Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. J / Lot / (1 ( Zone of Contribution: In! ut Acreage J v`/ 9 9 Commercial: Residential: ti' Street: 146 T ' lc CZcz-_c\ Village: Floor Plan: f/ #Bedrooms: 3 Owner: Ait*at yre/ e, i3cei/L Installer: I 0& r Address: Phone: Phone: Builder: ' Engineer: i 0 FN cJ;µ,, c e r•A- Address: Phone: „� Phone: N/A YES I NO 1. Ref uired#of copies received 2. Date of soils exam and percolation test not older than 2 years 1 3.4-5 ft of naturally occurring pervious material, above water table 1 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 1 6. Benchmark indicated and shown-NGVD if near wetlands v 7. Septic tank minimum 10 ft from foundation, deck Var.: 1./- •' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: V. 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: �...--''' 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var. 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable i. 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: ✓ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal - 17 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox ./ 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size Cee. o/ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature - / 33.H-20 loading is subject to vehicular traffic,groundwater c, 34.Title V Application and permit fee, installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house ." 36.Deed Restriction required max. #bedrooms: max. flow: gpd -" / 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:_ _ 6001