Loading...
HomeMy WebLinkAboutConstruction Protocol(12.27.22)J.M. OREILLY & ASSOCIATES, INC. PROFESSIONAL ENGINEERING, LAND SURVEYING ice` ENVIRONMENTAL SERVICES Site Development • Property Line • Subdivision • Sanitary • Land Court • Environmental Permitting December 27, 2022 CONSTRUCTION PROTOCOL Miracle Way &Faith Road Cluster Subdivision Assessors' Map 125, Parcel 39, Route 6A Yarmouth, MA 1) Pre -Construction Requirements: JMO-8807 a) All approval documents requiring recording shall be recorded at the Registry of Deeds in Barnstable. b) Contractor shall provide the Town of Yarmouth Planning, Engineering and Conservation offices with work notice and notify the start of the installation of the Work line. Limit of line. 2) Limit of Work Installation: 3) a) The limit of work shall be installed prior to commencement of all other construction work. b) Limit of work shall consist of a row of 9 inch straw waddles, staked in place. Refer to the Erosion & Sediment Control Plan for limit of work location and details. c) Contractor and developer shall review limit of work line prior to clearing in order to designate for protection any signcant trees wn the limit of work boundary which can be preserved. Site Access: aI All construction site access shall be from the proposed roadway access along Route 6A. Refer to the Stormwater Pollution Prevention Plan (SWPPP) for best management practices at the site access area. 4) Commence Work: a) Vegetation within the work limit shall be removed with the areas grubbed and prepared for work. b) Loam shall be stripped and stockpiled per SWPPP best management practices. The site shall be rough graded per the Site Construction Plans (Plans). c) Roadway, shoulder and main drainage swale areas shall be graded and compacted per the Plans. Any organic soils, debris or otherwise unsuitable materials shall be removed from the roadway sub -base. 15�3 MAIN STREET, P.O. BOX I773, BREWSTER, MA 02631 •PHONE: (508) 896-660I FAX: (So8) 896-66oz WWW.JMOREILLYASSOC.COM d) Underground utilities, including water, gas, electric and telecommunications, shall be installed within the road layout. Contractor shall coordinate all necessary connections, inspections, etc. with the necessary Town or utility entities. e) Drainage structures within the road layout shall be installed, including all catch basins, manholes and piping. Roadway leaching facilities shall be installed within the adjacent drainage easement areas. Catch basins shall be installed within the (2) main drainage swales. f) Both roadways shall be installed per the specifications on the Plans, particularly the Road Pavement Section and Notes on 'C5 Details & Notes' plan. Paving of finish course layer may be delayed until after construction of dwelling and septic systems are completed if desired by developer. g) Driveways and shoulder areas shall be graded and compacted per the Plans. Any organic soils, debris or otherwise unsuitable materials shall be removed from the driveway sub -base. h) The (14) building foundations shall be excavated and installed on each lot per the Plans. Contractor is responsible for obtaining all necessary building permits for this work. i) The (14) septic systems shall be installed and connected to the building foundation on each lot per the Plans. Contractor is responsible for obtaining all necessary septic permits for this work. j) The (14) buildings will be constructed. All utility connections and roof runoff drywells shall be installed. k) The (14) driveways shall be installed per the specifications on the Plans, particularly the Driveway Pavement Section and Notes on 'C5 Details & Notes' plan. I) The (2) main dry water quality swales and (5) secondary dry water quality swales shall be installed per the Plans, see the stormwater and swale details and notes on 'C5 Details & Notes' plan. m) All remaining undeveloped disturbed areas within the work limit shall be revegetated per the specifications on 'C9 Landscape Plan'. Temporary irrigation shall be used as required for new groundcover, shrubs and trees. 5) Project Timing: a) Project will likely span 6-9 months due to the project's scale and the need to coordinate stakings, connections, inspections, etc. with the project engineer, Town and utility companies. The mitigation portion of the project will last for multiple growing seasons until plantings have been sufficiently established. 6) Clean Up: a) On a daily basis, the contractor will be responsible for the cleanup of all debris within the project site. b) Limit of work shall not be removed until the completion of all construction activities, vegetation has been sufficient established and ground surface has been stabilized. Davenport Single -Family Cluster Development December 27, 2022 Lot 2 (125/39) —Route 6A Yarmouthport JMO-8807