HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR8 (10-26-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT
PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 8 PAGE 1 OF 2
PROJECT NO: Z486.01 DATE: 10/26/22
LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC
WEATHER: Rain, 46-53 ºF CONTRACTOR(S): DellbrookǀJKS; C.C.
Construction, Inc.
1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1400 hours. 2. Earthwork equipment:
A) One Caterpillar PC 360 LCi Excavator B) One Bomag 50/55D Reversible Vibratory Plate Compactor 3. Earthwork observed:
A) Drainage utility installation took place today within the proposed pavement area located within the southwesterly portion of the site (see attached Site Sketch, Figure No. 1 and Photo Log). C.C. Construction excavated two trenches, approximately 3± ft deep, extending from about Elevations 38±
to 35± feet for the installation of HDPE drainage pipes, and two, 10± foot deep pits from about
Elevations 38± to 28± feet for the installation of catch basins CB-3 and CB-1. The excavations were advanced into apparent natural sand generally consisting of light tan, fine to medium SAND, trace Silt, trace Roots, and trace fine Gravel. C.C. Construction placed an approximately 6± inch thick
layer of ¾-inch crushed stone at the bottom of the pits prior to installing the catch basins. C.C. Construction used the previously excavated sand as backfill around the drainage pipes and catch basin structures. The sand backfill was placed in approximately 12± inch thick lifts. Each lift was compacted with about 6± passes of the reversible vibratory plate compactor. Each lift of backfill
appeared firm and stable under the vibratory action of the plate compactor. Field density testing was
not performed on this date due to the consistent rain during the backfilling operations.
4. Attachments: Photo Log Figure No. 1 – Site Sketch
ONSITE:
TRAVEL:
REPORT:
TOTAL:
7.00 hours
0.50 hour
1.00 hour
8.50 hours
Mackenzie Meschwitz
FIELD REPRESENTATIVE
Mark Zambernardi, P.E. REVIEWER
Tel: 508-598-3510
NORTHEAST GEOTECHNICAL, INC.
DAILY FIELD REPORT
PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 8 PAGE 2 OF 2
PROJECT NO: Z486.01 DATE: 10/26/22
5. Distribution:
Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors
Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS
Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner
NORTHEAST GEOTECHNICAL, INC.
Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 8 Page 1 of 1
Photograph #1
Description of Photograph:
Excavation for the installation of
CB-1.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated
10/26/22
Photograph #2
Description of Photograph:
Compaction of a lift of on-site sand
backfill around CB-3 and
installation of HDPE drainage pipe
connecting CB-3 to DMH-2.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated
10/26/22