HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out_ Acreage
n � Commercial: Residential:
Street: 1pb r (�
Village: Floor Plan: Gam- #Bedrooms: .y)
Owner: .5Z E i e._ t/ �2 / Installer:
Address: Phone:
Phone:
Builder: Engineer: 73 S C.-
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received 4.---
2. Date of soils exam and percolation test not older than 2 years ..---
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5. Water line 10 ft from septic components Var.: .---
6. Benchmark indicated and shown-NGVD if near wetlands /
7. Septic tank minimum 10 ft from foundation,deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /
9.Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11.Tank/leaching minimum 10 ft from property line Var.: t/
12. System meets all other setback requirements Var.: /
13.Uses adjustment for maximum high groundwater Var.: ,tom/
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.`
15. System not in top or subsoil(A,B horizons)or 5'removal /
16.Proposed contours are suitable /
17. System meets slope requirements-min. 1/8", 1/"preferred
18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel /
21.No garbage disposal f
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox /
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes .%
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed /
29.Vent provided if leaching below 3 feet,under driveway/parking /
30. Buoyancy calculations for tank/pump chamber /
31. Engineer to inspect and certify soils: wall: commercial: r
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature /
33.H-20 loading is subject to vehicular traffic,groundwater l'
34.Title V Application and permit fee,installer signature /
35. Foundation footing min.2 feet above adjustedground water for new house /
36.Deed Restriction required max. #bedrooms: max. flow: gpd 1
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by:. _ 6 01 01