Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR8 (10-26-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 8 PAGE 1 OF 2 PROJECT NO: Z486.01 DATE: 10/26/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Rain, 46-53 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1400 hours. 2. Earthwork equipment: A) One Caterpillar PC 360 LCi Excavator B) One Bomag 50/55D Reversible Vibratory Plate Compactor 3. Earthwork observed: A) Drainage utility installation took place today within the proposed pavement area located within the southwesterly portion of the site (see attached Site Sketch, Figure No. 1 and Photo Log). C.C. Construction excavated two trenches, approximately 3± ft deep, extending from about Elevations 38± to 35± feet for the installation of HDPE drainage pipes, and two, 10± foot deep pits from about Elevations 38± to 28± feet for the installation of catch basins CB-3 and CB-1. The excavations were advanced into apparent natural sand generally consisting of light tan, fine to medium SAND, trace Silt, trace Roots, and trace fine Gravel. C.C. Construction placed an approximately 6± inch thick layer of ¾-inch crushed stone at the bottom of the pits prior to installing the catch basins. C.C. Construction used the previously excavated sand as backfill around the drainage pipes and catch basin structures. The sand backfill was placed in approximately 12± inch thick lifts. Each lift was compacted with about 6± passes of the reversible vibratory plate compactor. Each lift of backfill appeared firm and stable under the vibratory action of the plate compactor. Field density testing was not performed on this date due to the consistent rain during the backfilling operations. 4. Attachments: Photo Log Figure No. 1 – Site Sketch ONSITE: TRAVEL: REPORT: TOTAL: 7.00 hours 0.50 hour 1.00 hour 8.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 8 PAGE 2 OF 2 PROJECT NO: Z486.01 DATE: 10/26/22 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 8 Page 1 of 1 Photograph #1 Description of Photograph: Excavation for the installation of CB-1. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/26/22 Photograph #2 Description of Photograph: Compaction of a lift of on-site sand backfill around CB-3 and installation of HDPE drainage pipe connecting CB-3 to DMH-2. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 10/26/22