HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 7 8 Lot 7/ Zone of Contribution: In Out�Acrea_e / �QD J
Commercial: Residential:
Street: 7 (7Qp' , CL -e
Village: Floor Plan: # Bedrooms:
7
Owner: - c, -F"ti/ Installer: !� .-n,-s� R(J 6
Cr
Address: Phone:
Phone:
Builder: Engineer: L _C p ,g, __Sz 74j
Address: Phone: P
Phone:
N/A Y,✓ES I N O 1
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years I
\i/.
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
t8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: j
IJ.d
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: lt
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal ! t�
16. Proposed contours are suitable
17. System meets slope requirements-nun. 1/8", `,!"preferred
18. System meets breakout requirements PVC liner: Wall: i
19. Specified tee sizes are proper, gas baffle on outlet tee ' 1,---'#'4,
20. Sewage is under 10,000 gpd for parcel
21. N
garbage
No, disposal
22.
System V �ys em adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox I 7 i
24. Manhole covers within 6"of grade, pump chamber cover to grade (
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes V
27. Pump system-2" line,weep hole,check valve, tee in dbox,pump size
28. Se tic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: .
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I
33. H-20 loading is subject to vehicular traffic, groundwater t/
34.Title V Application and permit fee, installer signature j
35. Foundation footing min. 2 feet above adjusted ground water for new house
7,/
36. Deed Restriction required max. #bedrooms: max. flow: gpd I /
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: eti__67 6,.,,
/ ) -1{-
01 2