HomeMy WebLinkAboutCOC RequestEMAIL info'��crawfordlrn.corn
MAIL 88 Route 6A, Unit 2B 1 Sandwich, MA 02563
December 21, 2022
Ms. Brittany DiRienzo, Conservation Administrator
& Members of the Yarmouth Conservation Commission
Town of Yarmouth, Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
DEP File No: Order of Conditions SE 83-2169
Project Address: 64 Mill Lane
Approved Plans: 'Existing Conditions Plan of Lane' Dated 9/5/2018 by Down Cape Engineering
Crawford Land Management 'Restoration Plan' dated 9/28/2018
Dear Ms. DiRienzo and Conservation Commissioners,
Crawford Land Management (CLM) respectfully submits the following application to request a
Certificate of Compliance for the property at 64 Mill Lane, per the approved Order of Conditions SE
83-2169.
This project area is located across the street from the residence at 64 Mill Lane in Yarmouth, and is a
completely naturalized area between Mill Lane and Hallet's Mill Pond. The resource areas present
include salt marsh, bordering vegetated wetland, and coastal bank with associated 50' and 100' buffer
zones. The project area is also completely within a flood zone. CLM permitted this restoration to
manage various invasive species within the entire project area. Phragmites (Phragmites australis) were
treated per the Land Management Plan protocol. Maintenance has been performed every season and
the Restoration Planting was completed.
In summary, CLM considers the active management of this project to be complete and in substantial
compliance with CLM's Restoration protocols and the intent of the Commission. We request the
Commission grant on -going conditions so the areas may continue to be maintained if needed.
Respectfully,
Derek Sipma
Account Manager
Crawford Land Management
Cc: Emelyn Grize, Applicant
ECOLOGICAL RESTORATION I COASTAL STABILIZATION I CONSERVATION PERMITTING
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance 3 OLO
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
This request is being made by:
Name
(110
NZ
AM 026i&
_ _._ State Zip Code
Z'7 / -7
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to
Applicant
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in pa,6,/ a // zaf7e
an Order of Street Address City/Town
Conditions, the
property owner 7
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance jJi f%i%TL�i
from the issuing /ICJ/ 1 Z-/— if
authority stating Property Owner (if different) '
that the work or Barnstable JaIJ```�/ 70
portion of the
County Book Page
work has been
satisfactorily
completed. Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc -- rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
❑ Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
PA •
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town. html).
wpaform8a.doc -- rev. 5/29/14 Page 2 of 2