SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 14.5 Lot $ Zone of Contribution: In Out Acreage /g 47_5-D
Street: Commercial: Residential: �
Village: Floor Plan: )/ #Bedrooms: 3 3
Owner: Installer: 13 CV/3
Address: Phone:
Phone:
Builder: Engineer: I:4 g-41 e r
Address: Phone: /
Phone:
N/A YES NO
1. Required#of copies received l----
2.Date of soils exam and percolation test not older than 2 years 1 -
3. 4-5 ft of naturally occurring pervious material,above water table r/
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands i
7. Septic tank minimum 10 ft from foundation, deck Var.: j
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: G/
15. System not in top or subsoil (A,B horizons)or 5' removal
16.Proposed contours are suitable .
17. System meets slope requirements-min. 1/8", '''A"preferred vl f
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee `�
20. Sewage is under 10,000 gpd for parcel v
21.No garbage disposal
22. System adequately sized for its intended use k"--.
23.Minimum 6"stone or compacted below tank and dbox i '
24. Manhole covers within 6"of grade,pump chamber cover to grade v
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed 1/
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber -/
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater v
34.Title V Application and permit fee,installer signature //
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd '
37. Check area lots for groundwater/Label groundwater in Assessor's Map -�
Plan reviewed by: /��?n,...,�q,y� _ 6 o:o: