Loading...
HomeMy WebLinkAboutpresentation 12.15.22Riverwalk Park Event Space Conservation Commission Meeting December 15, 2022 Project Background •Vacant 22-acre parcel acquired by the Town in 1986 for Recreation •Site considered for a Marina until deemed not financially viable in 2014 •DISUC Committee formed in 2015 to explore alternative uses –looked to creating a destination location with water access to energize Rte 28 •Detailed Feasibility/Concept Design Study in 2017-2018 for a Riverwalk Park,Boardwalk and area for periodic special events •Robust public engagement to date included project modifications: ➢Park: improved traffic/pedestrian safety; security and crime prevention and safety of kayak usage ➢Boardwalk: Looped boardwalk rather extending to Seagull Beach ➢Event Space: Sound study and reoriented temporary stage towards Rte 28 •Town/DISUC working with Consultant BETA to finalize the design and permitting Project Permitting •Two NOIs to keep Project Moving •Multiple protected natural resources on the property •Drive-In Property already partially developed/ disturbed •Key permitting programs: o Massachusetts Environmental Protection Act (MEPA) Environmental Notification Form (ENF) with Cape Cod Commission DRI. o Wetlands Protection Act and Town of Yarmouth Wetlands Bylaw & Yarmouth Stormwater Management Bylaw. o Chapter 91 Waterways License and Army Corp of Engineers Programmatic General Permit. o Massachusetts Department of Transportation (MassDOT) Highway Access Permit (curb cut). o National Pollutant Discharge Elimination System (NPDES) Construction Stormwater General Permit (for erosion control). o Local zoning, septic and building permits. o MESA, DMF, MHC Reviews Complete. Yarmouth Riverwalk Park –Community Context SITE Swan Pond Town Hall Higgins Crowell Rd. Main St. BSU Cape Cod High School Existing Conditions and Site Resource Areas Existing Conditions and Site Resource Areas Existing Conditions and Site Resource Areas Site Photos Site Photos Site Photos Site Photos Site Photos Site Photos Site Photos Supplemental Investigations Supplemental Investigations Supplemental Investigations Site Photos Site Photos Riverwalk Park -Overall Site Plan Detailed Site Plan Floor Plan Restroom Facilities –Site Plan & Floor Plan North Elevation (facing Route 28) East Elevation (facing the River) South Elevation (facing the Event Space) Restroom Facilities -Elevations Playscapes -Site Grading and Landforms Natural Play Area –Site Plan Event Space Operations Layout -Enlargement **SAY Grading and Drainage **SAY Impacts –Riverfront Area **SAY Impacts –Riverfront Area **SAY Impacts –Salt Marsh, BVW, Coastal Beach, LUO **SAY Impacts –LSCSF Questions?