Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / Lot,A V Zone of Contribution: In Out V Acreage 3d v Commercial: Residential:___L---- Street: 7 3 n C r- S A-V-c Village: Floor Plan: #Bedrooms: Owner: Installer: St , � A , � r , /"ivV e r p r i L-t Address: Phone: Phone: Builder: Engineer: "),s i r- v',,,,.,� (L)d y- Address: Phone: Phone: N/A YES NO 1.Required#of copies received ,t/' 2. of soils exam and percolation test not older than 2 years ffiN 3 4-5 of naturally occurring pervious material,above water table ar 4.Foundation 2 ft above high point of road H.P.: Fni ' Var.: l/ 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: t. 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: _ 9.Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: .. 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: / 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.' 15. System not in top or subsoil(A,B horizons)c l moval 5/1----- 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/"preferred :/- 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use / - 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade / 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed V 29.Vent provided if leaching below 3 feet,under driveway/parking ,. 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: ;/ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature -/ 33.H-20 loading is subject to vehicular traffic,groundwater J 34.Title V Application and permit fee,installer signature / 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd l 37. Check area lots for groundwater/Label groundwater in Assessor's Map I PIan reviewed by:_ - 60;0;