Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In X Out' Acreage 47, ''//,, Commercial: Residential: Street: �� � �`(� Village: Floor Plan: (/ #Bedrooms: Owner: Installer: ?A41 If l/�/ ,-1 )(1 i v/h 141 Address: Phone: Phone: Builder: Engineer: b vim/1_ C Address: Phone: Phone: N/A YES / NO 1. Required#of copies received ✓/ 2. Date of soils exam and percolation test not older than 2 years / 3. 4-5 ft of naturally occurring pervious material, above water table ✓ 4. Foundation 2 ft above high point of road H.P.: 7 9 Fnd:PO Var.: ✓ 5. Water line 10 ft from septic components Var.: `✓ 6. Benchmark indicated and shown-NGVD if near wetlands // 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ✓ 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5' removal ��// 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper,gas baffle on outlet tee <..---20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use / 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes / 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size ►/ / 28. Septic tank/pump chamber to be factory waterproofed 1/ 29. Vent provided if leaching below 3 feet,under driveway/parking / 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. H-20 loading is subject to vehicular traffic, groundwater ,✓ 34. Title V Application and permit fee,installer signature 1./35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 7, 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: iliti6/03/03