Loading...
HomeMy WebLinkAboutDRC Planner Review Memo 060322 T O W N O F Y A R M O U T H 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-24451 Telephone (508) 398-2231, Ext. 1276, Fax (508) 398-2365 MEMORANDUM To: Design Review Committee From: Kathy Williams, Town Planner Date: June 3, 2022 Subject: Revitalization Overlay Architectural District (R.O.A.D) Application 2022-1 1276 & 1282 Route 28, South Yarmouth MA For the June 7, 2022 Design Review Committee (DRC) meeting, please find attached ROAD Application 2022-1 for a proposed development at 1276 & 1282 Route 28 in South Yarmouth (Assessor Map 60/Parcels 131& 132). The application was submitted to the Planning Board on May 13, 2022 by Ekaterina & Family LLC and Jay Imad (Jay Mart), and is located in the B2, HMOD1 and ROAD zoning districts. The Applicant is proposing to demolish all existing buildings on the two sites and construct a gasoline filling station with five dispensers, overhead steel canopy, and a 6,560 sf mixed use building. The mixed-use building would have a convenience store, coffee shop area and drive-thru on the first floor, and four (4) residential apartments on the second floor. The lots currently contain five cottages, a small convenience store and two gas pumps with canopy. The DRC originally reviewed this project on January 18, 2022 in an advisory capacity. Subsequently, the Applicant is proposing to develop the project using Zoning Bylaw Section 411 – Revitalization Overlay Architectural District (ROAD). For ROAD projects, the Planning Board serves as the Design Review Authority and will be holding their Public Hearing on June 15, 2022. The application is also distributed to the Design Review Committee (DRC) for their input and comments which will be provided to the Planning Board. For ROAD projects, the Planning Board will need to determine whether the project substantially adheres to the Yarmouth Architectural and Site Design Standards (“Standards”). Should the Planning Board make this determination, the Applicant would be able to seek relief from the Zoning Board of Appeals through a Special Permit rather than requiring any Variances. The attached application materials include a narrative from the Applicant outlining how they feel they substantially adhere to the Standards for the Siting Strategies (no narrative was provided for the Building Strategies). Also included in the application materials are the 1/18/22 Design Review Comment Sheet, the 4/19/22 Site Plan Review Comment Sheet, and modified project plans. Planning Division