Loading...
HomeMy WebLinkAboutReview Checkist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3 7 Lot 77 Zone of Contribution: In Out Acreage '7/S o o � ! I Commercial: �--- Residential: L- Street: (j O Deis i to -- H v-e ---- Village: Floor Plan: #Bedrooms: Owner: C F-q .C 4 C v.Q J- Installer: 1� I C. Address: _ Phone: Phone: Builder: Engineer: c ' o -- Address: Phone: Phone: N/A YES NO 1. Required#of copies received ✓- 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: j ,.-- 5. Water line 10 ft from septic components Var.: .4---' -_ 6. Benchmark indicated and shown-NGVD if near wetlands v 7. Septic tank minimum 10 ft from foundation, deck Var.: 1 c-- - 8.Leaching minimumt ft full, crawl, 10 ft slab Var.: ! '-2 ii a.Fr dI' _ 9. Leaching minimum 100 ft from wetlands Var.: P/• 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: C- 12. System meets all other setback requirements Var.: \� 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/4"preferred _18. System meets breakout requirements PVC liner: 'Wall: 1 - 19. Specified tee sizes are proper, gas baffle on outlet tee �" 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal V 22. System adequately sized for its intended use f 23.Minimum 6"stone or compacted below tank and dbox / 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed V 29. Vent provided if leaching below 3 feet,under driveway/parking , c + 30. Buoyancy calculations for tank/pump chamber L,---* 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic,groundwater v 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map /- Plan reviewed by: (�,.. e C-A -- 6 o:o: I ' // - .d 3