Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 7 Lot e Zone of Contribution: In Out Acreage Commercial: Residential: /- Street: L/8 O pr, r- e S Village: Floor Plan: . # Bedrooms: j Owner: Installer: Address: Phone: Phone: Builder: Engineer: c� , � S,-,,,L..) Address: Phone: Phone: N/A YES NO 1. Required#of copies received ,✓' 2. Date of soils exam and percolation test not older than 2 years ir 3. 4-5 ft of naturally occurring pervious material, above water table ,/ _ - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: I ✓ - 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: L 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: is 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V- 11.Tank/leaching minimum 10 ft from property line Var.: ` 12. System meets all other s quirements Var.: ` arc re 1' 13. Uses adjustment for maximum high groundwater Var.: /' 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal t� 16.Proposed contours are suitable ,/ 17. System meets slope requirements-min. 1/8", %"preferred E - 18. System meets breakout requirements PVC liner: Wall: 4/ 19. Specified tee sizes are proper, gas baffle on outlet tee ¢/ 20. Sewage is under 10,000 gpd for parcel v 21.No garbage disposal / 22. System adequately sized for its intended use �, 23.Minimum 6"stone or compacted below tank and dbox / 24. Manhole covers within 6"of grade, pump chamber cover to grade ,--- " 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size , 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: • 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t� 33. H-20 loading is subject to vehicular traffic,groundwater 34.TitIe V Application and permit fee, installer signature 35. Foundation footing min.2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map / Plan reviewed by: _ o:o: /X- /1- ' :1--