED: 1.500 GALLON SEPTIC TANK
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
f
Proposed Septic Plan
3 Clifford Street
South Yarmouth, MA
Prepared for:
Priscilla Anderson
3 Clifford Street
South, Yarmouth, MA
Prepared by:
All Cape Septic -and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771--4200
allcopesepticOgma il_ Cam
Date: 08/23/22 Sheet 2 of 2
Project No. AC--486--2