HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. �c� Lot a 6 47 Zone of Contribution: In Out - ' Acreagele , 1g 7
` z v C U 1�C Commercial: Residential:_
Street: / ' _G/
Village: Floor Plan:Qt.)
# Bedrooms: 3Owner: Installer: i r ',►✓ S. � 'c ,
Address: Phone:
Phone:
Builder: Engineer: N C3 A..) c' e ricA,c ( JCS er
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received Y
2.Date of soils exam and percolation test not older than 2 years %
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ;/
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands !/
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: - G/
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.::
15. System not in top or subsoil(A,B horizons)or 5' removal / '
16. Proposed contours are suitable v'
17. System meets slope requirements-min. 1/8", ' "preferred ✓'
18. System meets breakout requirements PVC liner: Wall: l/'
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal I./.
22. System adequately sized for its intended use 1.
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade l
25. Inspection port on plastic chambers/leach field ,-------
26. Electrical permit for pump chamber/Separate meter for duplexes _ 1/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size N.,/
28. Septic tank/pump chamber to be factory waterproofed Vi
29. Vent provided if leaching below 3 feet,under driveway/parking 1,
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:,
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature i.
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature C/
35.Foundation footing min. 2 feet above adjusted ground water for new house C7
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: _ 60101
C. < l' e-d 2--