Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH , 6 SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ` Lot /02 Zone of Contribution: In_ Out Le Acreage Commercia • Residential: Street: 8� ki 4?6, / ye Village: /Pelt Floor Plan: #Bedrooms: Owner: 4.d y1 Installer: '4' 'J'`'�� �' -) Ad Address: Phone: 77 - 97 Phone: Builder: Engineer: 2> f (& Eeptal- Address: 7 Phone: -36 22•--- -S4/ Phone: ��'�tC ' Gild�' L. ''/* N/A YES NO 1. Required#of copies received - t,,/ 2. Date of soils exam and percolation test not older than 2 years 1� 3. 4-5 ft of naturally occurring pervious material, above water table f 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: t./ 5. Water line 10 ft from septic components Var.: �f 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: Cy7;S 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i . )/ 9. Leaching minimum 100 ft from wetlands Var.: - ' ' c,/ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well /Var.: c� 11. Tank/leaching minimum 10 ft from property line Var.: c _ 12. System meets all other setback requirements Var.: V 13. Uses adjustment for maximum high groundwater Var.: t./ 14. Leaching set 4-5 ft above adj. water or botto -of test hole Var.: t< 15. System not in top or subsoil(A,B horizons) r 5' removal- ' i/ 16.Proposed contours are suitable ;/ 17. System meets slope requirements-min. 1/8", ' "preferred t . 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee ../ 20. Sewage is under 10,000 gpd for parcel f _ 21.No garbage disposal - 22. System adequately sized for its intended use t.-/ 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade L� 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size ,..--"# 28. Septic tank/pump chamber to be factory waterproofed t.------- 29. Vent provided if leaching below 3 feet, under driveway/parking :---' 30. Buoyancy calculations for tank/pump chamber `r 31. Engineer to inspect and certify soils: wall: commercial: �---" 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �'` 33. H-20 loading is subject to vehicular traffic, groundwater E/ 34.Title V Application and permit fee, installer signature ✓- 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd_ L- 37. Check area lots for groundwater/Label groundwater in Assessor's Map ---- - Plan reviewed by: 6/03/03