Loading...
HomeMy WebLinkAboutEngineer PlanPROPOSED SEPTIC TANK/1 PUMP CHAMBER EXISTING CESSPOOL 0BE REMOVED (SEE NOTE 11) 99\76 FLOOD ZONE DESIGNATIO MAP NUMBER: 25001C05089J EFFECTIVE DATE: JULY l§. 2016 * � 4— ' x101,35 ���� N�� �`� / ��� 8`556±S,F. 101,23 / PK SET lO016 ��3� 10O�55 1000 HOLLY LANE x 100.98 EXISTING SPOT GRADE 101 — —EXISTING CONTOUR PROPOSED CONTOUR EXISTING WATER SERVICE �jfj� OVERHEAD WIRES v 0 TEST PIT Ige BENCHMARK LEGEND PROPOSED S.A,S. W/3 DISTRIBUTION LINES EXISTING SHED REMOVE & RELOCATE BENCHMARK � BULKHEAD CORNER PROPOSED SEWER CONNECTION INV.=100.1±(FIELD VERIFY) 100.74 GENERAL NOTES: /.ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. a' ALL WORK AND MATERIALS TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL C0DE, TITLE v. AND ANY APPLICABLE LOCAL RULES AND RECULAr}ONS, except as requested below: —310 CMR 15.405(1)(b)&(h); CONTENTS OF LOCAL UPGRADE APPROVAL 1) A 5' variance, G.A.S. to bulkhead corno,, for o 15' setback, 2) A 1' reduction to the required ovpo,ohvn between adjusted high groundwater and bottom or S.A.S.. for 4of separation. 3, THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKF|LLED PRIOR TO INSPECTION AND APPROVAL By THE BOARD OF HEALTH AND THE DESIGN ENG|NEER, 4, ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT Rc3pows|BLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO wOT|pr THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS ouR|wG CONSTRUCTION, 7. WATER SUPPLY PROVIDED B, TOWN WATER SUPPLY. & THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM. e. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED upDN BY OWNER AND CONTRACTOR OR AS OTHERWISE 0RECTED BY THE APPROVING AUTHORITIES. 10, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL UNDERGROUND VT|UT|E3, PRIOR TO BEGINNING C0NSTRuCT|VN, 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S,A.S. AND REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STR|POUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY DESIGN ENGINEER PRIOR To BACKF|LL. 13. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED EXISTING SEPTIC SYSTEM C0wP0wEmTo NOT SHOWN ON THE PLAN, 14. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND IS NOT To BE CONSIDERED A PROPERTY LINE SURVEY. 15, AN ELECTRICAL PERMIT SMALL BE OBTAINED PRIOR TO CONSTRUCTION. �\\\�27 HOLLY LANE, SOUTH YARMOUTH, MA OALNER OF RECORD MACOWBER. PAUUNE (LIFE EST 40 SOUTH MAIN ST, APT 213 ATTLEBOR0' MA 02703 MAP 8D~334-1 53 ( Prepared for: Quinn's Excovation, P.O. Box 599, Forestdole, MA 02649 eq' Engineering Works, Inc. 12 West Crossfield Rood ,"="tdole, °" 02644 "=,ey~= 2854 Cranberry Hwy. | E'~a,«nvm. »m 02538 SCALE DRAWN JOB. NO. | D~'^ � CHECKED | SHEET NO. NOTE: TO PREVENT BREAKOUT, INSTALL A 40 MIL POLY LINER AS SHOWN ON SHEET 1. TOP OF LINER, EL.=103.2 BOTT. OF LINER, EL.=100.7 PROPOSED SEPTIC LANK/PUMP CHAMBER PROVIDE RISERS WITH FRAMES & COVERS OVER PROPOSED D-BOX EACH ACCESS MANHOLE AND SET TO FINISH GRADE. INSTALL WATERTIGHT RISER &ROPOSED PROPOSED S.A.S.S S.A.S. MANHOLES BROUGHT TO GRADE SHALL BE SECURED COVER SET TO 6" OF GRADE 18' x 25' LEACH FIELD TO PREVENT UNAUTHORIZED ACCESS. INSTALL INSPECTION PORT OUTSIDE DRIVEWAY FOOTPRINT W13 DISTRIBUTION LINES F.G. EL.=104t OVER FIELD F.G. EL.=104.0t T.O.F.-102.03t F.G. EL.=101.7t F.G. EL.=102.3+ PROVIDE ENOUGH WIRE MAINTAIN 2% GRADE MIN.) OVER S,A.S, EXISTING SLACK TO REMOVE PUMP 4" DIAM. INSPECTION PORT„ L=$ (MAX) 1$' x 25' IEACW{NG FiEID W/3-4" PERFORATED IN S.A.S.. SOLID f 6 L =18, �" SC14 �40 C� 5=1% (MIN.) TOP EL.-100.84 PROVIDE THRUST I CKS *"scr)9 (mic) 595 4Q PERRF. PVC DISTRIB.U[ LINES ABOVE S.A.S., WITH SCREW CA ET TO WITHIN 3_,OF GRAD _ _ ...._ "� ���••�•,••� - 4°5CH4OPVC AT AIL B _ CAPPED ENDS �hp�y T-�'--` 6" EFF.PEP7H 1N TF 'S ARE TO 6E ADJ. GW E .=IO2.97 INV. EL.=1O2.60(END) INV.=102.$0 I - SLOPE OF PERF, PIPE 0.5% r 4 CW 40 PVc 98.1 PROPOSED D-�809 25' EFFECTIVE LENGTH STDG. GW L. 3 OUTLETS (MIN.) INVERT c27 �r�. " . ..... ` 95.6----- SOIL ABSORPTION SYSTEM (PRO ; shed shr. BN =99.75 aOT7. EL.-95:17 INV.=99. INV.=10:?3 EX. SEWER (3) ' `' CONNECT TO EXISTING INV.=99.50 lNL! = 100.2 s SEWER PIPE EFFLUENT FILTER SHALL BE INSTALLED ON OUTLET INV. 100.1 TEE AS MANUFACTURED BY ZABEL OR EQUAL. FILTER ESTABLISH VEGETATIVE COVER nII % % / % / C„1. L / ? n I � EXISTING'100 SHALL BE INSPECTED AND CLEANED ANNUALLY OR AS REQUIRED TO PREVENT SEWAGE BACK. UP T'HOUSE. AS DIRECTED BY THE SANDWICH CONSERVATION COMMISSION ���� '°f 10U E(#927) fIl (See Pump Detail, Sheet 3 of 3) FINISH GRADE EL.=104.0t APPROVED FILTER FABRIC ROOMO /� T, =11�2.C73f n 150OZ50Q GALLON SEPTIC TANKIPUMP CHAMBE CELLAR FL.=96.7±' ( H--10 TANK NOTES: BREAKOUT ELEV.=103.1 - a 1) SEPTIC TANK/PUMP CHAMBER & D-BOX SHALL BE SET LEVEL & TRUE TO GRADE ON A MECHANICALLY COMPACTED BOTTOM ELEV.=102.10 STABLE BASE OR SIX INCH CRUSHED STONE BASE AS 4' VIN. SEPARATION TO G.W. , 5 5 3' SPECIFIED IN 310 CMR 15.221(2). (WITH VARIANCE) A 2) INSTALL INLET & OUTLET TEES AS REQUIRED. OCCURRING D 4' Or NATURALLY _ PERVIOUS SOILS 16' EFFECTIVE WIDTH 3J4af2'SDBLE' 3) MAX. COVER OVER TANK, D-BOX & S.A.S. SHALL BE 36". ESI. HIGH G.W. EL: 98.1 A1EDD TONE S.A.S. LAYOUT 4) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS SOIL ABSORPTION SYSTEM (.5 TC IONS PRIOR TO CONSTRUCTION. SEPTIC SYSTEM PROFILE SOIL LOG Index Well Readings (feet befow surface) DATE: OCTOBER 20, 2022 DESIGN CRITERIA SOIL EVALUATOR: PETER McENTEE SE#1542 zoas zozo"' zoaa WITNESS: JAY GARDINER HEALTH AGENT J-ay rab.s:7 iv+_rah np,t: Wy m : y A.01.a ucr NUMBER OF BEDROOMS: 2 ELEV. T P DEPTH 2022 SOIL TEXTURAL CLASS: CLASS 1 101 1 O" A !Ina Ni nra. Reading ZuneA Zane& ToneC 2oneD 2anaE - Well 8a,prtabte23i AIW 1 zr.s 97 23 3A 4.5 LOAMY SAND Eems ab;e 247 AIW2479 27.1 s 3.2 8.9 &7 „- ffi8s ^*tze: e47 .. DESIGN PERCOLATION RATE. <2 MIN MIN/IN � ! 1OYR 3, 1 100.4 g" t a_eu n 48 8HW148 ri4tbo re& b m eresterzl anaw2rw 1-1z.3 19 49 gerev ^CX 21 B � � r, 1. DAILY FLOW: 330 GPD Chathem'38 CGW738R 28.8 3.1 47 63 7.8 �Ln n a8 m LOAMY SAND Mashpee 29 WMW `2, 9A 25 817 4,9 6.7 m Ots mnaL `m ,•~`. DESIGN FLOW: 330 GPD 10YR 5/6 � PERC Sar.Gwieh 253 SDW258R 49.1 3.6 5A 72 4A ana ,.i2 rm90 7SW89 r. 11.9 1.7 z6 3a 3a 4 dN,tn �3 GARBAGE GRINDER: NO '� 27' ' iVelipeet i7 WVtNJ17R ^-'.+ 13.t 2.6 3.4 S.1,,,„,,„,;,,.,„„.,.,....,.�,,.„,,,.�y -�„- *-"we so - LEACHING AREA REQUIRED: (330 GPD) - 445.9 SF `�8 5 31" C .74 GPD/SF Month PROPOSED SEPTIC TANK/PUMP CHAMBER: 1500/500 GAL CAPACITY MED. SAND 2.5Y 6/4 PROPOSED SEPTIC SYSTEM UPGRADE PLAN PROPOSED D-BOX: 1 INLET, 3 OUTLET (MIN.), H-10 27 HOLLY LANE, SOUTH YARMOUTH, MA ADJ. GW 48" INSTALL A $° x 25' LEACH FIELD 95.6 STG. GW { 66" S)DEWALL AREA. NOT APPLICABLE 1 re Prepared for: Quinn's Excavation, P.O. Box 599, Forestdale, MA 02649 P BOTTOM AREA: 18' x 25' = 450 S,F, 94.1 84" Engineers: Surveyors; SCALE DRAWN JOB. NO. -- F PERC RATE <2 MIN/IN. "B" HORIZON Engineering Works, Inc. iL" Engineering, Inc, N.T.S. P.T.M. 328-22 TOTAL AREA: :....................................450S. STANDING GW, EL.=95.5 12 West Crossfield Rood 2854 Cranberry Hwy.. INDEX WELL MIW-29, WATER L EVEL=9.4 (OCT 2022) Forestdole, MA 02644 E.Warehom, MA 02538 DATE CHECKED SHEET NO. LEACHING CAPACITY = 0.74 GPD/SF x 450 SF = 333.0 GPD ZONE A ADJUSTMENT=2.5', ADJ. GW, EL.=98.0 (508) 477-5313 (508) 273-0377 11/14/22 P.T.M. 2 of 3 PROVIDE WATERTIGHT RISER, & SECURED COVER SET TO HOISTING CABLE 709 STAINLESS STEEL 1/8" DIAMETER. / 1,760 LB. STRENGTH PROVIDE G�4 WIRE SUNCK TO REMOVE PUMP INV.(IN)=99.50 ALARM ON EL: 97.17 PUMP ON EL: 96.67 BOTTOM OF PUMP OFF EL: 96.17 20" 1" 4 PUMP CHAMBER ELEV.= 95.17 PROVIDE 2— WIDE ANGLE FLO—ATS- FLOAT NO.l: PUMP ON/OFF—SJ RHOMBUS (PROVIDED FLOAT NO.2: ALARM ACTIVATION FLOAT —PROVIDED WI (ON SEPARATE CIRCUIT FROM PUMP CAPE COD WINWA NOTE: APE 20" DIA (TYP.) 12'-2" ii ii 1 A � j A _0Ii10 CI II I PLAN VIEW 4" KNOCKOUTS (TYP.) NEMA 4 JUNCTION BOX CORROSION RESISTANT LAME & LIQUID —TIGHT CABLE CONNECTORS SUPPORTED kDE BY 1-1/4" PVC CONDUIT. JOINTS TO BE MADE JAME WATERTIGHT. USE SJE RHOMBUS—JB PLUGGER DE OR EQUAL PROVIDE rNOUGH WIRE S0,CK TO REMOVE PUMP INSTAL 1' PVC CONDUIT TO HOUSE FOR WRING WITH WATERTIGHT JOINTS. WIRE HIGH WATER ALARM FLOAT TO SJE RHOMBUS TANK ALERT XT ALARM PANEL ON CIRCUIT SEPARATE FROM CIRCUIT TO THE PUMP, 2" BALL VALVE (FIELD ADJUST FOR 20 GPM RATE) (INSTALL QUICK DISCONNECT FOR EASY REMOVAL) 2"SCH. 40 DISCHARGE (THROUGH RISER —SEE PROFILE) 2" 90- ELBOW W/ 1/4" WEEP HOLE FOR SELF —DRAINING FORCE MAIN 2" SWING CHECK VALVE ----2" SCH. 40 PVC DISCHARGE PIPE ADDITIONAL 3/16" VENT HOLE (MIN.) ABOVE PUMP FLANGE (TO PREVENT PREMATURE PUMP BURNOUT) TH PUMP) LIBERTY LE40 SERIES PUMP .4 H.P, 115 V ALARM PANEL. WITH 2" DISCHARGE, OR EQUAL IECIFIED) AND ACCESSORIES AVAILABLE AT: R WORKS CO., HYANNIS. MA. (508) 862-0166 VED ALTERNATE MAY BE SUBSTITUTED. 5 4" 20" DIA. COVERS I /— (TYP.) F I 8 F4 " OUTLET LE'f OU KNOCKOUTS3" SUPPORT LIQUID (SEE NOTE 3) xBEAMS COMPARTMENT (TYP) LEVEL ALL AVAII OL 4­% CROSS SECTION A -A WT of H-10- 18,852 LBS. 1.) CONCRETE 4,000 PSI AFTER 28 DAYS. 2,) CONSTRUCTION CONFORMS TO DEP TITLE V REGS, 310 CMR SECT()N 15.226. 3.) TONGUE & GRCOVE JOINT SEALED W/ BUTYL RESIN & WRAPPED 4.) REINFORCEMENPER ASTM C1227-93. 5.) ALSO AVAILABLE IN H-20 LOADING. 6.) PROVIDE POLY ER WATERPROOF COATING MGC4N PRECAST CORP., BOURNE MA, (800) 564-6774 4" SUN ROOM shed � shr.1 113H KIT./DIN. IBATH (BEDROOM LIV. RM. FIT1199MMI FOR SCHEMATIC PURPOSES ONLY BUOYANCY !OALQULATIQN H-10 SEPTIC TANK-ZPUMP CHAMBER BOTTOM OF UNIT EL.= 95.17 HIGH GROUNDWATER EL.=98.1 BUOYANCY FORCE PER FOOT OF DEPTH: 12.2' x 6.7' x l' x 62.4 lbs./cu.ft. = 5100.6 fbs. MAX. DISPLACEMENT = 98,1' — 95.17' = 2.93' MAX, UPLIFT PRESSURE = 2,93' x 5100,6 ibs/ft = 14,944,7 lbs. WEIGHT OF UNIT EMPTY = 18,852 lbs. 18,852 LBS, > 14,945 LBS. O.K. DOSING .& STORAGE REQUIREMENTS DESIGN FLOW: 330 GPD DOSING REQUIRED: 4 CYCLES/DAY (RECOMMENDED) 330 4 = 82.5 GALLONS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS! 82,5 GAL/CYCLE --2- 125 GAL/FT = 0.66 FT/CYCLE (USE 6") STORAGE REQUIRED ABOVE WORKING LEVEL: 330 GALLONS STORAGE PROVIDED: INV,(IN) EL: 99.50 PUMP ON EL: 96.67 = 2.831 STORAGE PROVIDED = 2.83' x 125 GAL/FT = 353.8 GALLONS PROPOSED SEPTIC SYSTEM UPGRADE PLAN 27 HOLLY LANE, SOUTH YARMOUTH, MA Prepared for: Quinn's Excavation, P.O. Box 599, Forestdale, MA 02649 Engineers: Engineering Works, Inc. 12 West Crossfield Road Forestdole, MA 02644 (508) 477-5313 Surveyors- JC Engineering, Inc. 2854 Cronberry Hwy. E.Warehom, MA 02538 (508) 273-0377 SCALE N.T.S. DRAWN P.T.M. JOB. NO. 328-22 DATE 11/14/22 CHECKED P.T.M. SHEET NO. 3 of 3