SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. /`, Lot 5" Zone of Contribution: In Out_ Acreage
/ Commercial: Residential: L_-
Street: .3Q /L U C e r N /-.
Village: Floor Plan: #Bedrooms: 3
Owner: Installer: R, Du '-
Address: Phone:
Phone:
Builder: Engineer: A,v d„C.e r-,l a Z
Address: Phone:
Phone:
N/A YES _ NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years 1./'
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: t./
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimu u i ft from foundation, deck Var.: `�
8.Leaching minimu gr full, 15 ft crawl, 10 ft slab •Var.:,j' V
9.Leaching minimum 10 ft from wetlands Var.: t/'
10.Leaching minimum 150 ft m drinking well/25 ft irrigation well Var.: �'
11.Tank/leaching minimu 10 ft om property line Var.: 5'''
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var. L-
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/"preferred ,/
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use I
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field ✓
26.Electrical permit for pump chamber/Separate meter for duplexes t/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size /
28. Septic tank/pump chamber to be factory waterproofed +/
29. Vent provided if leaching below 3 feet,under driveway/parking I/
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: - L�
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V.
33.H-20 loading is subject to vehicular traffic,groundwater l
34.Title V Application and permit fee,installer signature /
35. Foundation footing min.2 feet above adjusted ground water for new house _ e/ -
36.Deed Restriction required max. #bedrooms: max. flow: gpd l
37. Check area lots for groundwat r/Label groundwater in Assessor's Map
Plan reviewed by: a4t.c,o - ...-