Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. �� Lot Zone of Contribution: In Out- Acreage a ', 3 3 / Commercial: Residential: Lam_ 1 Street: 7 /`y e L 9 e S ?t,v\1 ?lc( Village: Floor Plan: 1.----' #Bedrooms: 3 •Owner: Installer: D ( ( L(g 1 cd) Address: Phone: Phone: Builder: Engineer: f'�Ct,. L. -e- t Address: Phone: Phone: N/A YES N_O 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material,above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: L 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: t.7/ 12. System meets all other setback requirements Var.: • 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: �I 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable i 17. System meets slope requirements-min. 1/8", ''/<"preferred __18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel l ' 21.No garbage disposal I ' 22. System adequately sized for its intended use G ' 23.Minimum 6"stone or compacted below tank and dbox f1 24. Manhole covers within 6"of grade,pump chamber cover to grade .4.---- 25. Inspection port on plastic chambers/leach field a/ 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size // 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: ' . 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature l 35.Foundation footing min.2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max. flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed b ,1 wee � ,,1.-dr