Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR3 (10-6-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 3 PAGE 1 OF 2 PROJECT NO: Z486.01 DATE: 10/06/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Rain/Overcast, 44-57 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0630 hours. Left site at 1400 hours. 2. Earthwork equipment: A) Komatsu PC290LC-11 Excavator B) Caterpillar D8T Bulldozer C) CASE Construction SV216 Single Drum Roller D) McCloskey R155 Screener 3. Earthwork observed: A) Excavation operations took place within the proposed stormwater basin area located within the southwesterly portion of the site today (see Site Sketch, Figure No. 1). C.C. Construction excavated up to about 5± feet of natural sand generally consisting light tan, fine to medium SAND, trace Silt, trace (-) Roots, and trace (-) fine Gravel. The excavation terminated in similar natural sand at approximately proposed bottom of basin elevations. B) Cutting operations took place today within the proposed pavement area located within the southwesterly portion of the site (see Site Sketch, Figure No. 1). Up to about 0.5± feet of apparent natural subsoil was cut from the noted area. The exposed subgrade consisted of sand appearing to generally consist of reddish-tan, fine to medium SAND, trace to little Silt, trace Roots, and trace (-) fine Gravel. Proof compaction of the exposed subgrade is planned to take place at a later date. C) Screening operations took place today within the southwesterly portion of the site within the proposed pavement area (see Site Sketch, Figure No. 1). The screening operation was performed to prepare loam material for the base of the proposed stormwater basin area. CC Construction utilized the McCloskey R155 Screener to screen organic material from on-site stockpiled loam. ONSITE: TRAVEL: REPORT: TOTAL: 7.50 hours 1.50 hours 1.00 hour 10.00 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 3 PAGE 2 OF 2 PROJECT NO: Z486.01 DATE: 10/06/22 4. Attachments: Photo Log Figure No. 1 – Site Sketch 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 3 Page 1 of 2 Photograph #1 Description of Photograph: Excavation within proposed stormwater basin. Excavated sandy material stockpiled for re-use in fill areas of the site. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/06/22 Photograph #2 Description of Photograph: Cutting operation in proposed pavement area. (Item 3B) Photograph Taken By: Mackenzie Meschwitz, dated 10/06/22 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 3 Page 2 of 2 Photograph #3 Description of Photograph: Screening operation. (Item 3C) Photograph Taken By: Mackenzie Meschwitz, dated 10/06/22