Loading...
HomeMy WebLinkAboutEngineer Certification Letter BSC GROUP Engineers BUILD I SUPPORT I CONNECT Environmental Scientists Software Developers AUG 2 9 2022 Landscape Architects Planners HEALTH DEPT. Surveyors AUGUST 25,2022 www.bscgroup.com Bruce G.Murphy,Health Director Town of Yarmouth 1146 Route 28 South Yarmouth,MA 02644 RE: Certification of Sewage Disposal System at 340 Higgins Crowell Road,West Yarmouth BSC Project No.5-0628.00 Dear Bruce: In August of 2022,BSC Group,Inc.(BSC)visited the property referenced above,to observe the construction of the on- site sewage disposal system.BSC observed the excavation and removal of unsuitable soils,and observed the installed concrete chambers,septic tank,distribution box,and PVC piping prior to backfill. Based on the observations of BSC's Engineering staff,the newly constructed system is consistent with the approved plans and appears to comply with the regulations as set forth in 310 CMR 15.000 and the Town of Yarmouth Board of Health Regulations.Please do not hesitate to contact our office with any inquiries you may have. Sincerely, BSC Group,Inc. .0OFMAT a BRIAN G. ' ‘I o YERGATIAN IVIL ,09� 'j,1�206P�Q�4�/ 411 u670NmA EN Brian G.Yergatian,P.E.,LEED AP Manager of Civil Engineering/Senior Associate 349 Main Street,Route 28,Unit D/West Yarmouth,MA 02673/508-778-8919 �1 1