Loading...
HomeMy WebLinkAboutplanSOIL TEST PIT DATA FILL EL 8.0 28' B LOAMY SAND 10YR 6/8 EL. 6.8 40 C MEDIUM SAND 2.5Y 8/3 NO GW OBSERVED D I S T K" I BUT 10 NOT TO SCALE REMOVABLE COVER LEGEND UNSUITABLE MATERIALS (TO BE REMOVED) PERCOLATION TEST RANGE ESTIMATED SEASONAL HIGH GROUNDWATER OBSERVED GROUNDWATER _mfflJ i ,ADJUSTMENT TP-2 DEPTH TO OBSERVED WATER 8.7 INDEX WELL MIW-29 WATER LEVEL RANGE ZONE A, DEPTH 0 INDEX WELL ON 6-22-22 11-62 WATER LEVEL ADJUSTMENT 1.7 DEPTH TO ADJUSTED WATER 7.0 DATE: JULY 6, 2022 TEST BY: BSC GROUP, INC. WITNESSED BY: JAY GARDINER LICENSED SOIL EVALUATOR: TODD MACDONALD PERCOLATION RATE. < 2 MINS./INCH SOIL CLASS- CLASS 1 L.T , A.R.: 0.74 GPD/S.F. HDPE RISER - w 4- WALLS - [- 5' 2e ---I T(6) F 00 24" ),I 5- DIA. KNOCKOUTS 1 130 TYP* �4 3m BOTTOM ON LEVEL STABLE BASE 6" MINIMUM PLAN 3/4- TO 1-1/2- MEW SECTION MEW CRUSHED STONE NOTES 1. PROVIDE INLET TEE OR, BAFFLE WHERE SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR IN PUMPED SYSTEM. 2. FIRST TWO. FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL, 3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 4. PILL ALL UNUSED KNOCKOUTS WITH MORTAR. 5. CONCRETE COVER SHALL BE RAISED TO WITHIN 6 INCHES OF FINISHED GRADE. OBSERVATION PORT (SEE DETAIL) 5' OVERDIG - lultiolal 3/4- TO 1-1/2- m 4- PERF. PVC W/SCREW CAP TO WITHIN 3 INCHES OF FINISHED GRADE EXTEND DOWN TO NATURAL SUBGRADE CAP THE END OF EACH LATERAL (TYP.) 2- MIN. OF 1/8" TO 1/2" DOUBLE WASHED STORE OR GEOTEXTILE 1.5' 4' 4' 4! 1.5' V 51 CROSS-SECTION (AT END OF LATERALS 5* OVERDIG L INSPECTION PORT LEACHING FIELD (15' X 30') TOP OF FIELD=9.45 l(IN)=8.95 l(END)=8.80 600-GALLON CONCRETE DRYWELL INV. IN=8.88 NOT TO SCALE blg-TES 1. SEPTIC TANK SHALL BE STEEL REINFORCED CONCRETE. 2. SEPTIC TANK SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING. 3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 4. TEES SHALL BE SCH. 40 PVC AND SHALL BE LOCATED WITHIN 12" OF TANK WALL AND ACCESSIBLE FROM TANK COVER. 5. FILL ALL UNUSED KNOCKOUTS WITH HYDRAULIC CEMENT. BENCHMARK SET ON SPIKE IN PAVEMENT ELEV = 10. 74' NAVD 88 DA TUM BA YBEI? 40'-- wID ROAD ,F RAISE INLET AND OUTLET COVERS TO WITHIN 6' OF FINISHED GRADE THE RISER SHALL BE 18' HDPE 6" MAX. f- CONC. COVER ..... ..... v io,* 7- MIN. 4'-6" ILOCATE LIQUID DEPTH TEE UNDER. OUTLET TEEj COVER W/GAS BAFFLE 3' 6* MINIMUM 3/4" TO CROSS-SECTION VI CRUSHED STONE 600-GALLON CONCRETE DRYWE-LL ILAI tkl_� ae ME CURRENT OWNER:,JOHN WJACOBSON OVERLAY DISTRICT: NONE TITITROGEN TITLE EFERENCE. R L.C.LC. CERT. 158028 SENSITIVE AREA: NOT IN A ZONE It FEMA FLOOD ZONE DISTRICT. "AE-EL11 & X-, DATED 7/16/2014 PLAN REFERENCE: L.C. PLAN #11435-A PANEL #25001C0588J ASSESSORS MAP-. 22 MINIMUM LOT SIZE: 25,000 S.F. PARCEL; 227 EXISTING LOT SIZE: .8,786± S.F. ZONING DISTRICT. R-25 EXISII14G BUILDING COVERAGE: 0 S.F. SETBACKS. FRONT 30, SIDE* 6' PROPOSED BUILDING COVERAGE: 2,182± S.F. REAR 20' 24.8% PER YARMOUTH BUILDING COMMISSIONER GENERAL NOTES- 1.1 THIS PLAN IS INTENDED fOR THE PERMITTING AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITIES AND ASSOCIATED SITE WORK. I ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO 310 CMR 15.000 AND YARMOUTH BOARD OF HEALTH REGULATIONS. 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY. 4. IF AN OVERDIG IS SPECIFIED, REMOVE ALL TOPSOIL, SUBSOIL AND OTHER UNSUITABLE MATERIALS. 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL. EXCAVATED MATERIALS WITHIN THE OMIT OF EXCAVATION WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL. SHALL NOT BE USED. FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES. A SIEVE ANALYSIS USING A #4 SIEVE SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT MAY BE RETAINED ON THE #4 SIEVE- - SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 100% MUST PASS #4 SIEVE 10% MUST PASS #50 SIEVE 0-20% MUST PASS #100 SIEVE 0-5% MUST PASS #200 SIEVE 5. EXISTING UTILITIES WHERE SHOWN ON THE PLANS ARE APPROXIMATE. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL SUBSURFACE. STRUCTURES ARE SHOWN. CONTRACTOR SHALL VERIFY THE SIZE, LOCATION AND ELEVATION OF INVERTS OF UTILITIES AND STRUCTURES, "THIN THE OMIT OF WORK, PRIOR TO THE START OF CONSTRUCTION. IF ANY DISCREPANCIES ARE DISCOVERED OR FIELD CHANGES REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY COORDINATING THE PROPOSED CONSTRUCTION ACTIVITIES WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANIES, AND SHALL COMPLETE THE PROPOSED WORK WITHOUT ANY INTERRUPTIONS IN SERVICE. 7. CONTRACTOR IS REQUIRED TO NOTIFY DIG -SAFE, PER MASS. STATUTE CHAPTER 82, SECTION 40 (1-888-344-7233) A MINIMUM OF 72 HOURS PRIOR TO THE START- OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. INSTALLATION OR USE OF A GARBAGE GRINDER AT THIS PROPERTY IS NOT ALLOWED PER 310 CMR 15,240(4). ME NOT TO SCALE SEPTIC TANK NOTE, MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED IN THE TRENCH OVER ALL PVC PIPING 3 BEDROOMS 0 110 GPD/BEDROOM = 330 GPD REQUIRED SEPTIC TANK 330 GPD X 200% = 660 GALLONS USE 1,500 GALLON SEPTIC TANK SIZE OF REQUIRED LEACHING FACILITY DESIGN PERC. RATE. <2 MIN/INCH LONG TERM APPL, RATE: 0.74 GPD/SF 330 GPD v. 0.74 GPD/SF = 446 SF SIZE OF LEACHING FACILITY PROVIDED USE A 15' X 30' LEACHING FIELD EFFECTIVE LEACHING AREA: 15' X 30' = 450 S.F. 450 S.F. X 0.74 GPD/S.F. = 333 GPD, (INSTALLED CAPACITY) 333 GPD > 330 GPD (3 GPD RESERVE CAPACITY PROVIDED) 4" SCH. 40 PVC L=2± FT. S=0.025 FIRST PIPE LENGTH TO BE /-SET LEVEL FOR 2' (MIN.) FINISH GRADE EL. 11.2-11.4 1 JOBS. PORT tLEVEL BOTTOM 5.0' SEPARATION IAL HIGH GROUNDWATER