Loading...
HomeMy WebLinkAboutdraft mitigation plan rvsd 11.28.22S58 *J5'55 "W 125.09 ' I; �� I �S \ jt / ( jA / I \ a ` �❑ / u / /6 I � Ib / Cn - / 1 � \ ' 3/3/18 36"NSPR �� . • .^ O i � I � W Wei W W V I I � n I \ I 1 I / ) I •22"NSP ;;CHY 10"NMP 3/3/18 I 18"NMPLE c � ��OA� s- -s z PAVED DRIVE DWELLING #40 CROSBY STREET EXT. 1991201a x x l REINFORC HOSE(11� DOUBLE #1 GUYS AND GEN. I I GUYS TO AFTER ONE I I I I A/C 5'- DWELLING TOP FOUNDATION EL. 14.5 3 / 0:Q �� � 00 / 12"NMPLE=4z / 1 _ 1 n4� / 24"NMPLE / y o, � / P 0\4- LOT��' 33,324 S.F.t 0.77 AC. t �24"NMPLE EXISTING LAWN TO REMAIN � - — z � • •' 2, 590E SF OF r 5, 484-ESF \ MITIGA TION \ (REMOVE LAWN) A. 1,913E SF OF . S, 484tSF I • • �' MIAGA T/ON �..� •.� I I REMOVE LAWN) oe 0 -0 ` / 1 0J0 2 • � sir` _ ��/ �/ / I �� / . 0� � �,' I � ///yam/ ////% � � .• / � 10 CH 1 �i \' 0 0 rk D B L.OA K PA� h o'`- �^ °�� gA / / ` ` GGP/ ` PROPOSED E RIcAN BEACH GRASSON BANK ?� \ OF (981fSF OF 5, 484-&SF) 7 1 \ ` REMOVE LAWN AND i / TOPSOIL, PLANT IS SAND. EXISTING i / ` AREA ALREADY 1 v� FLAGPOLE MI TIGA TED UNDER THIS OOC / \ AE 12) VE (EL 1 2" FINELY SHREDDED 111 r SOIL MIX BARK MULCH UNLESS NOTED OTHERWISE- FOR WATERING CREATE TROUGH FOR SUPPORT TAMP SOIL AROUND - �a ::r�'e®/ � ®"a' nv v a�ij:,vrp�`,vl`�p•��r% �\V+r'�_e�/.�, !�� �` a,' } y� •�e� � ; �`�Zi��>�'7 t �'��`cc' `,�%.`���:., _ �ibYi:> ,'i �,::e<.`:es.+y'�%Li;��.'!.ia%;9�i�'L�i1:3' SOY%;• \�"vc ��e® eO„i�l,._ ;�.� ,��, S ®ei--,;';.,., .:q`„��•.�j�;../� •. �,i��s!.�::_�ixa�s� 9w::ar.2::;i`•ss�,f�•.:bs3:.r%!` ��®��e'i� e,�o � a � ��®�i�si��i��p�����ja1� (t Y 4�f �i Si: �j �i y �1��� ;1•i� �� '�,.��j ��y®�/0,� ��%vY���p�%`�ii0l�w!i;�//e!,/ �J % yA`�!:���4���I�;,ii��i���!!i��!ilO� • �� 'o. %� ��. ,Gi;�� ���/���,iiS,�!ii����i��e�!l2Q:iisQi��� jvys�.ii,�'',�il,,��,�i,��!�.`yi��!?i�'p�!ii,�'p�lj��!ijvii���! �� �� r��:� • ' • • NSTALL TREE PLUMB FOP OF ROOTBALL SHALL BEAR TAME RELATIONSHIP TO FINISHED 3RADE AS TO PREVIOUS EXISTING 3RADE ROOT FLARE SHALL BE EXPOSED; AULCH SHOULD NOT BE WITHIN I-" OF TREE TRUNK 'LACE BALL ON SUBSOIL. REMOVE AND )ISCARD BURLAP EXCEPT UNDER BALL. REMOVE ALL SYNTHETIC SOIL WRAPPING AATERIALS (TREATED BURLAP, NYLON FWINE, WIRE BASKETS, ETC.) AND DISCARD XCAVATE SUBSOIL AS REQUIRED FO PLACE ROOTBALL TO PROPER LEVATION. PLACE ROOTBALL )IRECTLY ON SUBSOIL XCAVATE HOLE TO DIAMETER iX WIDER THAN ROOTBALL. 3ACKFILL HOLE WITH PLANTING 301L MIX AS SPECIFIED 3" BARK MULCH, AS SPECIFIED JNDISTURBED SUBGRADE ?" x 2" x 3' HARDWOOD STAKES. 3 TREE HEIGHT. DECIDUOUS TREE PLANTING FOR 2" CAL. AND ABOVE NOT TO SCALE MITIGATION: REQUIRED MITIGATION PER DOWN CAPE ENGINEERING INC. SITE PLAN DATED 9/7/17 = 5,362 SF PROPOSED MITIGATION - 5,484f SF APPROXIMATELY 4,500 SF OF LAWN WILL BE REMOVED 4,503E SF OF WOODY NATIVE SHRUBS 981E AMERICAN BEACH GRASS MITIGATION PLANTING SCHEDULE SYMBOL PLANT NAME SIZE QUANT. AMERICAN BEACH GRASS 3CULMS AMMOPHILA BREVLIGULATA @18"0.C. 1,500 BEARBERRY #1 34 ARCTOSTAPHYLOS UVA-URSI SWEET FERN 2.5-3' O. C. #1 84 COUP TONIA PEREGRINA CREEPING JUNIPER 3'--5' O.C. #2 37 ✓UNIPERUS HORIZONTALIS INKBERRY 4-5' O.C. #5 6 ILEX GLABRA NORTHERN BAYBERRY 04' O.C. #3 31 MYRICA PENSYL VANICA HIGHBUSH BLUEBERRY #3 9 VACCINIUM CORYMBOSUM 14 QUERCUS BICOLOR 3.5"-4" 6 SWAMP WHITE OAK EXISTING TREE PREVIOUSLY EXISTING TREE DESTROYED BY STORM REMOVED PREVIOUSLY EXISTING TREE TREE RESTORATION. TREE REMOVAL IN BUFFER AND/OR RIPARIAN ZONES: SPECIES & SIZE REASON FOR REMOVAL DATE NORWAY SPRUCE 36" BLOWN OVER IN STORM 3/3/18 NORWAY MAPLE 10" POLE REPLACEMENT 3/3/18 CHOKE CHERRY 8" BLOWN OVER IN STORM 3/3/18 CHOKE CHERRY 10" TORNADO STORM 7/23/19 CHOKE CHERRY 6" TORNADO STORM 7/23/19 * NORWAY MAPLE 12" CONSTRUCTION 2018 * NORWAY MAPLE 24" CONSTRUCTION 2018 ** CHOKE CHERRY 10" UNKNOWN UKNWN ** CHOKE CHERRY 10" UNKNOWN UKNWN * INVASIVE SPECIES CUT DOWN WITHIN THE WORK LIMIT ** COMPENSATORY TREES ARE PROPOSED FOR THESE (20") PROPOSED RESTORA T/ON TREES IN BUFFER/RIPARIAN ZONES. (6) 3.5"--4" CAL. RED OAK - QUERCUS RUBRA (22.5") RESTORATION PLANTING NOTES 1) ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN STANDARD FOR NURSERY STOCK BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION OR THE PLANT MATERIAL WILL BE UNACCEPTABLE. ALL PLANT MATERIAL SHALL BE TRUE TO SPECIES, VARIETY, SIZE AND BE CERTIFIED DISEASE AND INSECT FREE. THE OWNER AND/OR THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO APPROVE ALL PLANT MATERIAL ON SITE PRIOR TO INSTALLATION. 2) PROVIDE PLANTING PITS AS INDICATED ON PLANTING DETAILS. BACKFILL PLANTING PITS WITH ONE PART EACH OF TOPSOIL, PEAT MOSS AND PARENT MATERIAL. IF WET SOIL CONDITIONS EXIST THEN PLANTING PITS SHALL BE EXCAVATED AN ADDITIONAL 12" AND FILLED WITH SAND. 3) NEWLY INSTALLED PLANT MATERIAL SHALL BE WATERED AT THE TIME OF INSTALLATION. REGULAR WATERING SHALL BE PROVIDED TO ENSURE THE ESTABLISHMENT, GROWTH AND SURVIVAL OF ALL PLANTS. 4) LAWN SHALL BE REMOVED TO CREATE PLANTING BEDS FOR THE RESTORATION PLANTINGS. 5) ALL PLANTING BEDS SHALL RECEIVE 2" OF SHREDDED PINE BARK AT THE TIME OF PLANTING. 6) A TEMPORARY ABOVE GROUND IRRIGATION MAY BE USED IN FIRST TWO YEARS. 7) RESTORATION PLANTINGS SHALL BE ALLOWED TO GROW NATURALLY UNLESS AN ACTIVE CONSERVATION PERMIT ALLOWS OTHERWISE. MITIGATION PLAN LUKE RESIDENCE #40 CROSBY STREET EXT. SOUTH YARMOUTH, MA DATE: NOVEMBER 9, 2022 REV: NOVEMBER 28, 2022 Scale: 1 "= 10 0 5 10 15 20 25 FEET AN DREW R. GARU LAY, RLA:pa4� D E S I G N G R O U P LANDSCAPE ARCHITECTURE 85 STARBUCK LANE PHONE: 508-362-8174 YARMOUTH PORT, MA A@YPORTDESIGN.COM L 1