Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. S 2 Lot ��1:7 Zone of Contribution: In_ Out ' Acreage /� e G Commercial: Residential: 1.---- Street: /8 0 jam' r r-c.! < , 51 Village: Floor Plan: V # Bedrooms: Owner: Installer: R. (DU /' Address: Phone: Phone: Builder: Address: Engineer: .-ft.,�! Neer / ,t, 1/ - Phone: Phone: N/A YES NO 1. Required#of copies received ,.*/ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: v/ 6. Benchmark indicated and shown-NGVD if near wetlands C./ 7. Septic tank minimum 10 ft from foundation, deck Var.: L 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: I I 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5' removal I 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred / 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal / 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade / 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes t/' 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size L---- 28. Septic tank/pump chamber to be factory waterproofed 1.--- 29. Vent provided if leaching below 3 feet,under driveway/parking L/ 30.Buoyancy calculations for tank/pump chamber l✓ 31. Engineer to inspect and certify soils: wall: commercial:, 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature _/ 33.H-20 loading is subject to vehicular traffic,groundwater / 34.Title V Application and permit fee,installer signature 35. Foundation footing min.2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map l Plan reviewed by e- _ 600,