HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location. A.M. a .1 Lot 17 Zone of Contribution: In Outer Acreage
Commercial: Residential: s..--•
Street: t2 c Y (\•q c k-e r.) Z , e 1`c(
Village: Floor Plan: V #Bedrooms: 5 '
Owner: Installer: S C L C
Address: e 6 e 7/
Phone:
Phone:
Builder: Engineer: V, . S v N
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table .4
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
-
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 7
9. Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: 1,/'
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: i ' -ow
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC liner: Wall: -
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel I/
21.No garbage disposal L----'
22. System adequately sized for its intended use `/
23.Minimum 6"stone or compacted below tank and dbox !---
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate-meter for duplexes l/'
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size- 1-------
28. Septic tank/pump chamber to be factory waterproofed ../'
29. Vent provided if leaching below 3 feet,under driveway/parking L -
30. Buoyancy calculations for tank/pump chamber i'
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 1/"
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature
35. Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: lt.c.9 - 6 o o:
1-5--0)-3