SITE PLAN REVIEW COMMENT SHEET
Date: February 15, 2005
Applicant: Snow&Jones, Inc. New Map: 98 New Lot: 80
Location: 167 White's Path, South Yarmouth Old Map: Old Lot:
Persons Present:
Terry Sylvia Carl Lawson Barfly Jones
Mathew Bearse Karen Greene Dan Ojala
Tim Myland Vern Santos
Bruce Muphy
Proiect Summary
The applicant proposes a new 3000 square foot addition to an existing metal building, presently used for the sale of
plumbing supplies. The new addition would be used for the wholesale sale of plumbing fixtures and would be a
showroom for those clients. The site is located in the B3 Business Zone and within the Aquifer Protection Overlay District
(APD).
Comments
Building: While the Building Commissioner was not present, he did submit the comments below:
1. The use is identified in Table 202.5 as G1. The proposed addition and parking areas lie within the B3
zoning district. A small portion of the northerly side of the proposed addition lies within the R40
zoning district. The entire site lies within the APD.
2. The total proposed impervious lot converge is 72%. Table 203.5, Footnote P limits such coverage to
a maximum of 70%. Therefore a variance is required from the Board of Appeals
3. I am unable to determine if all existing side and rear buffers are compliant and whether additional
parking is being proposed. More definition is required.
4. A special permit as per Section 406 and Table 202.5 or in the alternative a "Determination of Non
Applicability"outlined in Section 406.5.1.1 is required because the site is within the APD.
5. All construction shall comply with the applicable provisions of 780CMR (State Building Code),
including Construction Control.
Conservation: Not pr.,,unt.
Design Review: Not present.
{ Community Development: Project will provide 3-4 additional jobs. Recommended speaking with Building
\t Commissioner/Zoning Administrator regarding the discussion of the retail and wholesale use. Project will allow a local
business to remain competitive and viable.
Engineering: Area underneath proposed addition is currently pervious since no plans were filed for any"existing" site
work there. The applicant proposes to remove pavement from SE corner of site and replace with gravel. Without more
specific information provided, this area will be deemed to be impervious.
, Fire: PIV valve needed, as well as engineered sprinkler plans for the proposed addition. LPG storage concerns
addressed.
Health: All Material Safety Data Sheets(MSDS) should be kept onsite and be available to all employees. Fire Dept.
'— recommendations should be followed regarding the storage and labeling of flammables such as propane tanks.
-2b ‘ Note on plan under septic; the Nitrogen calculation, existing leaching, septic flow in GPD.
No floor drains allowed in building-existing or proposed, (it was stated no floor drains now)
IS Planning: The applicant has indicated that retail sales would also be accommodated, which is not allowed in the B3
district. Since this is an expansion of use, Zoning Bylaw section 301.2 requires that the site meet current parking
requirements or seek relief from the Board of Appeals. Parking spaces nearest to White's Path appear to extend beyond
the front of the proposed addition. If this is the case, relief from 301.4.1, paragraph 2 is needed. If Board of Appeals
action is required, it is suggested that the Board should note in any written decision that the Zoning Bylaw restricts the use
of the site is to wholesale sales only and that retail sales is prohibited. Such a notation might help eliminate future
confusion/misunderstanding.
a' Water: Service and fire line are not to go under the slab, they need to be relocated and shown to the water dept. on a final
plan.
Read & Received by Applicant(s)
TABLE 2
SITE PLAN REVIEW REQUEST AND PROJECT DESCRIPTION FORM
SUBMISSION DATE: 3-11-05 REVIEW DATE: 3 �� Oj TIME: i ; ?�
ASSESSOR'S MAP NO. 98 LOT 80 (Old Map Lot )
LOCATION OF PROJECT: 167 White's Path, S.Yarmouth
NAME OF BUSINESS/PROJECT: Snow & Jones, Inc.
APPLICANT NAME: Snow & Jones
APPLICANT ADDRESS: 167 Whites Path
APPLICANT PHONE NUMBER:
ENGINEER/SURVEYOR Down Cape Engineering, Inc., Daniel A. Ojala
TITLE REFERENCE: see plan REGISTRY SURVEY: see plan
DESCRIPTION OF PROJECT: (attach additional pages if necessary)
This is a modified site plan based on comments received at the 2/15/05 SPR
meeting.
The 3000 sf addition has been modified so that the parking is now to the side of the
addition.
ZONING DISTRICT: B3 FLOOD ZONE: C
BUILDING SIZE: 27,217 footprint (square feet) Attach floor plan(s)
BASEMENT: FIRST FLOOR: SECOND FLOOR:
MAXIMUM NUMBER OF EMPLOYEES:
TO YOU HANDLE/STORE OILS OR HAZARDOUS MATERIALS? None in addition.
IF SO, ATTACH LIST OF THEM BY NAME, QUANTITIES, AND
PROPOSED METHODS OF STORAGE/HANDLING/DISPOSAL/ETC.
BOARD OF APPEALS ACTION EXPECTED: None if APD Waiver granted.
IS THE PROPOSED CONSTRUCTION WITHIN 100 FEET OF A
WETLAND? NO
SIGNED: ' I I dC-
Submit 8 copies of this completed form and the site plan to the Building Department in order to
get your project on the Site Plan Review agenda.A 9th copy is required if within 100 ft. of a
wetland.
1) .
4)#
- - CV
-t- r r C
I_ - SITE PLAN REVIEW
I1
if X FORMAL INFORMALL- -- —
^- - .. a 15 2005 G M@MOMC D
St( FEB 0 4 2005
4 ) y, p
_or HEALTH DEPT.
TO: � �-
ASSESSOR (w/o plans) ENGINEERING DEPT
CONSERVATION FIRE DEPT
PLANNING DEPT (3) WATER DEPT
Planning
Design Review Town Clerk's Office (2)
Econ. Development w/o plans-for posting
HEALTH DEPT BUILDING DEPT
FROM: James D. Brandolini Building Department
SUBJECT: SITE PLAN REVIEW AGENDA
TIME: 1:30PM 0/
NAME OF PROJECT: Snow & Jones, Inc. '
White's Path, S. Y. - --�V
ADDRESS: 167j
MAP: 98 LOT: 80 () ~ d `
NAME OF APPLICANT: Snow & Jones, Inc. )1 r
hair: Health , -----1 1!
TABLE 2
SITE PLAN REVIEW REQUEST AND PROJECT DESCRIPTION FORM
SUBMISSION DATE: 2-3-05 REVIEW DATE: TIME:
ASSESSOR'S MAP NO. 98 LOT 80 (Old Map Lot )
LOCATION OF PROJECT: 167 White's Path, South Yarmouth
NAME OF BUSINESS/PROJECT: Snow & Jones, Inc. �� �S
APPLICANT NAME: Snow & Jones, Inc. 3c.c.J
APPLICANT ADDRESS: 167 White's Path
APPLICANT PHONE NUMBER:
ENGINEER/SURVEYOR Down Cape Engineering, Inc., Daniel A. Ojala
TITLE REFERENCE: see plan REGISTRY SURVEY: see plan
DESCRIPTION OF PROJECT: (attach additional pages if necessary)
This is a Formal Site Plan Review filing for a 3000 s.f. addition to an existing
building. The addition will house additional showroom area for the wholesale
clients. Site improvements include drainage, sidewalks, trees & landscape islands.
ZONING DISTRICT: B3 FLOOD ZONE: C
BUILDING SIZE: 27,217 (square feet) Attach floor plan(s)
BASEMENT: 0 FIRST FLOOR: 27,217 SECOND FLOOR: 0
MAXIMUM NUMBER OF EMPLOYEES: 12 Exist+4 New = 16
DO YOU HANDLE/STORE OILS OR HAZARDOUS MATERIALS? None
IF SO, ATTACH LIST OF THEM BY NAME, QUAN 111 IES, AND Nc c►^anr,
PROPOSED METHODS OF STORAGE/HANDLING/DISPOSAL/ETC.
BOARD OF APPEALS ACTION EXPECTED: Unknown/VD WAwtn
IS THE PROPOSED CONSTRUCTION WITHIN 100 FEET OF A
WETLAND? NO
SIGNED: " 0— 2-W0
f
Submit 8 copies of this completed form and the site plan to the Building Department in order to
get your project on the Site Plan Review agenda.A 9t copy is required if within 100 ft.of a
wetland.
SITE PLAN REVIEW a N @ T N7 i
FORMAL INFORMAL X MAR 16 2005
March 29, 2005 HEALTH DEPT.
TO:
ASSESSOR (w/o plans) ENGINEERING DEPT
CONSERVATION FIRE DEPT
PLANNING DEPT (3) WATER DEPT
Planning
Design Review Town Clerk's Office (2)
Econ. Development w/o plans-for posting
/ HEALTH DEPT BUILDING DEPT
FROM: James D. Brandolini Building Department
SUBJECT: SITE PLAN REVIEW AGENDA
TIME: 1:30PM
NAME OF PROJECT: Snow & Jones, Inc.
ADDRESS: 167 White's Path, S. Y.
MAP: 98 LOT: 80