Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH � SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 5 lU Lot 2 Zone of Contribution: In Out_ Acreage /, 77 5 2 \ Commercial: Residential: Street: 53 c"-A�1.),..d L..�m Village: Floor Plan: V #Bedrooms: 3 • Owner: jt,iC , c`Pu r c ` Installer: "t di �'�n's��L'..� G 4,1 Address: f' c Phone: Phone: Builder: Engineer: DO,._, , c e -t Address: Phone: Phone: N/A YES NO 1.Required#of copies received ,Y/ 2.Date of soils exam and percolation test not older than 2 yearsit-4/ 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: I, 6. Benchmark indicated and shown-NGVD if near wetlands %/' 7. Septic tank minimum 10 ft from foundation,deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9. Leaching minimum 100 ft from wetlands Var.: C/ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: t• 13. Uses adjustment for maximum high Groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: _ 15. System not in top or subsoil(A,B horizons)or 5' removal - r ,/ 16. Proposed contours are suitable I k 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: V 19. Specified tee sizes are proper,gas baffle on outlet tee �' 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal - ` 22. System adequately sized for its intended use i/ 23.Minimum 6"stone or compacted below tank and dbox t/ 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes iV.27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size i./ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking V 30. Buoyancy calculations for tank/pump chamber {f 31. Engineer to inspect and certify soils: wall: commercial: 1. 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature LI 33.H-20 loading is subject to vehicular traffic,groundwater L, 34.Title V Application and permit fee,installer signature y, 35.Foundation footing min.2 feet above adjusted ground water for new house 1/ 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:_ �,c..� o o3 0; r, -a� - ati