Construction activities at the subject project during the months of August & September,
the following general work has occurred:
1. Unit B
· Selective demolition including cutting and removal of some concrete floors
· Plumbing work including linear trench drains
· Misc electrical work
2. Unit C
· Selective demolition including cutting and removal of some concrete floors
· Plumbing work including linear trench drains
· Misc electrical work
3. Site Work
· Tree clearing and start of grubbing and grading for the new parking areas.
Briggs Engineering and Testing has been retained to conduct concrete, welding and
structural and reinforcing steel testing. Additionally, Northeast Geotechnical Solutions
have been retained for soil and compaction testing. Their reports issued to date have
been sent to you and Mr. Sears via email. Catalyst (CAI) has reviewed their test reports
and have not found any areas of concern. If you have any questions about the testing
reports, please contact my office.
We have been attending weekly job meetings and conducting site visits frequently to
monitor work in progress and adherence to the construction documents. All work
completed to date has been done in a good and workmanship-like manner and in
general accordance with the construction documents and applicable code.
We have attached field reports from our consultants including:
· CES (MEP/FP) Field Observation Report dated 09.28.2022
The following text and images describe some of the highlights of the work recently
completed work:
Pic -1.1
Demo of existing concrete
floors and setting of piping to
for floor drains
Pic-1.2
Vent piping for underslab
piping extended to perimeter
wall with new riser to roof
Pic 1.3
Selective demo of interior
finishes withing the existing
office block to make ready for
new office layout and finishes
Pic 1.4
Controlled backfill at all interior
trenches were monitored by
third party inspectors
Pic 1.4
Clearing of trees to make way
for new truck paring area and
new drainage swale
If you have any questions, please feel free to contact me at any time.
Sincerely,
Kurt Raber
Principal-In-Charge
CC: Tim Sears (Town of Yarmouth Deputy Building Commissioner)
Greg Bilezikian (Owner)
David Fernandes (Dellbrook|JKS)
Marina Denisova (Dellbrook|JKS)
Scott Mitchell (Dellbrook|JKS)
Mike Schmidt (Dellbrook|JKS)
Rick Fenuccio (OPM, ClearPath Advisors)
Kate Wollman (Catalyst Architecture & Interiors)