HomeMy WebLinkAboutBLD-20-005278 COO TOWN OF YARMOUTH Building Department CERTIFICATE OF
(508) 398-2231 ext.1261 OCCUPANCY
PERMIT NO BLD-20-005278
ADDRESS: 193 Whites Path, South Yarmouth, Ma 02664 ZONING DISTRICT Bldg. Type: Commercial
SUBDIVISION MAP BLOCK LOT 098.77
REMARKS New construction 780 CMR MSBC 9th Edition, Y By aws-New
frame/fabric structure
�2 Z/ BUCAIL
// CERTIFITE OFDING INSPEOFFICIA ION
DATE:
Mid Cape Racquet Club
134 Blue Rock Road
Yarmouth, Ma 02664 PHONE
-IS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
ERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE
JRISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF
JBLIC WORKS.
CERTIFICATE OF OCCUPANCY
BUILDING INSPECTIONS APPROVALS
FIRE:
DATE: \\--%-3h\ Yti - OTHER
DATE:
ELECTRICAL BOARD OF HEALTH DATE: Z 6 ?A DATE: r /74 /
INSPECTOR: i INSPECTOR: -6 Cg "
PLUMBING/GAS FINAL BUILDING
DATE: 1 1.I ("1-/ DATE:
INSPECTOR: INSPECTOR:,✓ J�
COMMUNITY DEVELOPMENT: DATE NAME
Fallon,Rosa
From: Moriarty,Jason
Sent: Wednesday,December 8,2021 4:43 PM
To: Fallon,Rosa
Subject: 193 Whites path
Final inspection was completed for 193 Whites Path rear building.They are all set with fire department.
Jason Moriarty
Lieutenant/Inspector
Yarmouth Fire Department
96 Old Main Street
South Yarmouth MA, 02664
Tel: 508-760-4859 Ext. 3216
Fax: 508-760-4861
jmoriarty@yarmouth.ma.us
1
O
TO WH' 'S
EXISTING METAL BUILDING PATH `�'-
SLAB EL 47.55't �Lt
I
o"�
•Ll•A
rr S5$9;
25
7
. •. MAP 98 PCL 77
LOT AREA 169,870t SF ve
77 Nfl:
EXISTING FNDN.
.77
® iZ
LU I
W
;sffi • .
N
11.1 O 'o
0 ;Z �'�
w 1_ 0
w 0 1° •,,,-
L ' . Imp
FOUNDATION PLOT PLAN DCE #14-354
PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE
LOCATION : 193 WHITE'S PATH, SOUTH YARMOUTH, MA
SCALE : 1" = 60' DATE : 1 1-5-2021 PREPARED FOR:
REFERENCE : MAP 98 PARCEL 77 MID CAPE RAQUET
I HEREBY CERTIFY THAT THE STRUCTURE AND HEALTIFCLUB
SHOWN ON THIS PLAN IS LOCATED ON THE ANIEL
GROUND AS SHOWN HEREON. o. . t
off 508-362-4541 U cn
fox 508-362-9880 (\s_C:JAALLA)
dN409downcape.com 0 "---`down cape engineering,inc. Fs civil engineers 'y�SUPC'
11 land surveyors
939 Main Street (Rte 6A)
YARMoum1PORT MA 02675 DATE REG. LAND SURVEYOR
O
TO WH. 'S '
EXISTING METAL BUILDING PATH '3
SLAB EL. 47.55't oU'.
1
•
14 0
A� 326 y9
.7 �''
ems'
dam''
• •, MAP 98 PCL 77
LOT AREA 169,370t SF
EXISTING FNDN.
�� 7
\ ,\ .,-Ve�
ti
Z
c 0,1 e.,„\D 0
.0.
1. e ....,,,.....---
co \‘)s.t 0 ,.„,,,
—` - ---,,‘_ -1-
pEPP___ R --
0 . ' 1 1 ATION PLOT PLAN DCE #14-354
AY
PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE
LOCATION : 193 WHITE'S PATH, SOUTH YARMOUTH, MA
SCALE : 1" = 60' DATE : 11-5-2021 PREPARED FOR:
REFERENCE : MAP 98 PARCEL 77 MID CAPE ' .1 UET
I HEREBY CERTIFY THAT THE STRUCTURE AND HE ,e : .q` t B
SHOWN ON THIS PLAN IS LOCATED ON THE . �Q ` EL G, '
GROUND AS SHOWN HEREON. to A.
off 5D8-362-4541 c, A.
( •fco 508-362-9880 ,4 No.40980
Tdowncope.com O A
• down cape endineerind,inc. DIES .10 O
A ko
civil engineers sit
i land surveyors
i 939 Ma/n Street (Rte 6A)
YARMOUTNPORT MA 02675 DATE REG. LAND SURVEYOR
Project No:
Phase Construction Control Document P17_54
vilt ft To be submitted at completion of required site reviews of phase construction
!l K for work per the 9th edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2.2 RECEIVED
DEC 0 6 2021
Project Title: Mid-Cape Athletic Tennis Court Enclosure Date: 1 December 2021
—BUILDING DEPARTMENT
1 Property Address: 193 White's Path,South Yarmouth,MA 02664 Permit No. BLD-20-00527S'
I, T.Varnum Philbrook MA Registration Number: 30690 Expiration date: 30 JUN 2022
am a registered design professional and 1 or my designee have observed the following work,and to the best of my
knowledge,information,and belief the construction work indicated below has been performed in a manner consistent with
the approved plans and specifications:
Required Site Review and Documentation for Phase Construction'4
(to be performed by the appropriate registered design professional or his/her designee or M.G.L.c 112§81R contractor)
Site Review and Documentation R Site Review and Documentation R
Soil condition and analysis X+ Energy efficiency X
Footing and Foundation,including Reinforcement and X+ Fire Alarm Installation' X•
Foundation attachment
Concrete Floor and Under Floor X+ Fire Suppression Installation' X*
Lowest Floor Flood Elevation Field Reports'
Structural Frame—wall/floor/roof X Carbon Monoxide Detection System'
Lath and Plaster/Gypsum Seismic reinforcement
Fire Resistant Wall/Partitions framing Smoke Control Systems
Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents
Above Ceiling inspection Accessibility(521 CMR) X
Fire Blocking/Stopping System Other.
Emergency Lighting/Exit Signage—See Below X
Means of Egress Componenets X Special Inspections(Section 1704):
Roofing,coping/System X
Venting Systems(kitchen,chemical,fume) X
Mechanical Systems X
1.Indicate with an'x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below
2.Include NFPA 72 test and acceptance documentation
3.Include applicable NFPA 13, 13R, 13D, 14, 15,17,20,241,etc.-test and acceptance documentation
4.Include NFPA 720 Record of Completion and Inspection and Test Form
5.Include field reports and related documentation
6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce
this code with respect to examination of the contract documents,including plans.computations and specifications,and field inspections
Work Descriptions:
X+-Separate Foundation Affidavit filed 23 OCT 2020 X*-Separate Final Affidavits required by respective RDPs
Final finishes,equipment and devices installed. Emergency egress lighting tested to provide Code minimum of 1 Foot-
Candle(11 Lux)below devices and.1 Foot-Candle(1 Lux) along egressways and at mid-court nets. Horn/Strobe units
elevated to be visible from mid-court nets
a Describe in sufficient detail the work(i e.foundation steel reinforcing kitchen vent system,etc)and the location on the pout a 1' 'f applicable,the submittal documents that pertain to the work which was
inspected
�* OF l/gs2/c
Enter in the space to the right a"wet"or
ARNUM
electronic signature and seal: ',(PHlLuROOK'\'./'`'
{" MECHANICAL u'
No.30690G\ e
�0
ScFGrSTE��O��ttr
S e• - IZ `,30.--
Phone number: 508-385-8682(o)&508-364-1301 (c) Email: Tvarnphil@Verizon.Net
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 06_11_2013-mod 02_25_2018 tvp
Project No:
Final Construction Control Document p47
f/ To be submitted at completion of construction by a RECEIVED
Registered Design Professional
for work per the 9th edition of the DEC 0 6 2021
.''s4". -A V)
IMP
Massachusetts State BuildingCode, 780 CMR, Section 107.6.4 ��_
BUILDING DEPARTMENT
BY —
Project Title: Mid-Cape Athletic Tennis Court Enclosure Date: 1 December 2021
Property Address: Mid-Cape Athletic Club, 193 White's Path, South Yarmouth,MA 02664
Project: Check(x)one or both as applicable: XX New construction Existing Construction
Project description: Legacy Metal Framed/Fabric Skinned Mfg.Building on Concrete Foundation
I T.Varnum Philbrook MA Registration Number: 30690 Expiration date: 30 JUN 2022,
am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
Entire Project Architectural _XX+_ Structural XX*_ Mechanical
_+_ Fire Protection _XX* Electrical _XX_ Other:_Engineer-of-Record
+Mfg.Building& Fire Protection Design by other MA Licensed RDPs *supervise Licensed Professionals
for the above named project. I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or
electronic signature and seal: ... of--,
;;t,P(..._____)
ARNUM�i,
'oLBROOK `
I" HANICAL v.1
'.o .3069
,sTE �• 1 . VA(1-,40 -• cenur3i2enDv----
• UNAL
Phone number: 508-385-8682(o)&508-364-1301 (c) Emai : varnphil@Verizon.Net
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen,
provide a description.
Version 06_11_2013-mod 02 25_2018 tvp
RECEIVED
DEC 0 6 2021
BUILDING DEPARTMENT
—# Final Construction Control Document By:
/' To be submitted at completion of construction by a
•
Registered Design Professional
for work per the 9h edition of the
Massachusetts State Building Code. 780 CMR, Section 107.6.4
Project Title:Mid Cape Athletic Center, New Rear Building Date:11/16/21 Permit No.
Proper Address: 193 Whites Path,South Yarmouth.MA 02664
Project: Check(x)one or both as applicable:X New construction Existing Construction
Project description:New Fire Sprinkler System
I Anthony P Caputo P.E.MA Registration Nuinber.35218 Expiration date:6/30/22 ,am a registered design
pro/irsstonat and hereby certify that I have prepared or directly supervised the preparation of all design plans.
computations and specifications concerning'
Entire Project Architectural Structural Mechanical
X Fire Protection Electncal Other:
for the above named project. I certify that I.or my designee.have performed the necessary professional services.on
accordance with Professional Standard of Care.and was present at the construction site on a regular and periodic basis to
determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared
by me and approved as part of the building permit and that I or my designee
i. Have reviewed,for conformance to this code and the design.concept.shop drawings.samples and other submittals
by the contractor in accordance w ith the requirements of the construction documents.Such review shall not
relieve the Contractor of its submittal and other resposnibilines.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.The contractor is responsible for the performance of the work in
accordancewith the contract documents and shall be exclusively responsible for its construction means,methods.
sequences and procedures.and for constriction safety.
Enter in the space to the right a"wet or
-AO"oF,v�
electronicAVv-
signature and seal mac' minor(P eye
CI9Ei
�/ en 4-j /
,
-Pk Q/STEP
Phone number: Email: SSvAt.Ern 'y
!tinkling t rilicial Ike Only
Building Official Name: Permit No. Date: j
Note 1.Indicate with an'x project deign plan;.computations and iaiecitications thci you prcpu'ed or directhv sup.wised.If'other'is chosam.
provide a de eruption.
Trial Version 10 09 2012