HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR6 (10-18-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 6 PAGE 1 OF 3 PROJECT NO: Z486.01 DATE: 10/18/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Cloudy, 60-63 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One Komatsu PC360LCi Excavator B) One Dynapac CA1400D Vibratory Drum Roller C) One Bomag 50/55D Vibratory Plate Compactor 3. Earthwork observed: A) C.C. Construction, Inc. installed drainage manhole structure DMH-5 and connecting 24-inch diameter HDPE drainage pipes at the proposed northwesterly parking area (see attached Site Sketch, Figure No. 1 and Photo Log). The manhole was placed over a layer of crushed stone in a previously excavated trench with the bottom of the structure at approximately Elevation (El) 28± feet. Trenches were excavated on the east and west sides of the manhole to facilitate installation of the connecting HDPE drainage pipes. The drainage pipes were connected to the manhole structure, then C.C. Construction backfilled around the manhole and pipes up to approximately El 38± feet with the previously excavated on-site sandy soil. The sandy backfill appeared to be generally representative of sample no. FS-1 and generally consisted of light tan, fine to medium SAND, trace Silt, trace fine Gravel, and trace (-) Roots. The backfill was placed in approximately 12± inch thick lifts. Each lift of backfill was compacted with about 8± passes of the vibratory drum roller and/or vibratory plate compactor. The lifts of backfill appeared firm and stable under the vibratory action of the roller and plate compactors. The undersigned performed field density test nos. 9 through 22 on the compacted lifts of backfill (see attached Figure No. 1 for the approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet (page 3 of this report) for additional information. ONSITE: TRAVEL: REPORT: TOTAL: 8.00 hours 0.50 hour 1.00 hour 9.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 6 PAGE 2 OF 3 PROJECT NO: Z486.01 DATE: 10/18/22 4. Attachments: Photo Log Figure No. 1 – Site Sketch 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 6 PAGE 3 OF 3 PROJECT NO: Z486.01 DATE: 10/18/22 FIELD DENSITY TEST NO. APPROX. ELEV. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) IN PLACE MOISTURE CONTENT (%) COMPACTION (%) REMARKS 9 28± 113.7 9.5 108.9 3.5 95.8 1,2,3 10 29± 113.7 9.5 108.2 3.5 95.1 1,2,3 11 30± 113.7 9.5 108.3 6.7 95.3 1,2,3 12 30± 113.7 9.5 110.9 3.5 97.6 1,2,3 13 31± 113.7 9.5 109.2 4.0 96.0 1,2,3 14 32± 113.7 9.5 109.1 5.1 95.9 1,2,3 15 33± 113.7 9.5 108.3 5.8 95.3 1,2,3 16 34± 113.7 9.5 108.7 4.8 95.6 1,2,3 17 35± 113.7 9.5 111.6 4.2 98.2 1,2,3 18 36± 113.7 9.5 111.7 3.9 98.3 1,2,3 19 37± 113.7 9.5 108.0 4.6 95.0 1,2,3 20 37± 113.7 9.5 111.4 5.3 98.0 1,2,3 21 38± 113.7 9.5 110.2 6.0 96.9 1,2,3 22 38± 113.7 9.5 111.7 5.4 98.3 1,2,3 REMARKS: 1. Satisfactory compaction percentage achieved at test location. 2. Tested fill material generally representative of sample no. FS-1. 3. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. Mackenzie Meschwitz FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 6 Page 1 of 1 Photograph #1 Description of Photograph: Backfilling DMH-5 and HDPE drainage pipes with existing on-site sandy soil. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/18/22 Photograph #2 Description of Photograph: Compacting backfill placed around DMH-5 and HDPE drainage pipes. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/18/22