HomeMy WebLinkAboutReview Checklist • TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot 7 7 Zone of Contribution: In Out Acreage
Commercial: Residential: ( _
Street:
Village: . C �
Of) 1
Floor P1 . #Bedrooms:
Owner: 7 Installer: (G��J��
Address: Phone: c2 6& V FP- - S . -
Phone:
Builder: Engineer: /) S7lAndi
Address: Phone: S-7r - S` - 9.
Phone: /
N/A YES NO
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years L
3. 4-5 ft of naturally occurring pervious material, above water table 1_
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: -
5:Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7..Septic tank minimum 10 ft from foundation, deck Var.: i--
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,./
9. Leaching minimum 100 ft from wetlands Var.: � -
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: `_-----
11. Tank/leaching minimum 10 ft from property line Var.: l/
12. System meets all other setback requirements Var.: k,_.---
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: �-----
15. System not in top or subsoil(A,B horizons) or 5' removal N-
16.Proposed contours are suitable �--
17. System meets slope requirements-min. 1/8", '/4"preferred L_.---
18. System meets breakout requirements PVC liner: Wall: ,____
19. Specified tee sizes are proper, gas baffle on outlet tee ....____-
20. Sewage is under 10,000 gpd for parcel L_--
21.No garbage disposal - ------
22. System adequately sized for its intended use �._-----4
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade, pump chamber cover to grade C
r)
25. Inspection port on plastic chambers/leach field l�
26. Electrical permit for pump chamber/Separate meter for duplexes �---,-
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size __sue
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: /J
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �----"
33. H-20 loading is subject to vehicular traffic, groundwater _ _---r
34. Title V Application and permit fee, installer signature _---'
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd -
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03