HomeMy WebLinkAboutReview Checklist e C./ c e cA> C) V) ly - Yer'rn.Nt \ SLA.120 ,
TOW, ' OF YARMOUTH k Ce I Z5 CS
SEWAGE PLAN REVIEW CHECKLIST l
Location: A.M. Lot Zone of Contribution: In Out orAcrea_e ��`,er
�� In,I �� & Commercial: Residential:
Street: v
Village: j Floor Plan: t - # Bedrooms:
Owner: Installer: /
Address: !, DGv e r P e.CG u t�
Phone:
Phone:
Builder: Engineer: �j eef G r
Address: Phone:
Phone:
NIA YES I NO I
1. Required# of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table i
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands t/
7. Septic tank minimum 10 ft from foundation, deck Var.: f L- -
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: Gf / I 'ram`
9. Leaching minimum 100 ft from wetlands Var.: ff [/
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: I
11. Tank/leaching minimum 10 ft from property line Var.: I
12. System meets all other setback requirements Var.: , /
13. Uses adjustment for maximum high groundwater Var.:. / ' .- 9' [,/ .__.-
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal I V
16. Proposed contours are suitable 1_. ,.
17. System meets slope requirements-min. 1/8", ',/."preferred
18. System meets breakout requirements PVC liner: Wall: f i.---/
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal i % -
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade .
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size
2S. Se tic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: le""
32. Engineer/Registered Sanitarian and Land Surveyor stains/signature j J
33. .-.2.0 loading is sus.- • -. . • .undwater I �%
3-. itle V Application and permit fee, installer signature ) I.
35. Foundation tooting min. 2 feet above adjusiedground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd I r
37. Check area lots for groundwater/ bel groundwater in Assessor's Map 1
Plan reviewed by: � 6 of 0,