HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR11 (11-4-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT
PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 11 PAGE 1 OF 2
PROJECT NO: Z486.01 DATE: 11/04/22
LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC
WEATHER: Sunny, 55-68 ºF CONTRACTOR(S): DellbrookǀJKS; C.C.
Construction, Inc.
1. Mackenzie Meschwitz arrived on site at 0700 hours.
Left site at 1500 hours.
2. Earthwork equipment:
A) One Caterpillar PC 360 LCi Excavator B) One Volvo L120H Loader
3. Earthwork observed:
A) Excavation operations within the proposed northerly ramp area along the westerly side of the building took place today (see Site Sketch, Figure No. 1 and Photo Log). C.C. Construction
excavated two 10± feet wide, 3± to 5± feet deep trenches for the proposed ramp wall foundations
from about Elevations 38± to 33± feet. The excavations appeared to generally extend through existing fill down to apparent natural sand.
The existing fill appeared to generally consist of grayish tan, fine to medium SAND, some fine to coarse Gravel, trace Silt with asphalt and concrete debris. The natural sand appeared to generally
consist of light tan, fine to medium SAND, trace fine Gravel, and trace Silt. The observed subgrades appeared to be free of debris and organic material.
The undersigned was informed that proof compaction of the sand subgrade exposed along the bottom of the excavations is planned to take place on the following workday.
4. Attachments: Photo Log
Figure No. 1 – Site Sketch
ONSITE: TRAVEL: REPORT:
TOTAL:
8.00 hours 0.50 hour
1.00 hour 9.50 hours
Mackenzie Meschwitz
FIELD REPRESENTATIVE
Mark Zambernardi, P.E. REVIEWER
Tel: 508-598-3510
NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT
PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 11 PAGE 2 OF 2
PROJECT NO: Z486.01 DATE: 11/04/22
5. Distribution:
Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC
Rick Fenuccio – ClearPath Advisors, LLC
Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors
Mike Schmidt – DellbrookǀJKS
David Fernandes - DellbrookǀJKS
Marina Denisova - DellbrookǀJKS
Scott Mitchell - DellbrookǀJKS
Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner
NORTHEAST GEOTECHNICAL, INC.
Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 11 Page 1 of 1
Photograph #1
Description of Photograph:
Excavation of trenches in proposed
northerly ramp area.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated
11/04/22
Photograph #2
Description of Photograph:
Trench excavation in proposed
northerly ramp area.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated
11/04/22