Loading...
HomeMy WebLinkAboutBLD-20-005278 COO TOWN OF YARMOUTH Building Department CERTIFICATE OF (508) 398-2231 ext.1261 OCCUPANCY PERMIT NO BLD-20-005278 ADDRESS: 193 Whites Path, South Yarmouth, Ma 02664 ZONING DISTRICT Bldg. Type: Commercial SUBDIVISION MAP BLOCK LOT 098.77 REMARKS New construction 780 CMR MSBC 9th Edition, Y By aws-New frame/fabric structure �2 Z/ BUCAIL // CERTIFITE OFDING INSPEOFFICIA ION DATE: Mid Cape Racquet Club 134 Blue Rock Road Yarmouth, Ma 02664 PHONE -IS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR ERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JRISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF JBLIC WORKS. CERTIFICATE OF OCCUPANCY BUILDING INSPECTIONS APPROVALS FIRE: DATE: \\--%-3h\ Yti - OTHER DATE: ELECTRICAL BOARD OF HEALTH DATE: Z 6 ?A DATE: r /74 / INSPECTOR: i INSPECTOR: -6 Cg " PLUMBING/GAS FINAL BUILDING DATE: 1 1.I ("1-/ DATE: INSPECTOR: INSPECTOR:,✓ J� COMMUNITY DEVELOPMENT: DATE NAME Fallon,Rosa From: Moriarty,Jason Sent: Wednesday,December 8,2021 4:43 PM To: Fallon,Rosa Subject: 193 Whites path Final inspection was completed for 193 Whites Path rear building.They are all set with fire department. Jason Moriarty Lieutenant/Inspector Yarmouth Fire Department 96 Old Main Street South Yarmouth MA, 02664 Tel: 508-760-4859 Ext. 3216 Fax: 508-760-4861 jmoriarty@yarmouth.ma.us 1 O TO WH' 'S EXISTING METAL BUILDING PATH `�'- SLAB EL 47.55't �Lt I o"� •Ll•A rr S5$9; 25 7 . •. MAP 98 PCL 77 LOT AREA 169,870t SF ve 77 Nfl: EXISTING FNDN. .77 ® iZ LU I W ;sffi • . N 11.1 O 'o 0 ;Z �'� w 1_ 0 w 0 1° •,,,- L ' . Imp FOUNDATION PLOT PLAN DCE #14-354 PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE LOCATION : 193 WHITE'S PATH, SOUTH YARMOUTH, MA SCALE : 1" = 60' DATE : 1 1-5-2021 PREPARED FOR: REFERENCE : MAP 98 PARCEL 77 MID CAPE RAQUET I HEREBY CERTIFY THAT THE STRUCTURE AND HEALTIFCLUB SHOWN ON THIS PLAN IS LOCATED ON THE ANIEL GROUND AS SHOWN HEREON. o. . t off 508-362-4541 U cn fox 508-362-9880 (\s_C:JAALLA) dN409downcape.com 0 "---`down cape engineering,inc. Fs civil engineers 'y�SUPC' 11 land surveyors 939 Main Street (Rte 6A) YARMoum1PORT MA 02675 DATE REG. LAND SURVEYOR O TO WH. 'S ' EXISTING METAL BUILDING PATH '3 SLAB EL. 47.55't oU'. 1 • 14 0 A� 326 y9 .7 �'' ems' dam'' • •, MAP 98 PCL 77 LOT AREA 169,370t SF EXISTING FNDN. �� 7 \ ,\ .,-Ve� ti Z c 0,1 e.,„\D 0 .0. 1. e ....,,,.....--- co \‘)s.t 0 ,.„,,, —` - ---,,‘_ -1- pEPP___ R -- 0 . ' 1 1 ATION PLOT PLAN DCE #14-354 AY PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE LOCATION : 193 WHITE'S PATH, SOUTH YARMOUTH, MA SCALE : 1" = 60' DATE : 11-5-2021 PREPARED FOR: REFERENCE : MAP 98 PARCEL 77 MID CAPE ' .1 UET I HEREBY CERTIFY THAT THE STRUCTURE AND HE ,e : .q` t B SHOWN ON THIS PLAN IS LOCATED ON THE . �Q ` EL G, ' GROUND AS SHOWN HEREON. to A. off 5D8-362-4541 c, A. ( •fco 508-362-9880 ,4 No.40980 Tdowncope.com O A • down cape endineerind,inc. DIES .10 O A ko civil engineers sit i land surveyors i 939 Ma/n Street (Rte 6A) YARMOUTNPORT MA 02675 DATE REG. LAND SURVEYOR Project No: Phase Construction Control Document P17_54 vilt ft To be submitted at completion of required site reviews of phase construction !l K for work per the 9th edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2.2 RECEIVED DEC 0 6 2021 Project Title: Mid-Cape Athletic Tennis Court Enclosure Date: 1 December 2021 —BUILDING DEPARTMENT 1 Property Address: 193 White's Path,South Yarmouth,MA 02664 Permit No. BLD-20-00527S' I, T.Varnum Philbrook MA Registration Number: 30690 Expiration date: 30 JUN 2022 am a registered design professional and 1 or my designee have observed the following work,and to the best of my knowledge,information,and belief the construction work indicated below has been performed in a manner consistent with the approved plans and specifications: Required Site Review and Documentation for Phase Construction'4 (to be performed by the appropriate registered design professional or his/her designee or M.G.L.c 112§81R contractor) Site Review and Documentation R Site Review and Documentation R Soil condition and analysis X+ Energy efficiency X Footing and Foundation,including Reinforcement and X+ Fire Alarm Installation' X• Foundation attachment Concrete Floor and Under Floor X+ Fire Suppression Installation' X* Lowest Floor Flood Elevation Field Reports' Structural Frame—wall/floor/roof X Carbon Monoxide Detection System' Lath and Plaster/Gypsum Seismic reinforcement Fire Resistant Wall/Partitions framing Smoke Control Systems Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents Above Ceiling inspection Accessibility(521 CMR) X Fire Blocking/Stopping System Other. Emergency Lighting/Exit Signage—See Below X Means of Egress Componenets X Special Inspections(Section 1704): Roofing,coping/System X Venting Systems(kitchen,chemical,fume) X Mechanical Systems X 1.Indicate with an'x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below 2.Include NFPA 72 test and acceptance documentation 3.Include applicable NFPA 13, 13R, 13D, 14, 15,17,20,241,etc.-test and acceptance documentation 4.Include NFPA 720 Record of Completion and Inspection and Test Form 5.Include field reports and related documentation 6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this code with respect to examination of the contract documents,including plans.computations and specifications,and field inspections Work Descriptions: X+-Separate Foundation Affidavit filed 23 OCT 2020 X*-Separate Final Affidavits required by respective RDPs Final finishes,equipment and devices installed. Emergency egress lighting tested to provide Code minimum of 1 Foot- Candle(11 Lux)below devices and.1 Foot-Candle(1 Lux) along egressways and at mid-court nets. Horn/Strobe units elevated to be visible from mid-court nets a Describe in sufficient detail the work(i e.foundation steel reinforcing kitchen vent system,etc)and the location on the pout a 1' 'f applicable,the submittal documents that pertain to the work which was inspected �* OF l/gs2/c Enter in the space to the right a"wet"or ARNUM electronic signature and seal: ',(PHlLuROOK'\'./'`' {" MECHANICAL u' No.30690G\ e �0 ScFGrSTE��O��ttr S e• - IZ `,30.-- Phone number: 508-385-8682(o)&508-364-1301 (c) Email: Tvarnphil@Verizon.Net Building Official Use Only Building Official Name: Permit No.: Date: Version 06_11_2013-mod 02_25_2018 tvp Project No: Final Construction Control Document p47 f/ To be submitted at completion of construction by a RECEIVED Registered Design Professional for work per the 9th edition of the DEC 0 6 2021 .''s4". -A V) IMP Massachusetts State BuildingCode, 780 CMR, Section 107.6.4 ��_ BUILDING DEPARTMENT BY — Project Title: Mid-Cape Athletic Tennis Court Enclosure Date: 1 December 2021 Property Address: Mid-Cape Athletic Club, 193 White's Path, South Yarmouth,MA 02664 Project: Check(x)one or both as applicable: XX New construction Existing Construction Project description: Legacy Metal Framed/Fabric Skinned Mfg.Building on Concrete Foundation I T.Varnum Philbrook MA Registration Number: 30690 Expiration date: 30 JUN 2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project Architectural _XX+_ Structural XX*_ Mechanical _+_ Fire Protection _XX* Electrical _XX_ Other:_Engineer-of-Record +Mfg.Building& Fire Protection Design by other MA Licensed RDPs *supervise Licensed Professionals for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: ... of--, ;;t,P(..._____) ARNUM�i, 'oLBROOK ` I" HANICAL v.1 '.o .3069 ,sTE �• 1 . VA(1-,40 -• cenur3i2enDv---- • UNAL Phone number: 508-385-8682(o)&508-364-1301 (c) Emai : varnphil@Verizon.Net Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 06_11_2013-mod 02 25_2018 tvp RECEIVED DEC 0 6 2021 BUILDING DEPARTMENT —# Final Construction Control Document By: /' To be submitted at completion of construction by a • Registered Design Professional for work per the 9h edition of the Massachusetts State Building Code. 780 CMR, Section 107.6.4 Project Title:Mid Cape Athletic Center, New Rear Building Date:11/16/21 Permit No. Proper Address: 193 Whites Path,South Yarmouth.MA 02664 Project: Check(x)one or both as applicable:X New construction Existing Construction Project description:New Fire Sprinkler System I Anthony P Caputo P.E.MA Registration Nuinber.35218 Expiration date:6/30/22 ,am a registered design pro/irsstonat and hereby certify that I have prepared or directly supervised the preparation of all design plans. computations and specifications concerning' Entire Project Architectural Structural Mechanical X Fire Protection Electncal Other: for the above named project. I certify that I.or my designee.have performed the necessary professional services.on accordance with Professional Standard of Care.and was present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and that I or my designee i. Have reviewed,for conformance to this code and the design.concept.shop drawings.samples and other submittals by the contractor in accordance w ith the requirements of the construction documents.Such review shall not relieve the Contractor of its submittal and other resposnibilines. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code.The contractor is responsible for the performance of the work in accordancewith the contract documents and shall be exclusively responsible for its construction means,methods. sequences and procedures.and for constriction safety. Enter in the space to the right a"wet or -AO"oF,v� electronicAVv- signature and seal mac' minor(P eye CI9Ei �/ en 4-j / , -Pk Q/STEP Phone number: Email: SSvAt.Ern 'y !tinkling t rilicial Ike Only Building Official Name: Permit No. Date: j Note 1.Indicate with an'x project deign plan;.computations and iaiecitications thci you prcpu'ed or directhv sup.wised.If'other'is chosam. provide a de eruption. Trial Version 10 09 2012