HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR14 (11-9-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 14 PAGE 1 OF 3 PROJECT NO: Z486.01 DATE: 11/09/2022 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Sunny, 45-52 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One Volvo L120H Loader B) One CASE SV216 Single Drum Vibratory Roller C) One Caterpillar D6N Bulldozer 3. Earthwork observed: A) Grading and proof compaction of the proposed pavement area subgrades within the westerly and southwesterly areas of the site occurred today (see attached Figure No. 1, Site Sketch and Photo Log). The subgrades appeared to consist of natural sandy soil in cut areas of the site, or previously placed fill consisting of on-site sand. The sandy subgrades appeared to generally consist of tan to reddish-tan, fine to medium SAND, trace Silt, and trace fine Gravel, and appeared generally representative of sample no. FS-1. C.C. Construction graded the sandy subgrades to an approximate Elevation of 38± feet, and then compacted the subgrades with about 8 passes of the vibratory single drum roller. The subgrades appeared firm and stable. The undersigned performed Field Density Test (FDT) nos. 83 through 92 on the compacted sandy subgrades (see attached Figure No. 1 Site Sketch for approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet on page 3 of this report for additional information. 4. Attachments: Photo Log Figure No. 1 – Site Sketch ONSITE: TRAVEL: REPORT: TOTAL: 8.00 hours 0.50 hour 1.00 hour 9.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 14 PAGE 2 OF 3 PROJECT NO: Z486.01 DATE: 11/09/22 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 14 PAGE 3 OF 3 PROJECT NO: Z486.01 DATE: 11/09/22 FIELD DENSITY TEST NO. APPROX. ELEV. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) IN PLACE MOISTURE CONTENT (%) COMPACTION (%) REMARKS 83 38± 113.7 9.5 112.9 6.6 99.3 1,2,3 84 38± 113.7 9.5 114.4 7.4 100+ 1,2,3 85 38± 113.7 9.5 113.4 6.7 99.7 1,2,3 86 38± 113.7 9.5 113.3 7.2 99.7 1,2,3 87 38± 113.7 9.5 111.5 7.4 98.1 1,2,3 88 38± 113.7 9.5 113.4 6.2 99.7 1,2,3 89 38± 113.7 9.5 113.4 6.7 99.7 1,2,3 90 38± 113.7 9.5 114.6 5.7 100+ 1,2,3 91 38± 113.7 9.5 113.2 6.5 99.6 1,2,3 92 38± 113.7 9.5 114.4 6.2 100+ 1,2,3 REMARKS: 1. Satisfactory compaction percentage achieved at test location. 2. Tested subgrade material generally representative of sample no. FS-1. 3. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. Mackenzie Meschwitz FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 14 Page 1 of 1 Photograph #1 Description of Photograph: Grading exposed sand subgrade in proposed pavement area. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 11/09/2022 Photograph #2 Description of Photograph: Proof-compacting sand subgrade in proposed pavement area. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 11/09/2022