Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR30 (1-10-23)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 30 PAGE 1 OF 2 PROJECT NO: Z486.01 DATE: 1/10/23 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Cloudy, 35-38°F CONTRACTOR(S): DellbrookǀJKS; Future Fence Company 1. Henry Tinoco arrived on site at 0745 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One E88 Bobcat Tracked Excavator with Auger Attachment B) One T66 Bobcat Tracked Loader C) One JCB 507-42 Telehandler 3. Earthwork observed: A) Drilling of the shaft foundations for the proposed sound wall within the southwesterly portion of the site along the side of the parking lot took place today (see attached Annotated Site Plan, Figure No. 1). The ground surface along the proposed wall alignment in the noted area generally consisted of loam fill at about Elevation 40± feet. Future Fence Company (FFC) used an E88 Bobcat tracked excavator equipped with a 2.5± foot diameter auger to drill nineteen proposed shafts which we reference as nos. DS9 through DS11, and DS13 through DS28 on the attached Figure No. 1 and drilled shaft log. FFC augured down to a depth of about 8.5± feet for drilled shafts nos. DS9 through DS11, and about 9.5± feet for drilled shaft nos. DS13 through DS28. These drilled shaft excavations appeared to extend through about 6± inches of surficial loam fill and into sand appearing to generally consist of tan to reddish brown, fine to medium sand, trace silt. These drilled excavations appeared to terminate in similar natural sand. Groundwater was not observed in these drilled excavations. FFC tamped loosened soil along the bottom of the drilled excavations with the auger and a 4 inch x 4 inch wood post. The exposed sand along the bottom of the drilled excavations appeared firm and stable. 4. Attachments: Drilled Shaft Log Photo Log Figure No. 1 – Annotated Site Plan ONSITE: TRAVEL: REPORT: TOTAL: 7.25 hours 1.50 hours 1.00 hour 9.75 hours Henry Tinoco FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 30 PAGE 2 OF 2 PROJECT NO: Z486.01 DATE: 1/10/23 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner 30 Date:1/10/2023 File No.:Z486.01 Observer:Henry Martinez Tinoco Reviewed By:Mark Zambernardi, P.E 9 8.5± 10 8.5± 11 8.5± 13 9.5± 14 9.5± 15 9.5± 16 9.5± 17 9.5± 18 9.5± 19 9.5± 20 9.5± 21 9.5± 22 9.5± 23 9.5± 24 9.5± 25 9.5± 26 9.5± 27 9.5± 28 9.5± 1/10/23 1/10/23 Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand1/10/23 1/10/23 1/10/23 1/10/23 Natural Sand Natural Sand Natural Sand 2.5± 2.5± 2.5± Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 40± 40± 40± 40± 40± 40± 40± 40± 40± 40± 40± 40± 40± 1/10/23 1/10/23 1/10/23 1/10/23 1/10/23 1/10/23 1/10/23 1/10/23 1/10/23 NORTHEAST GEOTECHNICAL, INC. Project: DRILLED SHAFT LOG GROUND SURFACE ELEVATION (FT) GROUNDWATER DEPTH (FT) Report No: FedEx Distribution Facility 225 White's Path South Yarmouth, MA SHAFT LENGTH (FT) SHAFT DIAMETER (FT) DESCRIPTION OF SOIL AT BOTTOM OF SHAFT SHAFT NO. DATE OF DRILLING NOTES 2.5± 1/10/23 1/10/23 1/10/23 1/10/23 2.5± 40± 40± 40± 40± 40± 40± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2. Bottom of excavation was tamped with the auger and a 4 inch x 4 inch wood post. 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1, 2 1. A 30 inch diameter auger was used during drilled shaft excavation. NOTES: 1, 2 1, 2 1, 2 1, 2 1, 2 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 30 Page 1 of 3 Photograph #1 Description of Photograph: Drilling of shaft no. DS13. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 Photograph #2 Description of Photograph: Tamping of excavation bottom at drilled shaft no. DS14. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 30 Page 2 of 3 Photograph #3 Description of Photograph: Drilled shaft no. DS15 after drilling operation. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 Photograph #4 Description of Photograph: Drilling shaft no. DS15. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 30 Page 3 of 3 Photograph #5 Description of Photograph: Removal of soil from drilled shaft no. DS21. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 Photograph #6 Description of Photograph: Drilling and tamping with auger at drilled shaft no. DS27. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/10/23 106.3' 164.3' 77.3' 96.7' 29.0' 48.3' 77.3' 87.0' 110°0'0"' 155°0'0"' 165°0'0"'150°0'0"' ADDRESS: PLATE NO. SHEET TITLE PROJECT NAME: 1866 Woodslee Street Troy, Michigan 48083 office (248) 680-0400 fax (248) 680-9745 This drawing is copyrighted and is the soleproperty of the owner it is produced solely for use by the owner and its affiliates. Reproduction or use of this drawing and/orthe information contained in it is forbidden without the written permission of the owner. FedEx Yarmouth Sound Wall 225 Whites Path South Yarmouth, MA 02664 SITE PLAN PROJECT NO.:220705 DATE:9/19/22 DRAWN BY: ETT CHECKED BY:JMC No.:REVISION DESCRIPTION DATE: G2-1 OVERALL PLAN 0 40'60'20'10' GRAPHIC SCALE START OF 13-FT. SOUND WALL STA 0+00 END OF 16-FT. SOUND WALL STA 6+87.1 END OF 13-FT. SOUND WALL START OF 16-FT. SOUND WALL STA 1+06.6 SEE DETAIL A WALL CORNER STA 2+70.9 SEE DETAIL B WALL CORNER STA 3+48.8 SEE DETAIL A WALL CORNER STA 4+45.4 SEE DETAIL C WALL CORNER STA 4+74.4 SEE DETAIL D WALL CORNER STA 5+22.8 SEE DETAIL E WALL CORNER STA 6+00.3 SEE DETAIL F NOTES: 1. FIELD LOCATE ALL UTILITIES BEFORE EXCAVATING FOUNDATIONS 2. COORDINATE FOUNDATION LOCATIONS ADJACENT TO EXISTING WATER LINES AND HYDRANT ACCORDINGLY DETAIL C DETAIL D DETAIL E DETAIL F \\troy\geotechnical\2022 geotechnical\220705 fedex yarmouth sound wall\cad\220705.dwgDETAIL A DETAIL B SEE NOTE 2 SEE NOTE 2 11/4/22Architectural Review111/4/2022