Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR7 (10-19-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 7 PAGE 1 OF 3 PROJECT NO: Z486.01 DATE: 10/19/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Sunny, 49-55 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1400 hours. 2. Earthwork equipment: A) One Komatsu PC360LCi Excavator B) One Dynapac CA1400D Vibratory Drum Roller C) One Bomag 50/55D Vibratory Plate Compactor 3. Earthwork observed: A) Drainage utility installation and backfilling took place today within the proposed pavement area located within the southwesterly portion of the site (see attached Site Sketch, Figure No. 1 and Photo Log). C.C. Construction excavated an approximately 3± foot deep trench, extending from about elevation (El) 38± to 35± feet for the installation of an HDPE drainage pipe, and a 10± foot deep pit for the installation of catch basin CB-2 from about El 38± to 28± feet. The excavations were advanced into apparent natural sand generally consisting of light tan, fine to medium SAND, trace (+) Silt, trace Roots and trace fine Gravel. C.C. Construction placed an approximately 6± inch thick layer of ¾-inch crushed stone at the bottom of the pit prior to installing the catch basin. C.C. Construction placed the previously excavated, apparent natural sand as backfill in approximately 12± inch thick lifts around the HDPE drainage pipe and catch basin structure. Each lift was compacted with about 6± passes of the vibratory drum roller or the vibratory plate compactor. Each lift of backfill appeared firm and stable under the vibratory action of the vibratory drum roller and plate compactor. The undersigned performed field density test nos. 22 through 34 on the compacted lifts of backfill (see attached Figure No. 1 for the approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet (page 3 of this report) for additional information. ONSITE: TRAVEL: REPORT: TOTAL: 7.00 hours 0.50 hour 1.00 hour 8.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 7 PAGE 2 OF 3 PROJECT NO: Z486.01 DATE: 10/19/22 4. Attachments: Photo Log Figure No. 1 – Site Sketch 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylla – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 7 PAGE 3 OF 3 PROJECT NO: Z486.01 DATE: 10/19/22 FIELD DENSITY TEST NO. APPROX. ELEV. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) IN PLACE MOISTURE CONTENT (%) COMPACTION (%) REMARKS 22 29± 113.7 9.5 111.7 5.4 98.3 1,2,3 23 30± 113.7 9.5 110.6 3.7 97.3 1,2,3 24 31± 113.7 9.5 109.4 4.1 96.2 1,2,3 25 32± 113.7 9.5 111.9 4.5 98.4 1,2,3 26 33± 113.7 9.5 110.8 4.8 97.5 1,2,3 27 34± 113.7 9.5 109.5 4.5 96.2 1,2,3 28 35± 113.7 9.5 108.9 6.8 95.8 1,2,3 29 36± 113.7 9.5 108.2 3.6 95.1 1,2,3 30 37± 113.7 9.5 108.3 6.5 95.4 1,2,3 31 38± 113.7 9.5 110.9 3.6 97.5 1,2,3 32 36± 113.7 9.5 109.1 3.9 95.9 1,2,3 33 37± 113.7 9.5 108.3 5.9 95.3 1,2,3 34 38± 113.7 9.5 108.7 4.9 95.6 1,2,3 REMARKS: 1. Satisfactory compaction percentage achieved at test location. 2. Tested fill material generally representative of sample no. FS-1. 3. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. Mackenzie Meschwitz FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 7 Page 1 of 1 Photograph #1 Description of Photograph: Installing catch basin CB-2. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/19/22 Photograph #2 Description of Photograph: Compacting backfill around catch basin CB-2. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/19/22