Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 1 7 Lot / l Zone of Contribution: In Out Acreage ���T 1 n Commercial: Residential: // Street: Village: Floor Plan: It -' #Bedrooms: Owner: /cG v: N I3,-/c 0 rr... Installer: AC.)h.,,., Inc-r-' 1 vV Address: Phone: Phone: Builder: Engineer: /4/vl bv. a . 9/ WI C r� liN Address: Phone: Phone: N/A YES NO 1. Required#of copies received ..---- 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table „r/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: i 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel l 21.No garbage disposal o/ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox C..--. 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field " 26. Electrical permit for pump chamber/Separate meter for duplexes ,,, 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size / -- 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking ./ -- 30.Buoyancy calculations for tank/pump chamber t. 31. Engineer to inspect and certify soils: wall: commercial: " 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature Zf 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature _/^ - 35. Foundation footing min.2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ._. co:o: