Loading...
HomeMy WebLinkAbout2936C Definitive Subdivision 117 SP Plan Set 101922YARMOUTH, MA OWNER INFORMATION: �a S�16P1 � Maur ROMAN CATHOLIC BISHOP OF FALL RIVER P°m ano Rd C/O ST. PIUS X PARISH Ba0�ac\e R a P� 450 HIGHLAND AVENUE FALL RIVER, MA 02720 APPLICANT INFORMATION: THE DAVENPORT COMPANIES 20 MAIN STREET SOUTH YARMOUTH, MA 02664 J,M,. O'REILLY & AssOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street — Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DEFINITIVE SITE PLAN SET 5� 53 LOCUS' 0/ cy °a cll�to h �r 0 KEY MAP NOT TO SCALE MIRACLE WAY - FAITH ROAD SUBDIVISION ASSESSORS' ID: 125/39 YARMOUTH, MASSACHUSETTS PREPARED FOR THE DAVENPORT COMPANIES DRAWING INDEX SHEET NO. SHEETTITLE CO COVER SHEET C1 EXISTING CONDITIONS PLAN C2 SITE LAYOUT PLAN C3 ROAD/UTILITY PLAN & PROFILE C4 GRADING & DRAINAGE PLAN C5 DETAILS & NOTES C6 CURB CUT PLAN C7 STORMWATER CONTRIBUTORY AREA PLAN C8 VEHICULAR TRAVEL PLAN C9 LANDSCAPE PLAN LAST REVISION DATE 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 10.19.2022 C10 WATERSHED DELINEATION PLAN #2936C 10.19.2022 G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg SO L TEST LOGS: TEST HOLE 7: EL=35.9± TEST HOLE 9: EL=50.2± TEST HOLE 13: EL=42.0± \/A nn A/ll ITI 1 MA TEST HOLE 1: EL=37.8± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-8 A Fine Loamy Sand 10YR3 1 NONE 8-24 B Fine SandV Loam 10YR7 4 NONE 24-75 C1 Fine Sand 10YR7 8 NONE 75-162 C2 I Medium Sand 10YR6 8 I NONE 5% Cobbles TEST HOLE 2: EL=40.2± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-8 A Fine Loamy Sand 10YR3 1 NONE 8-29 B Fine Sandy Loam 10YR7 4 NONE 29-121 C1 I Fine Sand I 10YR6 6 I NONE 121-144 C2 I Coarse Sand 5YR6 8 I NONE TEST HOLE 3: EL=58.0± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-9 A Fine Loamy Sand 10YR3 1 NONE 9-29 B Fine Loamy Sand 10YR7 4 NONE 29-128 C1 Coarse Sand 10YR6 6 NONE 10% Cobbles TEST HOLE 4: EL=58.1± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-8 A Fine Loamy Sand 10YR3 1 NONE 8-25 B Fine Loamy Sand 10YR7 6 NONE 25-58 C1 Coarse Sand 10YR6 6 NONE 10% Cobbles 58-120 C2 Coarse Sand 10YR7 4 NONE TEST HOLE 5: EL=47.8± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-10 A Fine Loamy Sand 10YR3 1 NONE 10-18 B Fine Loamy Sand 10YR7 4 NONE 18-122 C1 I Coarse Sand I 10YR6 6 I NONE TEST HOLE 6: EL=62.8± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-8 A Fine LoarnV Sand 10YR3 1 NONE 8-26 B Fine Loamy Sand 10YR7 4 NONE 26-65 C1 Coarse Sand 10YR6 6 NONE 10% Cobbles 65-115 C2 Fine Sand 10YR7 3 NONE 115-133 C3 Coarse Sand 10YR6 6 NONE DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-6 A Fine Loamy Sand 10YR3 1 NONE 6-24 B Fine Loamy Sand 10YR5 8 NONE 24-47 C1 Loamy Sand 10YR6 8 I NONE 15% COBBLES 47-162* C2 Med-Crs Sand 10YR6 8 I NONE 15% COBBLES *PERCHED GW @ 156", EL=22.9± TEST HOLE 8: EL=28.1± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-6 A Fine Loamy Sand 10YR3 1 NONE 6-27 B Fine Loamy Sand 10YR7 4 NONE 27-96 C1 Coarse Sand I 10YR6 6 I NONE 10% COBBLES *PERCHED GW @ 84", EL=21.1± DATE OF TESTING: 5/28/2020 (TEST HOLES 1-8) WITNESSED BY: ROBERT REEDY, J.M. O'REILLY & ASSOCIATES, INC. GROUNDWATER ENCOUNTERED @ 156", EL=22.9± IN TEST HOLE #7 / a ? p _ p2 Back of Berm (— — —� (40' Wide- S ,YpO�u o,�e PO QUO/ A DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-8 A Fine Loamy Sand 10YR3 2 NONE 8-28 B Loamy Sand 10YR6 8 NONE 28-120* C1 Med- Crs Sand 10YR7 6 NONE *PERC @ 40"; DRY IN 4:37 MINUTES TEST HOLE 10: EL=64.1± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B Loamy Sand 10YR6 8 NONE 14-42 C1 Fine Sand 10YR7 8 NONE 42-120* C2 Med- Crs Sand 10YR7 6 NONE *PERC @ 24"; DRY IN 13:00 MINUTES TEST HOLE 11: EL=37.8± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B Loamy Sand 10YR6 8 NONE 14-42 C1 I Fine Sand I 10YR7 8 I NONE 42-120* C2 I Med- Crs Sand I 10YR7 6 I NONE *PERC @ 29"; DRY IN 12:51 MINUTES TEST HOLE 12: EL=28.4± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B LoamV Sand 10YR6 8 NONE 14-42 C1 Fine Sand 10YR7 8 NONE 42-120* C2 Med- Crs Sand 10YR7 6 NONE *PERC @ 41"; DRY IN 12:01 MINUTES Top of Mass Highway Bound Mass. Coord. System: N: 2720847.75 E: 1006864.30 NAVD88 Datum: E L=53.4± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B Loamy Sand 10YR6 8 NONE 14-42 C1 Fine Sand 10YR7 8 NONE 42-120* C2 Med- Crs Sand 10YR7 6 NONE *PERC @ 31"; DRY IN 7:30 MINUTES TEST HOLE 14: EL=48.2± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B Loamy Sand 10YR6 8 NONE 14-42 C1 Fine Sand 10YR7 8 I NONE 42-120* 1 C2 Med- Crs Sand 10YR7 6 I NONE *PERC @ 38"; TIMED: 9"-6" IN 6:40 MINUTES, 2:13 MIN/IN TEST HOLE 15: EL=54.2± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-7 A Fine Loamy Sand 10YR3 2 NONE 7-14 B LoamV Sand 10YR6 8 NONE 14-42 C1 Fine Sand 10YR7 8 NONE 42-120* C2 Med- Crs Sand 10YR7 6 NONE *PERC @ 37"; DRY IN 4:15 MINUTES DATE OF TESTING: 8/26/2022 (TEST HOLES 9-15) PERCOLATION RATE: LESS THAN 5 MIN/INCH IN'C1' &'C2' LAYERS. WITNESSED BY: ROBERT REEDY, P.E., J.M. O'REILLY & ASSOCIATES, INC. AMANDA LIMA, P.E., YARMOUTH E- NO GROUNDWATER ENCOUNTERED NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND — — 32 EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE — W— WATER SERVICE LINE —E— UNDERGROUND ELECTRIC SERVICE TP TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX SAS SOIL ABSORPTION SYSTEM Reserve RESERVED FOR FUTURE cob UTILITY POLE ® CATCH BASIN `Cr FIRE HYDRANT DRAINAGE MANHOLE _ ,5, Back of Berm Q�'a ■ CONCRETE BOUND, FOUND LIMIT OF WORK D (CLTO CL) Paved —x—x— ..-40 .09'TOHOCKANO --—�-------- � Drive FENCE ' — — s----GUARDRAILS Highway) — ?, EDGE OF CLEARING 1 ��_. /FIND _�� Ed e of Pavement — — — �> '— �_ TO �30.06, OUTWARD REACH (C( TOPavemen— aved / t Puiio f{ TP1 / / / / // / / / / / / / / 60 a s _------- ri s C LbT2 AREA = 666,Q7 SF± 62 r\ - I TP4 A Bo Ider / / / / \ \ \ / eo \ 1 l 32 TP15 iP8 \ \ \ III - to TP12 TP7o/ B Ider — I f pQ \ \ ✓ / / / / \/ ~ �TP13 ,/ / / / / / / / / / sp \ I 1 1 I I I O/ \ I / I I So / TP6 \ \ \ \ —�-- W W � W W— \ — I — — —w-�W o W62 W" TOW 60 W N OF yARMO — W� �f,�TH WATER EASEMENT � ELECTRICAL EASEMENT 1so' WIDE 1?o _ /` � r � ' — e ated Wetland � / d� (Per a ofG6 DF? Wetlands Layers ` All, 10 — Y 00 �G c� 200.21' 0 50 100 150 SCALE 1" = 50' AG - EILEEN STREET 48 (40' Town Way) Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± CB, FIND 0 C oD o� �o �rn n 12 C 1 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA EXISTING CONDITIONS PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA S&-vov� J.M. OTEILLY & ASSOCIATES, INC. �OQ�� Professional Engineering & Land Surveying Services �#2936C G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg 1573 Main Street — Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 YARMOUTH, ZONING: ZONING DISTRICT: R-40 REQUIREMENTS: LOT AREA: 40,000 SF FRONTAGE: 150 FEET FRONT SETBACK: 30 FEET SIDE SETBACK: 20 FEET REAR SETBACK: 20 FEET BUILDING COVERAGE: 25% SINGLE FAMILY CLUSTER DEVELOPMENT REQUIREMENTS: CLUSTER CALCULATIONS: TOTAL LOT AREA: 666,507 SF± WETLAND AREA: 545 SF± TOTAL UPLAND AREA: 665,962 SF± AREA UNDER EASEMENT: 120,098 SF± 10% OF EASEMENT AREA: 12,009 SF± TOTAL AREA FOR CLUSTER: AVAILABLE LOT AREA = (665,962- 120,098) + 12,009 = 557,873 SF± NUMBER OF LOTS ALLOWED: 557,873 / 40,000 = 13.95 - 14 LOTS LOT AREA: 10,000 SF LOT WIDTH AT BLD'S: 100 FEET FRONTAGE: 100 FEET* (50' IF 100'x100' SHAPE CAN FIT) FRONT SETBACK: 25 FEET SIDE SETBACK: 12 FEET REAR SETBACK: 20 FEET LOT COVERAGE: 25% OPEN SPACE: 30% MINIMUM PER YARMOUTH ZONING BYLAWS, SECTION 402.7.3- DIMENSIONAL REQUIREMENTS: *'THE MINIMUM REQUIRED FRONTAGE MAYBE REDUCED TO FIFTY (50) FEET IF THE LOT IS CAPABLE OF CONTAINING A SQUARE, EACH SIDE OF WHICH IS 100 FT. NO POINT OF ANY SIDE OF THE REQUISITE SQUARE SHALL EXCEED A DISTANCE FROM THE STREET GREATER THAN 250 FEET.' 'SETBACK FROM BOUNDARY OF DEVELOPMENT NO DWELLING WITHIN A CLUSTER DEVELOPMENT MAY COME CLOSER TO THE BOUNDARY OF THE DEVELOPMENT THAN FIFTY (50) FEET. NO ACCESSORY STRUCTURE SHALL BE PLACED WITHIN 30 FEET OF THE FRONT LOT LINE, WITHIN 10 FEET OF A SIDE LOT LINE, OR O WITHIN 12 FEET OF ANY OTHER BUILDING. ACCESSORY STRUCTURES OF UP TO 150 / SQUARE FEET MAY NOT BE PLACED CLOSER THAN 10 FEET FROM A REAR LOT LINE. ACCESSORY STRUCTURES OF 150 SQUARE FEET OR MORE MAY NOT BE PLACED CLOSER THAN 20 FEET FROM A REAR LOT LINE.' nark of Berm Edges rn z �0 I m rn �-A n �#2936C OPEN SPACE CALCULATIONS: LOT 1 11,425 SF± LOT 2 16,171 SF± LOT 3 14,070 SF± LOT 4 16,755 SF± LOT 5 18,856 SF± LOT 6 20,567 SF± LOT 7 13,197 SF± LOT 8 22,792 SF± LOT 9 22,508 SF± LOT 10 15,459 SF± LOT 11 13,757 SF± LOT 12 20,711 SF± LOT 13 17,360 SF± LOT 14 23,244 SF± TOTAL: 246,872 SF± ROAD AREA: 48,694 SF± EASEMENT OUTSIDE OF LOTS (TOTAL): 25,026 SF± TOTAL OF ROAD, EASEMENTS AND LOTS: 320,592 SF± OPEN SPACE PROVIDED: (557,873- 320,592) = 237,281 SF± (237,281 / 557,873) X 100% = 42.5%±> 30% MIN SHAPE KEY: I- 100' x 100' SHAPE REQUIREMENT J 00 DWELLING FOOTPRINTS (AS SHOWN) = 46' x 28' Q� SEWAGE SYSTEM KEY 33.5' x 12.83' x 2.0' LEACH CHAMBERS SOIL ABSORPTION SYSTEM- 4 BR (2) 49.0' x 2.0' x 2.0' LEACHING TRENCHES SOIL ABSORPTION SYSTEM- 4 BR 0 1500 GALLON SEPTIC TANK MA NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND 32 EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE _W_ WATER SERVICE LINE —E— UNDERGROUND ELECTRIC SERVICE e TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX E Top of Mass Highway Bound SAS SOIL ABSORPTION SYSTEM Mass. Coord. System: N:2720847.75 Reserve cob RESERVED FOR FUTURE UTILITY POLE E: 1006864.30 NAVD88 Datum: ® CATCH BASIN Qa EL=53.4± 17 ® FIRE HYDRANT DRAINAGE MANHOLE Back of Berm � ■ CONCRETE BOUND, FOUND CLTO CL) _ _ _ _ — Paved -----_-_-_ —X—X— LIMIT OF WORK FENCE T 401.09'TOHOCKANOMRD( -_- Drive �—_----_ o?,`� GUARDRAILS (40 Wide-StateHighway)� EDGE OF CLEARING FND z wI 430.06 Tp OU � TW �— ----------------- -- SIGHT EASEMENT U, ---wl �� / P� �� _ gRpREgC (��T Pave � H ment n LU l 3 _ O a ved 0 CL) �- z1 / t Pullo ff 137.17' c 14I17' C) o / " � aVe --_—__ DrIV - - - - - I--_-__ N c3 ' 32.64, - - ----� 1 — LOT 7 / 4 .45' — I �Q> 25.5' 13,197 SF± zo "" I m OPEN SPACE ��� �J M �- I `` I �W M ~I m " TOTAL AREA = 237,826 SF± o �° 1 � o Q 1 � = 01 0 WETLAND = 545 SF± I 1 -- 46.6'± I C UPLAND = 237,281 SF± 1 + 60 ti c9 1 I 46.70, 25' --� : ro I L 22, 2 - .14' m l + T v 24.1'± �D z 24'N o w 0 L 60 I 59zs, 2 I rn LL 11 LL N "o1 r �� N �M 2215 - 92.05' I u D Ci 1, s �' 1 z �� I o > o 1 11,425 SF 21 85, n I 96.38' \ \ I 1 Q r� 96.91' y ' , > 3_ W Q6 ----_ 52.5'± \ 36.9 y I cb4� +i x a Q CDo R 43 \ 0 � - M c9 Cr 30.0'± w I Lo n LOT 2 S,8 _ �— 3 0 o w \ � 60.0'± o 0 16,171 S F± LOT--r2 L 1 C? LOT 10 +T � m 20,711 SF± SF± I 20 \ m o 15,459 SF± I 1 06 k. I o 3�) �cP,�� 1 3 vy J k J CD+I ssX g k 0� \''� G SLR Agg 17 �I m CD 69.9'± b� / W W W 0+50 w W 30.0'± z o 25' I Jl k vJ� 1+00 _--�-0 �m �t oLU 25' �k F�� sue, ti ti ��_ w o1 3 0 14, 0 SF± LOT 13 ti �� � / _ � oOPE E P, I m o O /� __ ASEMENT �5, C9 o I 5 0 Ln 17,360SF± P�� ti.�P/// 1 �, �T �2 142.84 FUTURE SEWER A73'35 EASEMENT — W — W— / 3+50 c� 3+8 100.12 , LLJ )0 P00 / 66x \ \ \ Ln C� 96 / , 1 A 19 8 . U 6 �� O° °� �� S1 Lu LOTS + /W / o 2 3, 244 S ± E`vNG 16,7 S F± / 4jo� Z2.36' 32.8/+ C - 11421` o o - / l 46R DWELLING l l o TOF EL=65.0± l / / 41.4'+ \ 41111 p WELLING l � / M LOT �2.1 �+ / / TOF EL_65.0± 20 /i li 3f.S'+ o EIL °EEN STREET 0 LOT S / (40'Town Way) 18,856 SF 122.36' ` � � — / / + / � _ / — 3 / W W� W— /— 122 36, - - W / J W —W W o OF YARMOU — WITH WATER EASEMENT — ELECTRICAL EASEMENT 180' WIDE \ 13526 • 91 10°.fore � - - - - - 1 / to ated wetland i, (per ass s GIS DEP wetlands Layer) ` 01/1 I. Ali, .li, — — — 200.21' 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± �C B, FND C2 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA SITE LAYOUT PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA J.M. O'REILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 PVI STA = 0+43.76 PVI ELEV = 53.77 A.D. = 5.0 K = 9.67 48.34' VC � n QO co m o PVI STA = 2+10.57 PVI ELEV = 58.77 A.D. = 6.0 K = 19.16 114.94' VC �oLn PVI STA = 3+95.47 PVI ELEV = 53.22 A.D. = 8.0 K = 13.77 110.18' VC O 100 u-) o m m Nj 64 RO EDGE OF PAVI EL 56 52 48 44 40 1 + + +, +�I CD .-I I I N V1 m L/1 �,,, I ��, v w v w v v w ii w I m D v w co m ww mmI DIm= ww Iww 0Iz0 + 00 CD m C7 to I Iz I I I I I I I .MENT I I r I m � = 3•o.o o0 v o O o O C Tl D 2.0% ID O z r o m C-) I o D OIL Un +o m � I O STA 3+83.06- 0+38.92- ONE (1) SOLID m D IOLSTA TWO (2) SOLID I CATCH BASIN o -0 z In �Im CATCH BASINS RIM EL=53.8 M I RACLE WAY RIM EL=54.10 0 OID I � I cn o�o �Iz I Iz Im I Im I Io Iz I I I I z I O ci� ° 1p 'n N � U1 U1 al ° O � ti N r" L I d U 1 �o ° O ° N I N H �p r m ry r d uj n pl m d . Ql o o1�6 al " rn Ql o al . co M o U1 n n o w Ul Ul Ul Ul Ul O Ul Ul U, Qc I CI- I -0+50 64 56 52 48 44 40 36 32 0+00 0+50 1+00 PVI STA = 0+33.09 PVI ELEV = 53.64 A.D. = 4.0 K = 7.96 31.84' VC 00 1+50 + m O U-) + i 'n vu v co co I I I I FAIT I STA 0+52.79- TWO.(2) SOLID CAT iH BASINS 0/ I (CAST ADE GR RIM EL=52.2 rpD I� DID SIP Im D 6�0 w + I� 00 n w O Z m Iz m Iz m IUn m C7 to Iz 1+95.14- TA TWO (2) SOLID ' CATCH BASINS (CASCADE GRATES) RII M E L=43.6 Q_.)o X°°I�o w , °� Ln Ln O� Qc cl- -0+50 0+00 0+50 WATER MAIN NOTES: 1.) ALL WATER WORK SHALL BE IN ACCORDANCE WITH THE YARMOUTH WATER DEPARTMENT WATER MATERIALS AND INSTALLATION STANDARDS. 2.) THE WATER MAIN CONNECTIONS AT THE ROUTE 6A- MIRACLE WAY AND FAITH ROAD- MIRACLE WAY INTERSECTIONS SHALL INCLUDE A CUT -IN TEE WITH TRIPLE GATE CLUSTER, AS SHOWN ON THE PLAN. SEE DETAIL. 3.) THE WATER MAIN CONNECTION AT THE 12" YARMOUTH WATER DEPARTMENT EASEMENT SHALL INCLUDE A CUT -IN TAPPING SLEEVE AND VALVE, AS SHOWN ON THE PLAN. 4.) EACH OF THE FOUR (4) FIRE HYDRANTS SHALL INCLUDE A GATE VALVE IN THE CONNECTION TO THE WATER MAIN. 5.) PROPOSED WATER MAIN SHALL MAINTAIN A MINIMUM 5 FEET OF HORIZONTAL SEPARATION FROM ALL DRAINAGE STRUCTURES. 5.) CONTRACTOR SHALL COORDINATE DIRECTLY WITH THE TOWN OF YARMOUTH WATER DEPARTMENT REGARDING FINAL WATER MAIN DESIGN, AND METHODS AND MATERIALS FOR THE MODIFICATION OF MUNICIPAL WATER SERVICE, INCLUDING INSPECTION, TESTING AND DISINFECTING REQUIREMENTS. 56 52 48 1+00 1+50 (2) WOODEN GUARDRAIL SE, 2' OFFSET FROM ROAD L (SEE DETAIL AND ROAD CROSS-S ON C5- DETAILS & I PROPOSED HYDRANT WITH GATE VALVE 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 PVI STA = 7+F,137 PVI STA = 3+47J9 I rater\\ne R°ao cX�s�r\g5\Ope E EX�,�ngate\y 2 p /° PPPr��x�m OID C� mm m D ROUTE 6AI Im mI7u n � 'n ri 'n m m N v 'n z Im m O 70 'n I m n n O w un Io Z ME 56 52 48 -150' -100' -50' 0+00 +50' +100' +150' TRIPLE GATE CLUSTER k_1 j 8" WATER MAIN W NOT TO SCALE ho GATE VALVE / W WATER MAIN / / J TEE , 'ALVE / 3 z , , 3 TOWN OF YARMOUTH I — WATER EA W ES MENT W PROPOSED 8" WATER MAIN CONNECTION WITH EXISTING 12" WATER MAIN USE CUT -IN TAPPING SLEEVE WITH VALVE SEE WATER MAIN NOTES G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg M 64 Of 56 ROAD PROFILES HORIZONTAL SCALE: 1"=40' VERTICAL SCALE: 1"=4' 52 48 44 40 EXISTING CENTERLINE PROPOSED CENTERLINE pRnpn,pn i imnFRr,ROUND ELECTRIC / SERVICE CONNECTION AT )LE JECTION WITH EVERSOURCE) ,IN CONNECTION > MAIN JECTION WITH NATIONAL GRID) _R MAIN CONNECTION HATER MAIN TH TRIPLE GATE CLUSTER -TAIL & WATER MAIN NOTES :ONNECTION /LAIN GATE CLUSTER ATER MAIN NOTES YARMOUTH, NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE PO / DRY WATER QUALITY SWALE CONNECTED 24x5 PROPOSED SPOT GRADE VEGETATION TO BE CUT BACK WITHIN SIGHT EASEMENT AREA AS REQUIRED TO ALLOW CLEAR AND CONTINUOUS ST ORMWATER MANAGEMENT SYSTEM. EXCESSS FLOW - - WATER SERVICE LINE yy / VEHICLE SIGHT DISTANCE FROM THE PROPOSED INTERSECTION. CONTINUES TO LEACHING FACILITY. BOTTOM OF SWALE=48.5± - E - UNDERGROUND ELECTRIC SERVICE TEST HOLE / BORING LOCATION A` OUTLET RIM=50.0± ST SEPTIC TANK OUTFALL PIPE (WITH SPLASH PAD)=50.5±(MIN.) DB DISTRIBUTION BOX Top of Mass Highway Bound X 14' STO LEACHING FACILITY: SAS SOIL ABSORPTION SYSTEM Mass. Coord. System: N: 2720847.75 LEACH PITS, (2) 6'� X 6' LEACH PITS, 14' ON CENTER (2) WITH STONE AROUND INLET INVERT=47.0± Reserve RESERVED FOR FUTURE cob UTILITY POLE / E: 1006864.30 NAVD88 Datum: BOTTOM OF LEACHING=42.0± ® CATCH BASIN 4z Q EL=53.4± WOODEN GUARDRAILS 27 FIRE HYDRANT @ SLOPED AREA p DRAINAGE MANHOLE / s Back of Berm ■ CONCRETE BOUND, FOUND / s p .--40 .09' TO HOCKA 0 --- - -- --- RD (CLTO CL) -\ - \ - _ (1) MANHOLE Paved RIM=54.0± Drive INLET INVERTS=51.0± s -x-x- LIMIT OF WORK FENCE erm OUTLET INVERT=50.9± GUARDRAILS RU Back of B (-- �40' Wide-Sta�e Highway) i \ 351.06 _ EDGE OF CLEARING Fii,D 43 C--7 ROOF RUNOFF DRYWELL Ed e of Pavement � 52- Og TO OU _ _ � ��IGHT EASE�vI� - 9�.p�, - TWgRp Edge o _ Back of Berm --------- ��� �� _ __---�__ �_ T- J �Q I - / o' / 48x5 REgCH CL TO Pavement o / / / / / / ' A _ 50 I / l "� aved/ t pulloff- / RE 0 I x�-x%Lx L SERVE �ioQ 2 �% /_ 60 /LOIN L0 ri 58---------- I DRY WATER QUALITY SWALE DRY WATER QUALITY SWALE (2) CATCH BASINS W/ CASCADE GRATES• RIM=43.6± OUTLET INVERT=41.1± (1) MANHOLE RIM=43.8± IN LETINVERTS=40.9± OUTLET INVERT=40.8± sz- x CD LU OPEN SPA E /' �� ,;�/ /o���;;�� \ o� ► I C TOTAL AREA �37,826 SF_ �� / I � I'll 61 1 I \ WETLAND = 45 SF± I f / / ul a �' O UPLAND = 237 2 $F±\ I / 5a I - I l o x 25' RIM 53 8+(2) CATCH BASINS C / - ± OUTLET INVERT-51.3_ aLO" Ln I 60 1 _ 62 / 9 2 - s6 T I +1 n ROOF RUNOFF DRYWELL (TYPICAL) \ I I N s o CULTEC RECHARGER 330XLHDJ -01 w (2) UNITS IN SERIES (15.5' x 4.33') Q TOTAL OF (4) UNITS PER DWELLING 59 x D x sO \ / � I I \ IG H T I �/ �N •'�� in4� a4 I ` OINT I 15 SF x ti LLJ I § 'R LOT 21 / 2) CATCH BASINS W/ CASCADE GRATES /� I RIM=52.2± 16 1 SF+ OT42 L 1 OUTLET INVERT=49.7± f / \ ?� �6 n / \ ` / (1) MANHOL EOT 0 E 20,711 S�± F± INLET INVERTS =49.5±15,459S X OUTLET INVERT=49.4±c� j/ I z j I / (1) CATCH BASIN RIM=54.0± OUTLET INVERT=51.5± S1 / 1 ( f 0 s0 34 37 \ _ 1+00 _ - +_ - 010 14, 0 F v+- / DRY WATER J (1) MANHOLE C� ; I / I E-3 QUALITY SWALE RIM=39.9± c_ \ \ \ `' �� as INLET INVERT=37.5± \ \ OUTLET INVERT=37.4± 32 \ T 13 \W / "o �• � SL P EASEMENT �0 15 DRY WATER \ S6 1 6 �j POINT / '`�, n I QUALITY SWALE 3� , � - L1�py / /�+ I I 1' + (1) MANHOLE \ ^ / 1 A RIM=38.6± E SE INLET INVERTS=35.5± AS OUTLET INVERT=35.4± (2) CATCH BASINS 0m v 3+82I\� �+ RIM=38.2± _ Ln + 1 1\ I OUTLET INVERT=35.7± I \ / I \ if 10 M2 DRY WATER QUALITY SWALE CONNECTED TO STORMWATER MANAGEMENT SYSTEM. °o 0 J� / / / 1� EXCESS FLOW CONTINUES TO LEACHING FACILITY. Qo 5 I I rn \ BOTTOM OF SWALE=33.0± 4� - \ 9J` / OUTLET RIM=34.5± ✓ \ �F2 40 _ O / N OUTFALL PIPE (WITH SPLASH PAD)=35.0_ (MIN.) Q \ ` O / o co V orI o DRY WATER I I 62 / I / ��OX, \ x / QUALITY SWALE WOODEN GUARDRAILS \ %t / / A� / /�/ - / 1 C,�"� ��,'0 @ SLOPED AREAS 70' X 28' STORMWATER LEACHING FACILITY: s \ \ t / / �l 1 SF:Y / / + I u1 (10) 60 X 6' LEACH PITS, 14' ON CENTER s4 \ \ �3124,4 ± O�ENk / WITH STONE AROUND \ \ \ \ + WE��I�Q 450- J / INLET INVERT=31.5± s6 \ \ \\ �OF BOTTOM OF LEACHING=26.5± 58 \ �� ! // x _ �3Q / 6 x_ x OR ROOF RUNOFF DRYWELL (TYPICAL) of WORD T 48R DWELLING l / 5 / \ \ CULTEC RECHARGER330XLHD /� \ \ �IMIi / \ I / �J, OF EL=6S.0-r 4 (2) UNITS IN SERIES (15.5' x 4.33') / 1 / \ J ( / i TOTAL OF (4) UNITS PER DWELLING / T�FDWELLING s LOT 1 /� L 65.0± 4- ' / \\ 1,EILEENSTRE STREET LO \ \ 1 / / I �C (40 Town Way) - 68 �I 7p N 12 TOWN OF YARMOU TH WATER EASEs4` s2 So MENT - � ELECTRICAL EASEMENT 1so' WIDE 1?o • �� IN c4 ` 10 - 1 100, kill �G G r e ated Wetland (Per Ma ofG6 0F? Wetlands Layer) � I'll \ All, �#2936C 200.21' 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site PIans.dwg w 00 �o N IW Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± ___4VC B, FND C4 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA GRADING & DRAINAGE PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA o� �� J.M. OTEILLY & ASSOCIATES, INC. �OQ�� Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 ROADWAY PAVEMENT SECTION: DRIVEWAY PAVEMENT SECTION: w z_ J LU v� 2' (MIN. 1�P�S�Oe 3 GAS MAIN CABLE/ELECTRIC LINES - 9 1/2" DENSE GRADE CRUSHED STONE BASE ((2) 4 3/4" LIFTS)* (MIN) 4" CLEAN SAND (SUB -BASE) ALL ROADWAY FILL SHALL BE CLEAN SAND PLACED IN (MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST (*SEE BELOW NOTES FOR SPECIFICATIONS ON ROAD CONSTRUCTION WITHIN ROUTE 6ASTATE HIGHWAY LAYOUT) STATE HIGHWAY LAYOUT PAVEMENT NOTES: • PROPOSED ROADWAY (WITHIN SHLO) SHALL HAVE AN 8" GRAVEL BASE THAT HAS BEEN MACHINE COMPACTED THEN PAVED WITH 4" OF HOT MIX ASPHALT (HMA) LAID IN TWO COURSES CONSISTING OF A 2-1/2" BINDER COURSE AND A 1-1/2" FINISH COURSE. • ANY EXISTING HMA BERM THAT EXISTS WITHIN THE PROPOSED DRIVEWAY MUST BE SAWCUT AND REMOVED. THE NEW PAVEMENT MUST TIE INTO, AND NOT OVERLAP, THE EDGE OF THE HARDENED SURFACE OF THE ROADWAY. ALL ABUTTING EDGES OF THE EXISTING PAVEMENT SHALL BE COATED WITH A HOT POURED JOINT SEALER IMMEDIATELY PRIOR TO THE PLACEMENT OF THE HMA. M1 DRAINAGE FACILITY SECTION: NOT TO SCALE erm 24"x24" Cast Iron Frame and Grate Raised to Grade Use EJIW LF248-2 OR EQUAL 12" DIAM. HDPE @ 1% PITCH in 4' n Solid 4' Dia. Catch Basin USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL 24" Diam. Cast Iron Frame and Cover Raised to Grade Use EJIW LK 110A or Equal Berm 4' Solid 4' Dia. Manhole USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL M2 DRAINAGE FACILITY SECTION: NOT TO SCALE erm 24"x24" Cast Iron Frame and Grate Raised to Grade Use EJIW LF248-2 OR EQUAL �� If 12" DIAM. HDPE @ 1% PITCH rn irl 4' 4 . Solid 4' Dia. Catch Basin USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL 12" DIAM. HDPE @ 1% PITCH 30'± 24" Diam. Cast Iron Frame and Cover Raised to Grade Use EJIW LK 110A or Equal Berm RIM=38.6± 4' 4 Solid 4' Dia. Manhole USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL w z_ J W TYPICAL WOODEN GUARDRAIL CU1I 4" TOPSOIL 8" WATER MAIN 5' MINIMUM SEPARATION FROM ALL DRAINAGE STRUCTURES M2 Dry NOT TO SCALE REQUIRED ACTACESS PRUNING ZONE (12, LL X 14' WIDE? 10' (ACCESS) 2, 20' (PARKING) 2' 0_1��� Sao 1 /4" PFR FOOT PITCH Lti. 1" FINISH COVER (ROLLED) 1.5" BINDER COURSE (ROLLED) 4" DENSE GRADE CRUSHED STONE BASE (14' WIDE) (MIN) 4" CLEAN SAND (SUB -BASE) ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN (MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST HOT MIX ASPHALT NOTES: • ALL HOT MIX ASPHALT (HMA) PAVEMENT SHALL BE CONSTRUCTED PER MASSDOT'S 2021 STANDARDS AND SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, SUBSECTION 460: HOT MIX ASPHALT PAVEMENT FOR LOCAL STREETS. • EACH HMA PAVEMENT COURSE SHALL BE COMPRISED OF ONE OF THE MIXTURE TYPES LISTED ON TABLE 460.10-1, SUBSECTION 460. Water Quality Swale SEE SWALE NOTES RIM=50.0+ / BOTTOM=48.5± RIP -RAP SPLASH PAD SEE RIP -RAP DETAIL 12" DIAM. HDPE @ 1% PITCH M1 STORMWATER LEACHING FACILITY: SCALE: 1"=20' M2 STORMWATER LEACHING FACILITY: SCALE: 1"=20' 30'± STRAW WATTLE/EROSION CONTROL DETAIL: TYPICAL SECTION Fill 3" Height Wood Stake FLOW DIRECTION Straa�w Wattle Existing Grade 1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE MANUFACTURERS SPECIFICATIONS. 2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING CONSTRUCTION. 3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED TRANSFORMER PAD DETAIL: NOT TO SCALE D 0 w • 3 3 4.0' Transformer Pad Shrub Planting (Typ.) 7Z24"x24'W" Tall 'Beehive' Cast Iron Frame and Grate Raised to Grade Use EJIW 1020-01 OR EQUAL 8" MAX. WATER DEPTH ------- 12" DIAM. HDPE @ 1% PITCH Solid 4' Dia. Catch Basin USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL M2 Dry Water Quality Swale SEE SWALE NOTES RIM=34.5± BOTTOM=33.0± RIP -RAP SPLASH PAD SEE RIP -RAP DETAIL 24" Diam. Cast Iron Frame and Cover Raised to Grade (ALL 5 UNITS) Use EJIW LK 110A or Equal t - - 1000 Gallon Leaching Pit (6'x6'0) USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL 28' x 14' x 6' Leaching Facility: (2) Pits, spaced 14' on center with stone 24"x24'W" Tall 'Beehive' Cast Iron Frame and Grate Raised to Grade 7ZUse EJIW 1020-01 OR EQUAL 18" MAX. WATER DEPTH 12" DIAM. HDPE @ 1% PITCH :n 4 m _-_- - - s Solid 4' Dia. Catch Basin USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL DRIVEWAY NOTES: • IN ORDER TO ALLOW SAFETY VEHICLE ACCESS TO DRIVEWAYS, ALL DRIVEWAYS SHALL BE 10' WIDE WITH 2' GRASSED SHOULDERS ON EACH SIDE (2% MAX. GRADE). • GRASSED SHOULDERS SHALL BE UNDERLAIN WITH CRUSHED STONE BASE, AS SHOWN, TO PROVIDE ADDITIONAL SLOPE STABILITY FOR SAFETY VEHICLE ACCESS. • VEGETATION SHALL BE PRUNED TO ALLOW A 14' WIDE, 12' TALL ACCESS WAY. STORMWATER POLLUTION PREVENTION PLAN: PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION. 24" Diam. Cast Iron Frame and Cover Raised to Grade (ALL 5 UNITS) Use EJIW LK 110A or Equal 1000 Gallon Leaching Pit (6'x6'0) USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL 70' x 28' x 6' Leaching Facility: (10) Pits, spaced 14' on center with stone TYPICAL CATCH BASIN & MANHOLE SECTION NOT TO SCALE PIPE CONNECTIONS TO Solid 4' Dia. Solid 4' Dia. Solid 4' Dia. Catch Basin Manhole Catch Basin USE H-20 USE H-20 USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL NOTE: ALL MANHOLE RIM AND INVERT ELEVATIONS ARE CALLED OUT ON THE C4- GRADING & DRAINAGE PLAN. 1.) TYPICAL PAD -MOUNTED TRANSFORMER SHOWN IS FOR LAYOUT PURPOSES ONLY. EVERSOURCE TO PROVIDE DESIGN LAYOUT AND SPECIFICATIONS FOR ALL ELECTRICAL UTILITY WORK. 2.) EACH UTILITY TRANSFORMER LOCATION SHALL BE SCREENED AS SHOWN ALONG THE SIDES AND BACK OF THE TRANSFORMER PAD, USING (6) OF THE SHRUB PLANTINGS SPECIFIED FOR THAT AREA OF THE DEVELOPMENT ON THE LANDSCAPE PLAN. 3.) MAINTAIN A MINIMUM OF T SEPARATION BETWEEN PLANTINGS AND THE TRANSFORMER, TO ALLOW PROPER PERFORMANCE AND MAINTENANCE. 4.) THE FRONT OF THE TRANSFORMER (THE SIDE FACING THE ROADWAY, WITH ACCESS DOORS) SHALL BE KEPT FREE OF SHRUBS, TO ALLOW ACCESS FOR MAINTENANCE. WOODEN GUARDRAIL SECTION: NOT TO SCALE DRAINAGE CONSTRUCTION NOTES: 1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20. 2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH PLANNING BOARD & ENGINEERING SPECIFICATIONS. 3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED AND APPROVED BY THE ENGINEERING DEPARTMENT. CATCH BASIN AND LEACHING NOTES: 1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS PARKING AREAS AND SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6-INCH LIFTS. COMPACTION SHALL MEET 95% STANDARD PROCTOR REQUIREMENTS. ALL BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED STONE WITH A MAX SIZE OF 3/4" OR ENGINEERED APPROVED EQUAL. 2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN ENGINEER SHALL INSPECT THE SOILS AROUND AND BELOW THE LEACHING FACILITY PRIOR TO FACILITY INSTALLATION. 3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE FINISHED WITH MORTAR CEMENT. 4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED WITH BINDER COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET INTO CATCH BASINS. 5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO PROTECT DRAINAGE DURING CONSTRUCTION OF THE ROADWAY. 6.) THE TWO CATCH BASINS AT STA 1+95.14 ON FAITH ROAD SHALL BE FITTED WITH CASCADE STYLE GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 6%SLOPE AREA OF THE ROAD. ROOF RUN-OFF: 1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES USING 6" ADS PIPE. 2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT INTO (2) 15.5' X 4.33' LEACHING FACILITIES. 3.) LEACHING FACILITIES SHALL BE SET FULLY INTO CLEAN SAND. NO STONE REQUIRED ACCESS ROAD: 1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE PROPOSED ENTRANCE FOR DUST/SILT CONTROL. 2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED. SWALE NOTES: 1.) ALL (7) SWALE SOIL BEDS AND LOWER SLOPED AREAS SHALL BE A MINIMUM OF 18" DEEP AND COMPOSED OF APPROXIMATELY 50% SAND AND 50% LOAM. UPPER SLOPED SWALE AREAS SHALL BE COVERED WITH A MINIMUM OF 4 INCHES OF LOAM. SEE SWALE DETAIL BELOW. 2.) ALL SLOPED SWALE AREAS SHALL BE COVERED WITH JUTE NETTING EROSION CLOTH, SECURED IN PLACE. 3.) SOIL BED AND SIDE SLOPES SHALL BE SEEDED WITH MEADOW / WILDFLOWER SEED MIX. APPLICATION RATE SHALL BE PER MFG'S SPECIFICATIONS. SIDE SLOPED AREAS SHALL BE PLANTED WITH NORTHERN BAYBERRY AND WINTERBERRY SHRUBS. SEE C9- LANDSCAPE PLAN. SWALE DETAIL: NOT TO SCALE VARIES �~ (2' MIN.) ~I I I I I 18"(min) � PERMEABLE SOIL - - _ _ - _ _ 6 (min) (50% SAND, 50% LOAM) ------- FILTER FABRIC 3/4" TO 1-1/2" STONE NATIVE SOIL SUB -BASE - FREE FROM LOAM / ORGANIC MATERIAL (4) 3/4" Galvanized Bolt & Nut Fasteners, per post 3x9 Wood Railing 00 0O 00i 00 EXISTING GRADE 6> ' ' O.C. O.C. RIP -RAP DETAIL FOR OUTFALL PIPE: LOW PIPE 6 Wood Posts 12' RIPRAP NOTES: 1.) RIP -RAP SHALL BE PLACED INTO CLEAN SAND, FREE OF SILT AND DEBRIS. 2.) RIP -RAP STONE SHALL BE 6" TO 8" STONE PLACED IN RANDOM PATTERN WITH UNEVEN SURFACE SO AS TO REDUCE DISCHARGE ENERGY. 3.) THE BED OF RIP -RAP SHALL BE 1.5 FEET THICK. 4.) RIP -RAP STONE SHALL BE LAID ON A DOUBLE LAYER OF FILTER FABRIC. AIRED END SECTION UTLET GUARD G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg YARMOUTH, , f ll7c S Work Zane Sa" STATFONARY OPERATIONS Standard Oeetails TWO LANE U14 DWI DED ROADWAY w�h_jrorr�aaa �••,"N� and Drawings SHOULDER CLOSED PAGE 22 CHANNELIZAI DE',1ICE5 rDRUM5 OR CONES, POSTED SPACING FOR SPEED ADVANCE WARNING SHOULDER BUFFER DEVICE M'•a LIM1 _ SIG14S (FT) TAPER ZDNE SPACING 4 DF .MP- (A,B,C) LENGTH LENGTH (Li?- FT' (FTi __-- 5MI5my500 11C 25 50B 1 low 11000 220 49115 zC 120a3v 1 DDD ; ICN .' 2600 260 645 - ' NUMBER OF DEVICES BASED ON 400 FT WOR K ZONE NOTES 1. MA-112-1 Da at C,2 and Al2. LEGEND ® WORK ZONE • CHANNELkZATION DEVICE FLASHING AR3ROW BOARD Ef] PORTABLE CHANGEABLE MEGSAGE SIGN ® TRUCK mouNiTED ATTENUATOR Q RADAR SPEED FEEDBACK BOARD POLICE DETAPL OR U14IFOR MED FLAG GER TEMPORARY PORTABLE RUMBLE STRIA u TYPE III BARRICADE NOT TO SCALE VV2051 O'VL;L I t MA-R2-1Ua ❑31 gnou S3N13 EN G33dS 3NOZ ; T MA-R2-1De P _4 Er'bd ROAD WORK r I41_r _41 � H v_ BUFFE3 �r. SHOULDER - - 4YDR1{ + ROAD � 1JI4RRD}h'S '1'k'5-1 s I O N3 SEI M = WORK MW -9I SPEEDING MA-R2-1 Da FINES )Q10 4 DOUBLED CIVGd GN3 t ROAD U41O#1K W,_D-1 xxx PrV Drk ZanDetails e Sa" FIGURE 8 � !7753 Standard STATIONARY OPERATIONS 7NOLANE UNDrVIDED ROADWAY rur:yo" and Drawing= SHOULDER CLOSED PACE 23 TRAFFIC CALCULATIONS: PER TABLE ON PAGE 22 OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) WORK ZONE SAFETY FLIPBOOK OFFSET WIDTH, W =4' POSTED SPEED LIMIT, S = 45- 55 MPH SHOULDER TAPER LENGTH, L = WS = (4)(55) = 220' BUFFER ZONE LENGTH = 495' CHANNELIZATION DEVICE SPACING = 40' DISTANCE 'A' = 500' DISTANCE 'B' = 1000' DISTANCE 'C' = 1000' NOTES Cb CD 0 LU L T__j LU ] - FOR UNDERLYING EMPIRICAL REFERENCES AND EQUATIONS, SEE TABLES 6H.3 & 6H.4 OF THE MUTCD. - SEE 'FIGURE 8: TWO LANE UNDIVIDED ROADWAY, SHOULDER CLOSED' ON PAGES 22-23 OF THE MUTCD WORK ZONE SAFETY FLIPBOOK. TRAFFIC NOTES: 1. ALL TEMPORARY TRAFFIC CONTROL WORK SHALL CONFORM TO THE LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ALL REVISIONS, UNLESS SUPERCEDED BY THESE PLANS. 2. ALL SIGN LEGENDS, BORDERS AND MOUNTING SHALL BE IN ACCORDANCE WITH THE MUTCD. 3. TEMPORARY CONSTRUCTION SIGNING AND ALL OTHER TRAFFIC CONTROL DEVICES SHALL BE IN PLACE PRIOR TO THE START OF ANY WORK. 4. TEMPORARY CONSTRUCTION SIGNING, BARRICADES, AND ALL OTHER NECESSARY WORK ZONE TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM THE HIGHWAY OR COVERED WHEN THEY ARE NOT REQUIRED FOR CONTROL OF TRAFFIC. 5. SIGNS AND SIGN SUPPORTS LOCATED ON OR NEAR THE TRAVELED WAY, CHANNELIZING DEVICES, BARRIERS, AND CRASH ATTENUATORS MUST PASS THE CRITERIA SET FROTH IN NCHRP REPORT 350, "RECOMMENDED PROCEDURES FOR THE SAFETY PERFORMANCE EVALUATION OF HIGHWAY FEATURES" AND/OR "MANUAL FOR ASSESSING SAFETY HARDWARE" (MASH). 6. THE FIRST 10 DRUMS IN ANY TAPER SHALL BE EQUIPPED WITH SEQUENTIAL FLASHING LIGHTS. 7. MAXIMUM SPACING OF TRAFFIC DEVICES IN A TAPER IS EQUAL IN FEET TO THE SPEED LIMIT IN MPH. 8. MINIMUM LANE WIDTH IS TO BE 11 FEET UNLESS OTHERWISE SHOWN. MINIMUM LANE WIDTH TO BE MEASURED FROM THE EDGE OF DRUMS OR MEDIAN BARRIER. 9. ALL SIGNS SHALL BE MOUNTED ON THEIR OWN STANDARD SIGN SUPPORTS. 10. ROADWAY SPEED IS >/= 45 MPH, THEREFORE A TRUCK MOUNTED ATTENUATOR IS REQUIRED. ATTENUATOR SHALL BE PLACED AFTER THE BUFFER ZONE, IN FRONT OF THE WORK ZONE. CURB CUT DETAIL SCALE: 1"=10' 301+ NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND 32 EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE — W— WATER SERVICE LINE —E— UNDERGROUND ELECTRIC SERVICE e TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX SAS SOIL ABSORPTION SYSTEM Reserve RESERVED FOR FUTURE cob UTILITY POLE ® CATCH BASIN 17 FIRE HYDRANT ® DRAINAGE MANHOLE ■ CONCRETE BOUND, FOUND —X—X— LIMIT OF WORK FENCE --�-�-� GUARDRAILS EDGE OF CLEARING LnQD MHB, V + ' r� + 1 FND 64Lo + L° ' nl LO 31 p4 ► �0, � � � m / 24. 00 0 (0 R / (40,z9�/ . �9 o� I l le Sta `N� to 1 i gh wa CDLY SSD = 7 50' ± , P' � � 62 � WEST �O EASTERLY SSD �9 0 IA O STATE HIGHWAY LAYOUT SHOULDER TREATMENT: IN ORDER TO MAXIMIZE SITE DISTANCE, CONTRACTOR SHALL CLEAR ALL VEGETATION O� GREATER THAN 2.5' IN HEIGHT THAT IS WITHIN THE SIGHT DISTANCE ZONE (AREA BETWEEN DX\SIGHT EASEMENT LINE AND EDGE OF ROUTE 6A PAVEMENT). Top of Mass Highway Bound - ALL DISTURBED AREAS WITHIN THIS ZONE SHALL BE LOAMED & SEEDED AFTER O Mass. Coord. System: CONSTRUCTION PER THE STANDARDS OF MASSDOT'S 2021 STANDARDSAND SPECIFICATIONS N: 2720847.75 FOR HIGHWAYS AND BRIDGES, M6.03.0: LONG-TERM SEED MIXES FOR LAWNS AND SLOPES. E: 1006864.30 - GRASS SEED MIX SHALL CONFORM TO THE REQUIREMENTS OF TABLE M6.03.0-2: GRASS SEED /NAVD88 Datum: REQUIREMENTS FOR SLOPES AND SHOULDERS. a E L=53.4± ell rn Back of Berm °11,° MHB, ' I 64 M" FND 401.09' TO HOCKANOM RD (CLTO CL)i — M-WB _ _ -e — — � \ � aved R n �� _ _63 MDriv 67 — I'�U' —'—'—' 65 r 17p �' e -e ' — ' — (40' Wide- State Highway) ® HB �.— _ _ ... FND WESTERLY SSD = 750'± W �52 ' SIGHT EASEMENT 6Z Ed e g of P , w 48x5 P / x P \ ' (o' , 430.06 Tp ent EASTERLY SSD = 7 0 o - / I z _ 50 - _ p /� I aved t p�lloff 'OUT WARD REACH (CL T x /— X -G X —4 x - b �" I Pave — ' — 9 _L) � - / , ��x --_ OPEN SPACE TOTAL AREA = 237,826 SF± WETLAND = 545 SF± UPLAND = 237,281 SF± I / I ���N T81 \ — Soo os \ h I �X 58 21 5 + 20,711 SF± SF± \ J 0 / I � �#2936C SCOT 7 131197 SF+ zo J � J W J p w Amy o z o, OT 0 15,459 S + mo \5� PE EASEMENT � 4b � �� O I / � I x iC I I l o I 25' o I G:\AAJobs\THE DAVENPORT COMPANY ROUTE 6A YARMOUTHPORT\DWG\Definitive Site Plans.dwg O C oD o 110 QJ ^D C6 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA CURB CUT PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA J.M. O'REILLY 8C ASSOCIATES, INC. Professional Engineering &Land Surveying Services 1573 Main Street -Route 6A P.O. Box 1773 (508)898-6601 Office Brewster, MA 02831 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 YARMOUTH, \� rrn z (] O m l I �#2936C PO o /y//,� � CONTRIBUTORY AREA LEGEND — — — = MAIN CONTRIBUTORY AREA BOUNDARIES M 1 = MAIN CONTRIBUTORY AREA — = SECONDARY CONTRIBUTORY AREA BOUNDARIES S 1 = SECONDARY CONTRIBUTORY AREA — — — — = TIME OF CONCENTRATION PATHWAYS = PRE -DEVELOPMENT CONTRIBUTORY AREA BOUNDARY M3 = DWELLING ROOFS NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND — — 32 EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE — W— WATER SERVICE LINE —E— UNDERGROUND ELECTRIC SERVICE IP TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX �W Top of Mass Highway Bound SAS SOIL ABSORPTION SYSTEM Mass. Coord. System: N:2720847.75 Reserve cob RESERVED FOR FUTURE UTILITY POLE E: 1006864.30 NAVD88 Datum: ® CATCH BASIN 42 Q EL=53.4± 27 FIRE HYDRANT / a DRAINAGE MANHOLE s Back ofBerm � � ■ CONCRETE BOUND, FOUND RD (CLTO CL) —\ _ Paved ------ —x—x— LIMIT OF WORK -- — \ _ —40 .09' TO HOCKANO — _ _ Drive S FENCE �� --- \ A2 _ — _ _ ?``` GUARDRAILS Back of Berm L_ — —� (40' Wide- Stae Highway) �^^^ ^� EDGE OF CLEARING F D Ed e of Pavement — — _ \ / / / 52— ` — 0.06 TO _ � OU Back of Berm ---� c=Z�� c = —---�—J 7—� j'�% J TI / 48x5 9 '0p' D TwgREd�ep — �/ / REACH (CL TO Pavement aved CQ— 5Qa t PU//O ff 60 0 \1 00 u x I C)W\` \ J 1 \ 0 oLO c \ \ I Ok0 SO s\ \ o z I -°I 7�7 �S1 wW I � J LL ._ I! 2 4 / L.LI w J \IG a I 0 \ J / J ) / . F�' / Ln 0) — > Lu LL / 60 I L 41 o w 32 � 4 I �/ X I 1 I I I 0)M i A/ /A / / / / OSXS I NN& s \\ I I I I \ \✓1 /` ` 40 �— / / / / / 1 1 ICI Ln �00 SS / o 'X 58 \ i / L OF L=65. 4 TOF E� ELLI� — — ► I - r �, I LEN STREET E I((40'Town way) �\ I 68 70 72 _ � _ TO60 W s8 s N N OF YARMOUD TH s s4 s2 S WATER EASEMENT — � ELECTRICAL EASEMENT 1so' WIDE 1?o • �� IN c4 - 10 — 1 390 00 c' � �G G N _ /` r e ated Wetland ' 1� (Per dge Ma ofG6 pEP Wetlands Layer) ` All, O 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site PIans.dwg w 00 �o N IW Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± CB, FND C7 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA STORMWATER CONTRIBUTORY AREA PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA J.M. OTEILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 YARMOUTH, r, z C7 �0 m l ) �#2936C FIRE TRUCK SPECIFICATIONS. SCALE: 1"=10' 45.01 11.15 20.41 E-One Cyclone II 95 HP Feet Width : 9.51 Track : 9.35 Lock to Lock Time : 6.0 s Steering Angle : 43.4 deg PO o Top of Mass Highway Bound Mass. Coord. System: N: 2720847.75 � E: 1006864.304.30 NAVD88 Datum: 4z Q EL=53.4± / z Back of Berm — — — � Q� p p .-40 .09' TO HOCKANO RD (CLTO CL)_ —\ _ \ _ Back of Berm L — —� — �40 Wide- Sta�e Highway) i \ 351.06 — — F D � Ed e of Pavement — — 52— ��� �_� Back ofBe�--------- c — — / �_ 7—�j�?--T s / 48x5 / I 5 J 1 I IJ J/ Aj NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND ■ CONCRETE BOUND, FOUND ■ MASS HIGHWAY BOUND, FOUND + ► VEHICLE CENTERLINE & DIRECTION FRONT TIRES PATH REAR TIRES PATH VEHICLE BODY SWEPT PATH rive 97 U6 43p 0g T 0 OUTWgRO REgCHdge o paveme _ / (CL TO L nt 1 aved� — — 90 Sa Puuort ri ss 6 � 77�V, I � \ I I 0 62 \ 0D O O \ � rn in CID � 4 +I 0 o w 1 �ILL \ �4 � \ \� 60 / LnoIr w / � O \ W I Q I 00 1 1 1 I l l � X �� / I l / � v� \ /♦ 4 Q \ 0 00 (0 / / 62 I I \ W i Ui 58 5 so \ \ ~ 4 D ELLIOGOF bz6S. l \ \ EL 7-OF EL_LIN6 \ \\ \ \ \ 4s EILEEN ST R (40 Town Way) 6872 If - N ➢ �� o N >z / / / / // 6 N TOWN OF YARM ATER EASEMENT s4 s2 So — � ELECTRICAL EASEMENT 1so' WIDE 1?o • �� IN c4 - 10 — 1 �G G N _ /` r e ated Wetland / d� (Per dge Mass G6 pEP Wetlands Layer) ` All, 200.21' 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg w 00 �o N IW Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± ----4vC B, FIND C8 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA VEHICULAR TRAVEL PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA J.M. OTEILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street — Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 TREES BOTANICAL/COMMON NAME CONYARMOUTH, T CITY SHRUBS BOTANICAL/COMMON NAME CONT CITY MA Comptonia peregrina / Sweet Fern 1 gal 84* *Foundation Plantings (Each Dwelling): Quercus rubra / Northern Red Oak 2" Cal 40 ° • (6) Sweet Fern F� N,a�n5cl6Pl .., • (4) Wild Hydrangea ,�° \ Hydrangea arborescens / Wild Hydrangea 7 gal 81* • (2) Inkberry Holly s°` Qom a"°Rd • (2) Fragrant Sumac Barnac\eRa � o Acer rubrum / Red Maple 2" Cal 39 �a\nS��6P �d 5X o a Eileen Hydrangea quercifolia / Oakleaf Hydrangea 7 gal 86 3 C \N A \ Cornus florida / Flowering Dogwood 2" Cal 14 ��� 9o�s9� \ Ilex glabra / Inkberry Holly 3 gal 204* `q \' Ilex opaca / American Holly 7-8' B&B 24 �� \ Ilex verticillata / Winterberry 3 gal 74** **Drainage Swale Plantings: �Qr6 • Northern Bayberry & Winterberry shall be \\ Amelanchier alnifolia / Serviceberry 10 Gal 28 planted in all sloped areas along drainage swale ** edges (wet soil areas), as shown on Plan. ��� NOT TO SCALE Hamamelis virginiana /Common Witch Hazel 2 Myrica pensylvanica / Northern Bayberry 3 gal 183 Cal 22 • Meadow /Wildflower Seed Mix shall be used to Qom provide groundcover within each drainage PLAN BOOK 326 PAGE 22 Thuja plicata /'Green Giant' Arborvitae 6-8' B&B 8 Rhus aromatica / Fragrant Sumac'Gro - Low2 gal 49* swale, as shown on Plan. ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 0 • Use 'New England Erosion Control / Restoration DEED BOOK 2776 PAGE 322 Total Trees: 175 Mix for Detention Basins and Moist Sites' ASSESSORS' MAP 125 PARCEL 39 \ Vaccinium angustifolium / Lowbush Blueberry 1 gal 107 produced by New England Wetland Plants Meadow/ Wildflower Seed Mix** (newp.com/catalog/seed mixes). See provided �;;;;;;;;;;;; product specification sheet for full plant listing. (New England Erosion Control /Restoration Mix ;;;;;;;;;;;; Viburnum dentatum /Viburnum 3 gal 118 Restoration Planting Area Total Shrubs: 986 GENERAL NOTES: 1. IF ANY OF THE SPECIFIED PLANT SPECIES ARE UNAVAILABLE OR NOT FEASIBLE (1) RED MAPLE TO OBTAIN, THEY MAY BE REPLACED WITH AN EQUAL AMOUNT OF EQUIVALENT -SIZED NON-INVASIVE SHRUBS AND/OR TREES THAT HAVE SIMILAR Undisturbed Natural Area (3) INKBERRY HOLLY CHARACTERISTICS TO THE SPECIFIED PLANT SPECIES. (40) LOWBUSH BLUEBERRY (6) NORTHERN BAYBERRY 2. SHRUB PLANTING LAYOUT SHALL BE MODIFIED AS REQUIRED TO PROVIDE ADEQUATE SCREENING FOR PAD -MOUNTED TRANSFORMERS AND OTHER (3) WINTERBERRY UTILITY STRUCTURES (LOCATION TO BE DETERMINED BY UTILITY PROVIDERS). Cape Cod Lawn Area (1) SERVICEBERRY (8) °GREEN GIANT" ARBORVITAE SEE UTILITY SCREENING DETAIL ON 'C5 - DETAILS & NOTES'. (1) COMMON WITCH HAZEL (3) AMERICAN HOLLY (1) FLOWERING DOGWOOD (1) NORTHERN RED OAK \ \ -- s B ck of erm r NOM RD (CL, 0 CL) Paved 4 �— ' 09 O HOCKA — — I Drive Berm --____--�--- --- \ --- - \ _T s Back of — �— — —� - - -_ 351. — - Iz- --- Edge of Pavement - �^^' — - 1 - — m - � REgCHd Paveme Back of Ber t — ,, TWgRD 6e o ,4 ,,, C�To CL Paved/ 40 %i ,,,; 58 60 „ri ------------- MEADOW / WILDFLOWER SEEDED AREA OPEN SPACE \ i (1) NORTHERN RED OAK \ / \ � \ � \ � ,� \ (3) SWEET FERN (5) NORTHERN BAYBERRY (1) OAKLEAF HYDRANGEA LOT___ (5) VIBURNUM \ III J � - O (1) INKBERRY HOLLY (4) WINTERBERRY \ ; \ — — � 6 rn 62 (1) FRAGRANT SUMAC (23) LOWBUSH BLUEBERRY (1) AMERICAN HOLLY (3) WILD HYDRANGEA r I (1) FLOWERING DOGWOOD (3) OAKLEAF HYDRANGEA 58 (3) VIBURNUM \ (3) NORTHERN BAYBERRY (3) INKBERRY HOLLY o � - 3171/ CP L° QC(1) SERVICEBERRY O (1) COMMON WITCH HAZEL \ • �- � - . , � (2) SERVICEBERRY (3) SWEET FERN 000 (1) NORTHERN RED OAK (3) WILD HYDRANGEA I O \1 2 \ / (1) RED MAPLE 3 (1) INKBERRY HOLLY 60 / (1) FRAGRANT SUMAC I I J \ g I 58 ' (1) OAKLEAF HYDRANGEA �2 \ \ � � � ` � \ (3) OAKLEAF HYDRANGEA (5) FRAGRANT SUMAC \ �`, / � I � \ / (1) AMERICAN HOLLY (3) WINTERBERRY V \ \ �6, (1) COMMON WITCH HAZEL (9) NORTHERN BAYBERRY LO \ 5 (5) NORTHERN BAYBERRY (1) RED MAPLE "' \ 0 t (1) WINTERBERRY (7) VIBURNUMLt �T N S) MEADOW / WILDFLOWER %% �P SEEDED AREA tk Ln41v \\ N I O SERVICEBERRY �l IINKBERRY HOLLY „x NORTHERN BAYBERRY I I (4) WINTERBERRY MEADOW / WILDFLOWER SEEDED AREA LOT 4 (5) VIBURNUM VW/ 6 MEADOW / WILDFLOWER \ \ \ LO SEEDED AREA 1 _ C, — ,7 1 I KUU I rLAKL Z>HALL bt LAf LK NO BARK MULCH WITHIN 4" OFTREE TRL EXCAVATE SUBSOIL AS REQUIREDTO PL ROOTBALL AT PROPER ELEVATION. PLACE ROOTE DIRECTLY ON SUBS EXCAVATE HOLE TO A DIAMETER 3X THE WIDTH OF ROOTBALL. BACKFILL HOLE WITH ONE PART EACF TOPSOIL, PEAT AND PARENT MATEF 3" BARK MULCH WITH RIDGE AS SHO) UNDISTURBED SUBGR, TREE PLANTING DETAIL: NOT TO SCALE TALL TREE PLUMB " BLACK REINFORCED 3BER HOSE GALVANIZED WIRE GUYS AND mUCKLES. GUYS TO BE REMOVED ER ONE YEAR. MEYOR'S FLAGGING (WHITE) 2" x 2" x T CEDAR STAKES C9 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA LANDSCAPE PLAN LOT 2 - ROUTE 6A - YARMOUTH-PORT, MA \\D\ J. M® OTEILLY& AsSOCIATES, INC. °ago Professional Engineering & Land Surveying Services 1573 Main Street — Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 10/19/2022 As Noted RFR JMO JMO-8807 #2936C EQUAL EQUAL EQUAL 0 40 80 120 SCALE 1" = 40' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg