HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In X Out' Acreage
47, ''//,, Commercial: Residential:
Street: �� � �`(�
Village: Floor Plan: (/ #Bedrooms:
Owner: Installer: ?A41 If l/�/ ,-1 )(1 i v/h 141
Address: Phone:
Phone:
Builder: Engineer: b vim/1_ C
Address: Phone:
Phone:
N/A YES / NO
1. Required#of copies received ✓/
2. Date of soils exam and percolation test not older than 2 years /
3. 4-5 ft of naturally occurring pervious material, above water table ✓
4. Foundation 2 ft above high point of road H.P.: 7 9 Fnd:PO Var.: ✓
5. Water line 10 ft from septic components Var.: `✓
6. Benchmark indicated and shown-NGVD if near wetlands //
7. Septic tank minimum 10 ft from foundation, deck Var.: ✓
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ✓
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: /
15. System not in top or subsoil(A,B horizons)or 5' removal ��//
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee <..---20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use /
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes /
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size ►/ /
28. Septic tank/pump chamber to be factory waterproofed 1/
29. Vent provided if leaching below 3 feet,under driveway/parking /
30. Buoyancy calculations for tank/pump chamber ✓
31. Engineer to inspect and certify soils: wall: commercial: ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓
33. H-20 loading is subject to vehicular traffic, groundwater ,✓
34. Title V Application and permit fee,installer signature 1./35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd 7,
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: iliti6/03/03