Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR13 (11-8-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 13 PAGE 1 OF 3 PROJECT NO: Z486.01 DATE: 11/08/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Sunny, 45-52 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One Caterpillar PC 360 LCi Excavator B) One Bomag 50/55D Reversible Vibratory Plate Compactor C) One Volvo L120H Loader 3. Earthwork observed: A) Drainage utility installation and backfilling operations took place today within the proposed pavement area located within the westerly portion of the site (see attached Site Sketch, Figure No. 1 and Photo Log). The water quality unit and connecting HDPE pipe had been installed the previous work day (see Field Report No. 12 for additional information). During today’s operations, C.C. Construction placed previously excavated on-site sand as backfill around the water quality unit and around/above the HDPE pipe in approximately 12± inch thick lifts up to approximately about Elevation 38± feet. The fill appeared to be generally representative of sample no. FS-1, and appeared to generally consist of light tan, fine to medium SAND, trace Silt, trace (-) fine Gravel, and trace (-) Roots. The lifts were compacted with about 6 passes of the reversible vibratory plate compactor. Each lift of backfill appeared firm and stable under the vibratory action of the plate compactor. The undersigned performed Field Density Test (FDT) nos. 72 through 82 on the compacted lifts of backfill (see attached Figure No. 1 for the approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet on page 3 of this report for additional information. ONSITE: TRAVEL: REPORT: TOTAL: 8.00 hours 0.50 hour 1.00 hour 9.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 13 PAGE 2 OF 3 PROJECT NO: Z486.01 DATE: 11/08/22 4. Attachments: Photo Log Figure No. 1 – Site Sketch 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 13 PAGE 3 OF 3 PROJECT NO: Z486.01 DATE: 11/08/22 FIELD DENSITY TEST NO. APPROX. ELEV. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) IN PLACE MOISTURE CONTENT (%) COMPACTION (%) REMARKS 72 34± 113.7 9.5 108.1 2.4 95.1 1,2,3 73 35± 113.7 9.5 108.6 3.1 95.5 1,2,3 74 36± 113.7 9.5 108.4 3.1 95.3 1,2,3 75 37± 113.7 9.5 108.4 3.4 95.4 1,2,3 76 38± 113.7 9.5 108.9 3.5 95.8 1,2,3 77 38± 113.7 9.5 108.6 3.1 95.5 1,2,3 78 36± 113.7 9.5 108.5 3.3 95.4 1,2,3 79 36± 113.7 9.5 108.3 3.4 95.2 1,2,3 80 37± 113.7 9.5 109.4 2.8 96.3 1,2,3 81 38± 113.7 9.5 108.3 3.4 95.3 1,2,3 82 38± 113.7 9.5 108.5 3.9 95.4 1,2,3 REMARKS: 1. Satisfactory compaction percentage achieved at test location. 2. Tested fill material generally representative of sample no. FS-1. 3. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. Mackenzie Meschwitz FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 13 Page 1 of 1 Photograph #1 Description of Photograph: Continued backfilling around water quality unit in 12± inch-thick lifts of previously excavated on-site sand. Photograph Taken By: Mackenzie Meschwitz, dated 11/08/2022 Photograph #2 Description of Photograph: Compacting lifts of previously excavated on-site sand used as utility trench backfill above HDPE drainage pipe. Compacting with vibratory plate compactor. Photograph Taken By: Mackenzie Meschwitz, dated 11/08/2022