Building Site Location: ;/10 , �Gt� S /i I/i/,¢y -�/I/, )j l7U
' ✓�/1 lIlA
Proposed Improvement: � S A �e }k -
c..t `� LAj/ 3 ►3 R yV\
rke
Applicant: �� J I d(,7r c Tel. No.: Sv't Z a t 3
Address: c. Cl . _ ,Y /lv A Date Filed: ( L-c - ZZ
**lf you would like e-mail notification of sign off please provide e-mail address./2L)/S Lj'c y/j(//!C e__#-S pi 61 l Co 1y
Owner Name: /7/4( Tr4etti /fyfS
Owner Address: /6 H Pit, �✓ S ` Owner Tel. No.:
We 51744/ MAk -
RESIDENTIAL AND/OR COMMERCIAL BUILDING
HEALTH DEPARTMENT: Determines Compliance to State and Town Regulations; i.e., Requirements
For Septage Disposal and other Public Health Activities.
Please submit three (3) copies of plans, to include:
(1.) Site Plan showing existing buildings, water line location,
DEC 0 1 2022 and septic system location;
(2.) Floor plan labeling ALL rooms within building
HEALTH DEPT. (all existing and proposed) -
Note: Floor plans not required for decks, sheds, windows, roofing;
(3.) If necessary, Title 5 application signed by licensed installer
with fee.
REVIEWED BY: 7_5 DATE: / 2 / - 02 -2
PLEASE NOTE
COMMENTS/CONDITIONS:
I
24.1
ID
-SEC
. ... ...... . .
7
WM- Q
Al
c of
k� - C). ,
L J, FcicgA �-C, &Tv
<
DEC 0 12022
HEALTH DIEPT
Map 29
Parcel 134
s.8)
I�Shel j(14.
q DB
L — _j
SAS , J�
X.,-x
I X
/X , ST
10 , 0 X X
NOote X
e
Raze #19/
Existin PrioRposed
Liner Prop.
Building I
Map 29
Parcel 138
.01
(14.2)
TP
2 �ootoe
I Remove
(14 '2) Deck I
Exist
:19 4/
(K2)
Deck
T8M EL = 15.4
TBM EL - 12.8 1 Proposed
1 3 Bedroom
T.O.F.
14
6'±
Top Nail
TOF El = 15.4
i9I W
Liza
Mop 29
Parcel 135 12—
Poved.el
14.24
Mop 29
D/W Lot 69
Parcel 137
5,400± SF
b
kmo)
N
S 48*30
113)
60,0
P vemen t
ele
(11.4)
Standish J
Way
(Public way)
Zone R-25
25,000 Sq. Ft.
150' Frontage
Locus
Setbacks
Front 30'
/00, 'S'
Side 15'
Rear 20'
colonial
Acres
Maximum Coverage 25%
Beach
Existing Coverage: 22.8±
Proposed Coverage: 21,0±
Lewis Bay
WEST YARMOUTH,\MA
V-
J,
V
a rr-, 8 1 1
Aissessbr s map 29 Parcel 1315
2-:'Y-Bk 21151 Pg 216
3.) PL BK 47 PG 113 Lot 69
4.) This property is not in a Wellhead
Protection District
5.) This property is in Flood Zone X
Firm Mop 25001CO569J Dated 7/16/14
OF
Variance Requested:
Variances: 310 CMR 15.221 (7) General Construction
NOTE: Requirements for All System Components:
LOCATION OF UTILITIES IS APPROXIMATE AND ALL 1.) Variance to the 20' setback between the edge of the SAS
UNDERGROUND AND OVERHEAD UTILITIES MUST BE and the Foundation. An 15.5' setback is provided,
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT An 4.5' Variance is requested, 310 CMR 15.405(1)(o)
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO, 2.) Variance to a Reserve Area sufficient to replace soil absorption system.
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES Variance requested for no Reserve Area. 310 CMR 15.248(1)
AND THE LOCAL WATER DEPARTMENT.
105 Slandsh Way UU, U I OtL
-,,7D7
West 'Yarmcu%, MA 7k1 rF
Proposed
Raze and Replace
Existing 3 Bedroom
Site and Septic Plan
Prepared for: Prepared by:
Matthew P. Hurley, TR All Cape Septic and Survey
18 Heather Rood 618 Route 28
West Yarmouth, MA 02673
Westford, MA (508) 771-4200
ollcopesepticOgmaill.com
OT/26/22 Sheet I of 1 1 By MA Check-, 1 Dwg #410
GRAPHIC SCALE
2.0 0 10 20 40
( IN FEET )
1 inch = 20 ft.
CONSTRUCTION NOTES
t.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE. TIRE 5 (310 CMR 15.000)_
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION. UPGRADE. AND
EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS,
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
1) To MINIMIZE UNEVEN SETTLING. SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK; THE D15T M71ON BOX, AND
THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING 13.3
FIELDS. TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED Exist
VERTICALLY To THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP. TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN 1% OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT)LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTE.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED To
ASSURE EVEN DISTRIBUTION.
B.) GROUT TO BE USED.AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL,
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS O THE SEWAGE
DISPOSAL FIELD DURING THE COURSE of CONSTRUCTION OF THE SYSTEM.
10.) IN ACCORDANCE WITH 310 CMR 15.221. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE,
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 15W OF THE PROPOSED SOH. ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE. THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE O THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL. CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES. BUT IS NOT LIMITED T06 REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES. AND THE LOCAL. WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTEUNES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION O ANY
SEPTIC SYSTEM COMPONENTS,
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE. TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS, IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS To BE LOCATED. PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED, AREA TO DE COMPACTED TO MINIMIZE SETTLING,
INCLUDING THE SEPTIC TANK.
EXCAVATION NOTES
1) EXCAVATE ALL MATERIAL ABOVE SOIL HORIZON C (SEE DEEP OBSERVATION
HOLE LOG) WHERE POSSIBLE FOR A LATERAL DISTANCE OF 5'
IN ALL DIRECTIONS BEYOND THE OUTER PERIMETER OF THE LEACHING AREA.
2) FILL MATERIAL SHALL CONSIST OF CLEAN GRANULAR SAND, FREE FROM ORGANIC
MATTER AND OTHER DELETERIOUS SUBSTANCES, WHICH MEETS THE TEXTURAL
CRITERIA PUT FORTH IN SECTION 15.255(3) OF TITLE 5.
3) SCARIFY THE BOTTOM SURFACE OF THE EXCAVATION PRIOR TO PLACEMENT
OF FILL INTO THE RETAINING STRUCTURE.
4) PLACE FILL ONLY WHEN BOTTOM SURFACE IS DRY.
EL=15.0
a
1
RAISE MIN. 20" DIAMETER COVER RAISE- MIN. 20" DIAMETER COVER
TO WITHIN 6" OF FINISH GRADE TO WITHIN 6" OF FINISH GRADE
14.4t 14.7± EL=14.5t
,X\/
O
14.0 1
s 13.3t
M
1r
12.9
16't ---#
GEOTEXTILE
FABRIC
12.65 12.57 12.4 -
12.3 3/4" to
GAS BAFFLE 6" Crush ��_ (I_20 1 1/2" STOW
Stone {Double wash
--BOX TWO (2) 500 GALLON PRECAST
10.3 CONCRETE LEACH CHAMBERS WITH 4' OF.0
1,500 GALLON � 6>t `� � g,t ___4 STONE ON ENDS AND 4'. ON SIDES s
SEPTIC TANK
LEACH CHAMBERS
b
T r- e" T 1 1 elt 1 r- t
Test Hole 1 (EL=14.6t)
1 C J 1 EI ULE L V 100
Depth
Elev.
Layer
Soil Class
Soil Color
Other
0"-7"
13.3
A
Loamy Sand
I0YR3/2
7"-22"
12.2
B
Loamy Sand
10YR5/6
22"-104"
5.3
C
Med Fine
1OYR6/4
Sand
-rre-T / 1.-%7 r- s r�-%e-
Test Hole 2 (EL=14.Ot)
1 E D I r-1 V L E L V V J
Depth
Elev.
Layer
Sail Class
Soil Color
Other
0"-7"
13.3
A
Loamy Sand
10YR3/2
7"-22"
12.2
B
Loamy. Sand
1OYR5/6
22"-104"
5.3
C
Med Fine
IOYR6/4
Sand
DATE OF TESTING: 08/10/22
SOIL EVALUATOR: MARK POSELLI
WITNESS: JAY GARDINER YARMOUTH HEALTH AGENT
PERCOLATION RATE HOLE #1: LESS THAN < 2 MIN/INCH
NO GROUNDWATER ENCOUNTERED
NO MOTTLING ENCOUNTERED
FLOW PROFILE
NOT TO SCALE EL=5.3 Bottom Test Hole -
SYSTEM_ DESIGN_ CALCULATIONS
c
SEWAGE DESIGN FLOW: THREE BEDROOM DWELLING 0 110 GPD/SEDROOM = 330 GPD
(MINIMUM DESIGN REQUIRED 330 GPD)
SEWAGE DESIGN FLOW PROVIDED: TWO (2) 500 GALLON CHAMBERS
WITH 4' STONE ON THE ENDS AND 4' STONE ON THE SIDES
Vt = [(25.0 x 12,83) + 2(25.0 + 12.83) (2) x .74 = 349 GPD PROVIDED
349 GPD PROVIDED > 330 GPD REQUIRED
SEPTIC TANK CAPACITY REQUIRED: 330 GPD X 200 = 660 (MINIMUM)
SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
Proposed Septic Plan
105 Standish Way
West Yarmouth, MA
Prepared for:
Matthew P. Hurley, TR
18 Heather Road
Westford, MA
Prepared by:
All Cape Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcopeseptic®gmail.com
Date: 9/26/22
Sheet 2 of 2
Project No. AC-490-2