HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 1 7 Lot / l Zone of Contribution: In Out Acreage
���T 1 n Commercial: Residential: //
Street:
Village: Floor Plan: It -' #Bedrooms:
Owner: /cG v: N I3,-/c 0 rr... Installer: AC.)h.,,., Inc-r-' 1 vV
Address: Phone:
Phone:
Builder: Engineer: /4/vl bv. a . 9/ WI C r� liN
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received ..----
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table „r/
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
i 12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.`
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel l
21.No garbage disposal o/
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox C..--.
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field "
26. Electrical permit for pump chamber/Separate meter for duplexes ,,,
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size / --
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking ./ --
30.Buoyancy calculations for tank/pump chamber t.
31. Engineer to inspect and certify soils: wall: commercial: "
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature Zf
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature _/^ -
35. Foundation footing min.2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: ._.
co:o: