HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR28 (12-9-22)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT
PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 28 PAGE 1 OF 1
PROJECT NO: Z486.01 DATE: 12/09/22
LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC
WEATHER: Overcast, 36-47 ºF CONTRACTOR(S): DellbrookǀJKS; C.C.
Construction, Inc.
1. Mackenzie Meschwitz arrived on site at 0730 hours.
Left site at 0930 hours.
2. Earthwork equipment:
A) One Caterpillar Tracked Mini Excavator
3. Earthwork observed:
A) C.C. Construction began the installation of trench drains adjacent to the proposed concrete ramp and
dock apron areas (see attached Site Sketch, Figure No. 1 and Photo Log). C.C. Construction excavated 2± ft. wide by 2± ft. deep trenches along the noted areas. The excavations terminated at about Elevation
37± ft. The excavations were advanced through about 2± inches of existing bituminous pavement and
into sandy soil appearing to generally consist of tan to reddish tan, fine to medium SAND, trace to little Silt, trace Roots, and trace fine Gravel.
4. Attachments: Photo Log
Figure No. 1 – Site Sketch
5. Distribution:
Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC
Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors
Kate Wollman – Catalyst Architecture & Interiors
Mike Schmidt – DellbrookǀJKS
David Fernandes - DellbrookǀJKS
Marina Denisova - DellbrookǀJKS
Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner
Tim Sears – Town of Yarmouth Deputy Building Commissioner
ONSITE: TRAVEL: REPORT:
TOTAL:
2.00 hours 1.50 hours
0.50 hour 4.00 hours
Mackenzie Meschwitz
FIELD REPRESENTATIVE
Mark Zambernardi, P.E. REVIEWER
Tel: 508-598-3510
NORTHEAST GEOTECHNICAL, INC.
Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 28 Page 1 of 1
Photograph #1
Description of Photograph:
Excavation of trench along
proposed concrete dock apron area.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated
12/09/22
Photograph #2
Description of Photograph:
Excavated trench for trench drain
installation.
(Item 3A)
Photograph Taken By:
Mackenzie Meschwitz, dated