HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 7 Lot e Zone of Contribution: In Out Acreage
Commercial: Residential: /-
Street: L/8 O pr, r- e S
Village: Floor Plan: . # Bedrooms: j
Owner: Installer:
Address: Phone:
Phone:
Builder: Engineer: c�
, � S,-,,,L..)
Address:
Phone:
Phone:
N/A YES NO
1. Required#of copies received ,✓'
2. Date of soils exam and percolation test not older than 2 years
ir
3. 4-5 ft of naturally occurring pervious material, above water table ,/ _ -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: I ✓ -
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: L
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: is
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V-
11.Tank/leaching minimum 10 ft from property line Var.:
`
12. System meets all other s quirements Var.: `
arc re 1'
13. Uses adjustment for maximum high groundwater Var.: /'
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal t�
16.Proposed contours are suitable ,/
17. System meets slope requirements-min. 1/8", %"preferred E -
18. System meets breakout requirements PVC liner: Wall: 4/
19. Specified tee sizes are proper, gas baffle on outlet tee ¢/
20. Sewage is under 10,000 gpd for parcel v
21.No garbage disposal /
22. System adequately sized for its intended use �,
23.Minimum 6"stone or compacted below tank and dbox /
24. Manhole covers within 6"of grade, pump chamber cover to grade ,--- "
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size ,
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
•
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t�
33. H-20 loading is subject to vehicular traffic,groundwater
34.TitIe V Application and permit fee, installer signature
35. Foundation footing min.2 feet above adjusted ground water for new house /
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map /
Plan reviewed by: _ o:o:
/X- /1- ' :1--