HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 9 Lot /�L Zone of Contribution: In Out //Acreage
Commercial: Residential:
A1
Street: �JJ '3 LU01/4-I cea LnEv
Village: Floor Plan: I, - #Bedrooms: a_
0, 0, ,1
Owner:D e' b r'� ; / ;a w, A '- nstaiier: 0 4
Address: Phone:
Phone:
•
Builder: Engineer: f I , \('Nc. S D/.-J
Address: Phone:
Phone:
i
N/A YES I NO
1. Required#of copies received 1r. 1
2. Date of soils exam and percolation test not older than 2 years I 1'
3. 4-5 ft of naturally occurring pervious material, above water table L --
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: I !.� --
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated -•t iown-NGVD if near wetlands _ L-
7. Septic tank minimu ' 10 f rom foundation, deck Var.: V
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: I
10. Leaching minimum 150 ft - drinking well/25 ft irrigation well Var.: j
11. Tank/leaching minimui r 0 ft ' om property line Var.: tJ"/ ee t/
12. System meet's all other s- I.,-• requirements Var.: 1�
13. Uses adjustment for maximum high groundwater Var.:
. 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable L�
17. System meets slope requirements-min. 1/8", !!"preferred 4/
18. System meets breakout requirements PVC liner: Wall: I
19. Specified tee sizes are proper, baffle on
P P p , gasoutlet tee 1/
20. Sewage is under 10,000 gpd for parcel _
21.No garbage disposal
22. System adequately sized for its intended use IV
23.Minimum 6"stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade, pump chamber cover to grade /
25. Inspection port on plastic chambers/leach field /
26. Electrical permit for pump chamber/Separate meter for duplexes c/
27. Pump p system-2" line,weep hole,check valve, tee in dbox,pump size
28. Se tic tank/pump chamber to be factory waterproofed ,"
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: I
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j
33. H-20 loading is subject to vehicular traffic, groundwater I V
34.Title V Application and permit fee, installer signature f
35. Foundation footing min. 2 feet above adjusted ground water for new house
/36. Deed Restriction required max. #bedrooms: max. flow: gpd j I
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: l --- bolo:
/o / A' 2