Jay & Christine,
Attached is a revised plan for the subject property. The contractor pointed out a typo on the profile
section, sheet 2. The revised plan has been corrected to show the 18' field width noted in all other
sections and calculations on the plan.
How many hard copies would you like for your files?
Peter
Peter T. McEntee PE - Principal
Engineering Works, Inc.
12 West Crossfield Road
Forestdale, MA 02644
Tel/fax (508) 477-5313 don ne'`'.( e ,� jm
x 100.98 EXISTING SPOT GRADE
— — 101 — — EXISTING CONTOUR
02 PROPOSED CONTOUR N Croy 5
—W— EXISTING WATER SERVICE -
BK 145-PG 5 — O.I+ W, — OVERHEAD WIRES NYV,v.;, ; p 4 x�e,• sf
TEST PIT aye , s. cWmrec sf
Yarmouth Health Depa men BENCHMARK D�nhW.r
APPROVE � z � eda•Si
LEGEND
r— ! 3fiore Irfi '
c� Hrarktack 5f
Name •Date Q,t�ry Poiol Pr
S 02' 1 7' 30- E - _ _ __-. 27 Holly h, Mouth
LHEAH
Yarmouth, MA 02664
101.37 Wara0p 9Rd
1.20' 22 g WamlwomV101,D6LOCUS MAP
x TP----25------{ 12' PT._.w_..
PROPOSED SEPTIC TANK f -- -
_ --PROPOSED S.A.S, GENERAL NOTES:
PUMP CHAMBER Iifl1,12. 18' x 25' LEACH FIELD
1500/500 CAPACITIES H-10 v--- �a0
( ) b SHED �- W/3 DISTRIBUTION LINES 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL
x EXISTING SHED 2. ALL WORK ANDD OFLTH MATERALS S ALLAND THEI CONFORM TO THE REQUIREMENTS
31' L._.__... J REMOVE & RELOCATE OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE
77 _ LOCAL RULES AND REGULATIONS. except as requested below:
�s x 01,67 BENCHMARK -310 CMR 15.405(1)(b)&(h): CONTENTS OF LOCAL UPGRADE APPROVAL
EXISTING CESSPOOL �in 2 BULKHEAD CORNER
a 1) A 5' variance, S.A.S. to bulkhead corner, for a 15' setback.
TO BE REMOVED 1 BB 1 4 ~ N EL.=101.70 2) A 1' reduction to the required separation between adjusted
(SEE NOTE 11) 1 x --- high groundwater and bottom of S.A.S., for 4' of separation,
1 PAT/O PATIO AL 1 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR
to ti X PROPOSED SEWER CONNECTION TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE
OD \ shed si BH 101.55 z INV.=100.1t(FIELD VERIFY} DESIGN ENGINEER.
� N EX. SEWER00
4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING
1NV.=) ?.2:� o oe FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN
�j % on ENGINEER BEFORE CONSTRUCTION CONTINUES.
0 10;0 �7 %EXISTING• � N 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM.
m ` ,SUN HOUSE/, 27) 101,30otl 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF
.� l� ' "ROOM T.O.F.=1t7012.03i X THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF
+ HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION.
I CELLAR �FL.=96.7f CHU
L JR.7. WATER SUPPLY PROVIDED BY TOWN WATER SUPPLY.
i
8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM.
x 101,34 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS
X101.35 AGREED 'UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE
y DIRECTED BY THE APPROVING AUTHORITIES.
100. 100,79 LOT 69 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING
1 8, 556 f S, F. CONSTRUCTION.
l x 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS
j t� i 101,23 IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND
REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3).
11 101,0'�1. - r� ��� OF M�Ss9 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE
I Wtfl__ 81 00'- ��P �yG INSPECTED BY DESIGN ENGINEER PRIOR TO BACKFILL.
1 L1 SrOl'43'40- W w IP FND o PETER T. 13. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED EXISTING
MCENTEE SEPTIC SYSTEM COMPONENTS NOT SHOWN ON THE PLAN.
CIVIL "' 14. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND
99.76 r No. 35109 IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY.
PK SET i0016 100.31 100.55 100,74p�� 15. AN ELECTRICAL PERMIT SHALL BE OBTAINED PRIOR TO CONSTRUCTION.
100.00
SS/
ROLL Y LA AW PROPOSED SEPTIC SYSTEM UPGRADE PLAN
27 HOLLY LANE, SOUTH YARMOUTH, MA
MACOMBER, PAULINE (LIFE EST)
OWNER RECORD Prepared for: Quinn's Excavotion, P.O. Box 599, Forestdale, MA 02649
FLOOD ZONE DESIGNATION 46 SOUTH MAIN ST, APT. 213 Engineers: Surveyors: SCALE DRAWN JOB. NO.
MAP NUMBER: 25001 CO5889J ATTLEBORO, MA 02703 Engineering Works, Inc. JC Engineering, Inc. 1 "=20' P.T.M. 328-22
EFFECTIVE DATE: JULY 16, 2016 12 West Crossfield Rood 2854 Cranberry Hwy.
ZONE AE(EL1 1) MAP ID:334-153 Forestdole, MA 02644 E.Wareham, MA 02538 DATE CHECKED SHEET No.
(508) 477-5313 (508) 273-0377 11/14/22 P.T.M. 1 Of 3
PROPOSED SEPTIC TANK/PUMP CHAMBER
PROVIDE RISERS WITH =RAMES & COVERS OVER
EACH ACCESS MANHOLE AND SET TO FINISH GRADE.
MANHOLES BROUGHT TO GRADE SHALL BE SECURED
TO PREVENT UNAUTHORIZED ACCESS.
7- T.O.F.=102.03t
rF.G. EL.=101.7t F.G. EL.=102.3t PROVIDE ENOUGH WIRE
EXISTING SLACK TO REMOVE PUMP
NOTE: TO PREVENT BREAKOUT, INSTALL A 40 MIL
POLY LINER AS SHOWN ON SHEET 1.
TOP OF LINER, EL.=103.2
BOTT. OF LINER, EL.=100.7
PROPOSED D-BOX
INSTALL WATERTIGHT RISER & PROPOSED S.A.S.
COVER SET TO 6" OF GRADE INSTALL INSPECTION PORT OUTSIDE DRIVEWAY FOOTPRINT
/ F.G. EL.=104.0f F.G. EL.=104f OVER FIELD
f /MAINTAIN 2% GRADE (MIN.) OVER S.A.S.
L=8'(MAX) 18' x 25' LEACHING FIELD W/3-4"
S=1% (Mw.j
L =18 PR 'vlD CTHR40 PVC 4"SCH40 avc NCH 44 PERF, PVC DISTRIBUTION LINES
. 3 S=Vi (MIN.) tOP EL.--IUU.1 4
4"SCH40 PVC AT ALL 8EN05
EFF.DEPTH
s
INV.=102.97
I NV. =102.8
TW'S ARE TO BE ` ADJ. GW EL.
4 SCH 40 PVC PROPOSED D-BOX
EFFFLUENT 98.1 3 OUTLETS (MIN.)
INVERT BABE Ia7RER:a STDG. GW EL.
=99.75 80TT, EL.=95.17 95.6
INV.=99.8t INV. =102.73-�
CONNECT TO EXISTING INV.=99.50
SEWER PIPE EFFLUENT FILTER SHALL BE INSTALLED ON OUTLET
INV.=100.1 t TEE AS MANUFACTURED BY ZABEL OR EQUAL. FILTER ESTABLISH VEGETATIVE COVER
SHALL BE INSPECTED AND CLEANED ANNUALLY OR AS AS DIRECTED BY THE SANDWICH
REQUIRED TO PREVENT SEWAGE BACK UP TO HOUSE. CONSERVATION COMMISSION
(See Pump Detail, Sheet 3 of 3)
1500/500 GALLON SEPTIC TANK/PUMP CHAMBER
PERFORATED IN S.A.S.,G�RAD
ABOVE S.A.S., WITH SC
SET TO WITHIN 3' OF
T'CAPPED ENDS
SLOPE OF PERF. PIPE = 0.51
25' EFFECTIVE LENGTH
SOIL ABSORPTION SYSTEM (PROFILE)
H-10 TANK •_:'
NOTES: BREAKOUT ELEV.=103.1 -
1) SEPTIC TANK/PUMP CHAMBER & D-BOX SHALL BE SET
LEVEL & TRUE TO GRADE ON A MECHANICALLY COMPACTED BOTTOM ELEV.=102.10
STABLE BASE OR SIX INCH CRUSHED STONE BASE AS 4' MIN. SEPARATION TO G.W.
SPECIFIED IN 310 CMR 15.221(2). (WITH VARIANCE)
AND 4' OF NATURALLY
2) INSTALL INLET & OUTLET TEES AS REQUIRED, OCCURRNG PERVIOUS SOILS
3) MAX. COVER OVER TANK, D-BOX & S.A.S. SHALL BE 36". EST. HIGH G.W. EL: 98.1
4) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS
PR'OR TO CONSTRUCTION.
SEPTIC SYSTEM PROFILE
DESIGN CRITERIA
NUMBER Or BEDROOMS: 2
SOIL TEXTURAL CLASS: CLASS I
DESIGN PERCOLATION RATE: <2 MIN/IN
DAILY FLOW: 330 GPD
DESIGN FLOW: 330 GPD
GARBAGE GRINDER: NO
LEACHING' AREA REQUIRED: (330 GPD) = 445.9 SF
. i'+ Lru/ �r
PROPOSED SEPTIC TANK/PUMP CHAMBER: 1500/500 GAL CAPACITY
PROPOSED D-BOX: 1 INLET, 3 OUTLET (MIN.), H-10
INSTALL A 18' x 25' LEACH FIELD
SIDEWALL AREA: NOT APPLICABLE
BOTTOM AREA: 18' x 25' = 450 S.F.
TOTAL AREA: .................I...........1......450 S.F.
LEACHING CAPACITY = 0.74 GPD/SF x 450 SF = 333.0 GPD
EL.= 1 02.60(END)
FINISH GRADE --I r-APPROVED FILTER FABRIC
- L.=104. ci
16' EFFECTIVE WIDTH
SOIL LOG
DATE: OCTOBER 20, 2022
SOIL EVALUATOR: PETER McENTEE SE#1542
WITNESS: JAY GARDINER HEALTH AGENT
ELEV. T P DEPTH
101.1 A 0"
LOAMY SAND
100 4 10YR 3/1
B 8„
LOAMY SAND
10YR 5/6 PERC
F1 27"
98.5 31"
C
MED. SAND
2.5Y 6/4
98.1 ADJ. GW ;W 48"
95.6 STG. GW 66"
'9
94.1 84"
PERC RATE G2 MIN/IN. "B" HORIZON
STANDING GW, EL.=95.5
INDEX WELL MIW-29, WATER LEVEL=9.4 (OCT 2022)
ZONE A ADJUSTMENT=2.5', ADJ. GW, EL.=98.0
3/4"-1 1/2" DOUBLE
WASHED STONE
PROPOSED S.A.S.
18' x 25' LEACH FIELD
W/3 DISTRIBUTION LINES
shr, I I BN
7.
INV.; 100.2f
/ EXISTING
,suN HOUSE(#927)
ROOM T.O.F. =102.03f'
%CELLAR I FL.=96.7t
�s
S.A.S. LAYOUT HEALTH DEFT
Index Well Readings
2019
2020
2021
)aviary
FeMvnry
Ma %
AD R
May
line
lJy
kr ,t Sepl.Ib.
2022
WNI
f0 "6 Reading
Zone A Z.-
B Zone C Zane D Tone F
3
W 41
Bm%table 23'
AIW231
27.5
1.7
2.3
3.4
4.5 5.1
learncure 231
Barnstable 247
AIW247R 2.
27.1
3.5
52
6.9
8.7
ehlltaWe:a-
2ourna 198
BMW198
13.8
r
cb8o:rcm "-'a
BreWrter 21
BMW21R %
123
3.3
4.9
'2 '20
l8rcvr1tat 21
Chatham 38
CGW138R
28.8
3.1
4.7
63
7.8
S
!c!,x.m '.sa
Meshpee 29
MIW29
9A
2.5
5.7
4.9
6.2
S-d,lch 153
SDW253R +%
49.1
3.6
3A
7.2
Truro 89
TSwB9
11.9
1.7
2.6
3A
Wetifleet:7
WNW17R
13.=
L6
3A
5.1
lsrdAm 2s3
I
lTa+ro 39
M-th
PROPOSED
SEPTIC SYSTEM UPGRADE
PLAN
27 HOLLY LANE, SOUTH YARMOUTH,
MA
Prepared for: Quinn's Excavation, P.O. Box 599, Forestdole,
MA 02649
Engineers:
Engineering Yforks, Inc.
12 West Crossfield Road
Forestdole, MA 02644
(508) 477-5313
Surveyors:
,IC Engineering, Inc.
2854 Cranberry Hwy.
E.Warehom, MA 02538
(508) 273-0377
SCALE
N.T.S.
DRAWN
P.T.M.
JOB. NO.
328-22
DATE
11/14/22
CHECKED
P.T.M.
SHEET NO.
2 Of 3
PROVIDE WATERTIGHT RISER, FRAME
& SECURED COVER SET TO GRADE
HOISTING CABLE 7x19 STAINLESS STEEL
1/8" DIAMETER. % 1,760 LB. STRENGTH
INV.(IN)=99.50
ALARM ON EL: 97.17
PUMP ON EL: 96.67
BOTTOM OF PUMP OFF EL: 96.17 204'
PUMP CHAMBER 8
ELEV.= 95.17
PROVIDE 2— WIDE ANGLE FLOATS: 45q
FLOAT NO.1: PUMP ON/OFF—SJ RHOMBUS (PROVIDED WITH PUMP)
FLOAT NO.2: ALARM ACTIVATION FLOAT —PROVIDED WITH ALARM PANEL
'CN SEPARATE CIRCUIT FROV PUMP SPECIFIED)
4" KNOCKOUTS
(TYP. )
12'-2"
- NEMA 4 JUNCTION BOX CORROSION RESISTANT
& LIQUID —TIGHT CABLE CONNECTORS SUPPORTED
BY 1-1/4" PVC CONDUIT. JOINTS TO BE MADE
WATERTIGHT. USE SJE RHOMBUS—JB PLUGGER
OR EQUAL. PROVIDE ENOUGH WIRE
SLACK TO REMOVE PUMP
INSTALL 1' PVC CONDUIT TO HOUSE FOR WIRING
WITH WATERTIGHT JOINTS. WIRE HIGH WATER ALARM
FLOAT TO SJE RHOMBUS TANK ALERT XT ALARM PANEL
ON CIRCUIT SEPARATE FROM CIRCUIT TO THE PUMP.
2" BALL VALVE (FIELD ADJUST FOR 20 GPM RATE)
(INSTALL OVICK DISCONNECT FOR EASY REMOVAL)
2"SCH. 40 DISCHARGE (THROUGH RISER —SEE PROFILE)
2" 90' ELBOW W/ 1/4" WEEP HOLE
FOR SELF —DRAINING FORCE MAIN
2" SWING CHECK VALVE
2" SCH. 40 PVC DISCHARGE PIPE
ADDITIONAL 3/16" VENT HOLE (MIN.) ABOVE PUMP FLANGE
(TO PREVENT PREMATURE PUMP BURNOUT)
LIBERTY LE40 SERIES PUMP .4 H.P. 115 V
WITH 2" DISCHARGE, OR EQUAL
PUMP AND ACCESSORIES AVAILABLE AT:
CAPE COD WINWATER WORKS CO., HYANNIS, MA. (508) 862-0166
NOTE: APPROVED ALTERNATE MAY BE SUBSTITUTED.
I ! I t
I 1 I I
1 1 I I
ii II
\ / !
1 1
! I I I
f I 1 A
I I I
i—.—LL----I—t---
PI AN X/11=U1/
PUMP DETAIL
N. T. S.
20" DIA.
(TY( P)
--- "{)
COVERS
,
$„
4»
20" DIA. COVERS
(TYP.)
A
5'-8" f 4" OUTLET
4" INLET KNOCK
4» KNOCKOUTS
3
4'-3"
SUPPORT LIQUID (SEE NOTE 3)'
I
COMPARTMENT,.'
BEAMS LEVEL
;TYP1
ALL AVAILABLE
J
5
—
4"
CROSS SECTION A -A
SPECIFICATIONS WT of H-10: 18.852 LBS.
1.) CONCRETE 4,000 PSI AFTER 28 DAYS.
2.) CONSTRUCTION CONFORMS TO DEP TITLE V REGS.
310 CMR SECTION 15.226.
3.) TONGUE & GROOVE JOINT SEALED W/ BUTYL RESIN & WRAPPED
4.) REINFORCEMENT PER ASTM C1227-93.
5.) ALSO AVAILABLE IN H-20 LOADING.
&) PROVIDE POLYMER WATERPROOF COATING
H-10 SEPTIC TANK/PUMP CHAMBER 1500/500
WIGGIN PRECAST CORP., BOURNE MA. (800) 564-6774
4'
SJR
ROOM
HER��
shed Shr.f BH
KIT./DIN. BATH BEDROOM
LIV. RM.
FLOOR PLAN
FOR SCHEMATIC PURPOSES ONLY
BUOYANCY CALCULATIONS
H-10 SEPTIC TANK/PUMP CHAMBER
BOTTOM OF UNIT EL.= 95.17
HIGH GROUNDWATER EL.=98.1
BUOYANCY FORCE PER FOOT OF DEPTH:
12.2' x 6.7' x 1' x 62.4 Ibs./cu.ft. = 5100.6 lbs.
MAX. DISPLACEMENT = 98.1' — 95.17' = 2.93'
MAX. UPLIFT PRESSURE = 2.93' x 5100.6 Ibs/ft = 14,944.7 lbs.
WEIGHT OF UNIT EMPTY = 18,852 lbs.
18,852 LBS. > 14,945 LBS. O.K.
DOSING & STORAGE REQUIREMENTS
DESIGN FLOW:
330 GPD
DOSING REQUIRED:
4 CYCLES/DAY (RECOMMENDED)
330 _ 4 = 82.5 GALLONS/CYCLE
DISTANCE REQUIRED
BETWEEN PUMP
ON AND PUMP OFF
FLOATS:
82.5 GAL/CYCLE _
125 GAL/FT = 0.66 FT/CYCLE (USE 6")
STORAGE REQUIRED
ABOVE WORKING LEVEL: 330 GALLONS
STORAGE PROVIDED:
iNV.(IN) EL: 99.50
— PUMP ON EL: 96.67 = 2.83'
STORAGE PROVIDED
= 2.83' x 125 GAL/FT = 353.8 GALLONS
PROPOSED
SEPTIC SYSTEM UPGRADE
PLAN
27 HOLLY LANE, SOUTH YARMOUTH,
MA
Prepared for: Quinn's Excavation, P.O. Box 599, Forestdale,
MA 02649
Engineers:
Engineering Works, Inc.
12 West Crossfield Road
Forestdale, MA 02644
(508) 477-5313
Surveyors:
JCEngineering, Inc.
2854 Cranberry Hwy.
E.Warehom, MA 02538
(508) 273-0377
SCALE
N.T.S.
DRAWN
P.T.M.
JOB. NO.
328-22
DATE
11/14/22
CHECKED
P.T.M.
SHEET NO,
3 Of 3