Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR20 (11-28-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 20 PAGE 1 OF 3 PROJECT NO: Z486.01 DATE: 11/28/22 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Overcast, 38-43 ºF CONTRACTOR(S): DellbrookǀJKS; C.C. Construction, Inc. 1. Mackenzie Meschwitz arrived on site at 0700 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One Volvo L120H Loader B) One Bomag 50/55D Reversible Vibratory Plate Compactor C) One Caterpillar 335F Excavator D) One Dynapac CA1300D Single Drum Vibratory Roller 3. Earthwork observed: A) Backfilling between the northerly ramp foundation walls along the exterior of the westerly building wall continued today (see attached Figure No. 1, Site Sketch and Photo Log). C.C. Construction placed two, 12± inch thick lifts of previously excavated sand in the northerly ramp area from approximately Elevations 40± to 42± feet. The sand used as backfill appeared to be generally representative of sample no. FS-1 and generally consisted of tan, fine to medium SAND, trace Silt, and trace fine Gravel. Each lift of backfill was compacted with about six passes of the vibratory drum roller, followed by about five passes of the reversible vibratory plate compactor in the corners and along the walls. The lifts of backfill appeared firm and stable under the vibratory action of the compactors. The undersigned performed field density test (FDT) nos. 137 through 142 on the compacted lifts of backfill (see attached Figure No. 1, Site Sketch for approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet on page 3 of this report for additional information. B) C.C. Construction began subgrade preparations within the proposed concrete dock apron area today by grading and proof compacting the exposed sand subgrade (see attached Figure No. 1, Site Sketch and Photo Log). The exposed sandy subgrade appeared to be generally representative of sample no. FS-1 and was observed to be similar in gradation as the sand backfill described in Item 3A. C.C. Construction proof-rolled the sandy subgrade with about five passes of the vibratory drum roller. The subgrade appeared firm and stable under the vibratory action of the roller. ONSITE: TRAVEL: REPORT: TOTAL: 8.00 hours 1.50 hours 1.00 hour 10.50 hours Mackenzie Meschwitz FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 20 PAGE 2 OF 3 PROJECT NO: Z486.01 DATE: 11/28/22 The undersigned then performed FDT nos. 143 through 147 on the compacted sand subgrade (see attached Figure No. 1, Site Sketch for approximate test locations). The test results indicated that a satisfactory compaction percentage was achieved at each test location. Refer to the Summary of Field Density Tests sheet on page 3 of this report for additional information. Delbrooks|JKS’ site superintendent confirmed that a minimum thickness of 12 inches of base course sand and gravel fill is planned to be placed within the proposed dock apron slab area. 4. Attachments: Photo Log Figure No. 1 – Site Sketch 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 20 PAGE 3 OF 3 PROJECT NO: Z486.01 DATE: 11/28/22 FIELD DENSITY TEST NO. APPROX. ELEV. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) IN PLACE MOISTURE CONTENT (%) COMPACTION (%) REMARKS 137 41± 113.7 9.5 112.9 5.7 99.3 1,2,3 138 41± 113.7 9.5 113.3 4.9 99.7 1,2,3 139 41± 113.7 9.5 112.2 5.9 98.7 1,2,3 140 42± 113.7 9.5 112.0 4.9 98.5 1,2,3 141 42± 113.7 9.5 113.1 4.5 99.5 1,2,3 142 42± 113.7 9.5 113.4 4.8 99.7 1,2,3 143 37± 113.7 9.5 114.6 4.6 100+ 1,2,3 144 37± 113.7 9.5 114.1 5.8 100+ 1,2,3 145 37± 113.7 9.5 114.6 5.8 100+ 1,2,3 146 37± 113.7 9.5 115.1 5.1 100+ 1,2,3 147 37± 113.7 9.5 114.4 5.0 100+ 1,2,3 REMARKS: 1. Satisfactory compaction percentage achieved at test location. 2. Tested soil generally representative of sample no. FS-1. 3. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. Mackenzie Meschwitz FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 20 Page 1 of 2 Photograph #1 Description of Photograph: Placing 12± inch thick lifts of backfill between northerly ramp foundation walls. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 11/28/22 Photograph #2 Description of Photograph: Compacting lifts of backfill placed between northerly ramp foundation walls. (Item 3A) Photograph Taken By: Mackenzie Meschwitz, dated 11/28/22 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 20 Page 2 of 2 Photograph #3 Description of Photograph: Grading loading dock apron area subgrade. (Item 3B) Photograph Taken By: Mackenzie Meschwitz, dated 11/28/22 Photograph #4 Description of Photograph: Proof compacting sandy subgrade in loading dock apron area. (Item 3B) Photograph Taken By: Mackenzie Meschwitz, dated 11/28/22