HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. �� Lot Zone of Contribution: In Out- Acreage a ', 3 3
/ Commercial: Residential: Lam_
1 Street: 7 /`y e L 9 e S ?t,v\1 ?lc(
Village: Floor Plan: 1.----' #Bedrooms: 3
•Owner: Installer: D ( ( L(g 1 cd)
Address:
Phone:
Phone:
Builder: Engineer: f'�Ct,. L. -e- t
Address: Phone:
Phone:
N/A YES N_O
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material,above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
L
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: t.7/
12. System meets all other setback requirements Var.: •
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: �I
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposed contours are suitable i
17. System meets slope requirements-min. 1/8", ''/<"preferred
__18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel l '
21.No garbage disposal I '
22. System adequately sized for its intended use G '
23.Minimum 6"stone or compacted below tank and dbox f1
24. Manhole covers within 6"of grade,pump chamber cover to grade .4.----
25. Inspection port on plastic chambers/leach field a/
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size //
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: ' .
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature l
35.Foundation footing min.2 feet above adjusted ground water for new house /
36.Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed b ,1 wee � ,,1.-dr