Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. cS Lot//�� ,, a 7 Zone of Contribution: In Out Acreage /4 /Uv Commercial: Residential: Street: 7C i/6,r t �� , Village: Floor Plan: Bedrooms: Owner: ' \C t. r- k l-7 C -' c,I Installer: /D %� rr . Address: / Phone: Phone: Builder: Engineer: /7 0 c.A.-) N CC- p Address: Phone: Phone: N/A YES NO 1. Required#of copies received V' 2. Date of soils exam and percolation test not older than 2 years V 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: / : 6. Benchmark indicated and shown-NGVD if near wetlands V 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: t� 11.Tank/leaching minimum 10 ft from property line Var.: Ll 12. System meets all other setback requirements Var.: _----- 13. Uses adjustment for maximum high groundwater Var.: /, I 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.`. 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable v 17. System meets slope requirements-min. 1/8", '''4"preferred Li 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal .,--- 22. System adequately sized for its intended use 1/ 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade /./ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump,size V 28. Septic tank/pump chamber to be factory waterproofed / % 29. Vent provided if leaching below 3 feet,under driveway/parking / 30.Buoyancy calculations for tank/pump chamber III/// /' 31. Engineer to inspect and certify soils: wall: commercial: '-" 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature ' 35.Foundation footing min.2 feet above adjusted ground water for new house // 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ( Z.. _I._________ _ 60101