Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR32 (1-16-23)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 32 PAGE 1 OF 2 PROJECT NO: Z486.01 DATE: 1/16/23 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Snow/Rain, 30-35°F CONTRACTOR(S): DellbrookǀJKS; Future Fence Company 1. Henry Tinoco arrived on site at 0730 hours. Left site at 1500 hours. 2. Earthwork equipment: A) One E88 Bobcat Tracked Excavator with Auger Attachment B) One T66 Bobcat Tracked Loader C) One JCB 507-42 Telehandler 3. Earthwork observed: A) Drilling of the shaft foundations for the proposed sound wall within the southwesterly portion of the site along the side of the parking area took place today (see attached Annotated Site Plan, Figure No. 1). The ground surface along the proposed wall alignment in the noted area generally consisted of topsoil/loam fill at about Elevations 40± to 42± feet. Future Fence Company (FFC) used an E88 Bobcat tracked excavator equipped with a 2.5± foot diameter auger to drill fifteen proposed shafts which we reference as nos. DS35 through DS49 on the attached Figure No. 1 and drilled shaft log. FFC augured down to a depth of about 9.5± feet for drilled shaft nos. DS35 through DS47. These drilled shaft excavations appeared to extend through about 4± to 6± inches of surficial topsoil/loam fill, up to approximately 4± feet of apparent sand fill and into apparent natural sand. The sand soils appeared to generally consist of tan to reddish brown, fine to medium sand, trace silt. These drilled excavations appeared to terminate in similar natural sand. Groundwater was not observed in these drilled excavations. FFC tamped loosened soil along the bottom of the drilled excavations with the auger and a 5 inch x 5 inch plate attached to a rebar (hand tamper). The exposed sand along the bottom of the drilled excavations appeared firm and stable. FFC began drilling excavations for shaft nos. DS48 and DS49 on this date. These excavations were terminated before the proposed bottom of shaft elevation was reached due to the presence of a water line, which was exposed at approximately 9± feet below ground surface in the excavation for drilled shaft no. DS49. FFC covered the partially excavated shaft nos. DS48 and DS49 with pallets and intend to relocate the shafts to avoid the water line. ONSITE: TRAVEL: REPORT: TOTAL: 7.50 hours 1.50 hours 1.00 hour 10.00 hours Henry Tinoco FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 32 PAGE 2 OF 2 PROJECT NO: Z486.01 DATE: 1/16/23 4. Attachments: Drilled Shaft Log Photo Log Figure No. 1 – Annotated Site Plan 5. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner 32 Date:1/16/2023 File No.:Z486.01 Observer:Henry Martinez Tinoco Reviewed By:Mark Zambernardi, P.E 35 9.5± 36 9.5± 37 9.5± 38 9.5± 39 9.5± 40 9.5± 41 9.5± 42 9.5± 43 9.5± 44 9.5± 45 9.5± 46 9.5± 47 9.5± 48 --- 49 --- 1. A 30 inch diameter auger was used for drilled shaft excavation. NOTES: 4. Drilled excavation terminated before reaching proposed bottom of shaft elevation due to the presence of a water line. Shifting the proposed drilled shaft location is planned. 2.5± 2.5± 2.5± 2.5± 2.5± 2. Removal of roots from about 0± to 4± feet below ground surface was performed at shaft location. 3. Loosened soil along the bottom of the drilled shaft was tamped with the auger and hand tamper. 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,4 1,4 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 2.5± 1/16/23 1/16/23 1/16/23 1/16/23 42± 41± NORTHEAST GEOTECHNICAL, INC. Project: DRILLED SHAFT LOG GROUND SURFACE ELEVATION (FT) GROUNDWATER DEPTH (FT) Report No: FedEx Distribution Facility 225 White's Path South Yarmouth, MA SHAFT LENGTH (FT) SHAFT DIAMETER (FT) DESCRIPTION OF SOIL AT BOTTOM OF SHAFT SHAFT NO. DATE OF DRILLING NOTES 1/16/23 1/16/23 1/16/23 1/16/23 1/16/23 1/16/23 1/16/23 1/16/23 1/16/23 42± 42± 42± 41± 40± 42± 42± 42± 42± 42± 40± 41± 41± N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand Natural Sand ---1/16/23 1/16/23 ---2.5± NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 32 Page 1 of 2 Photograph #1 Description of Photograph: Drilling of shaft no. DS38. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/16/23 Photograph #2 Description of Photograph: Tamping of sand along bottom of shaft no. DS40 and drilling of shaft no. DS42. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/16/23 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 32 Page 2 of 2 Photograph #3 Description of Photograph: Drilled shaft no. DS43 after auguring down 9.5± feet. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/16/23 Photograph #4 Description of Photograph: Removal of roots from shaft no. DS41. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 1/16/23 106.3' 164.3' 77.3' 96.7' 29.0' 48.3' 77.3' 87.0' 110°0'0"' 155°0'0"' 165°0'0"'150°0'0"' ADDRESS: PLATE NO. SHEET TITLE PROJECT NAME: 1866 Woodslee Street Troy, Michigan 48083 office (248) 680-0400 fax (248) 680-9745 This drawing is copyrighted and is the soleproperty of the owner it is produced solely for use by the owner and its affiliates. Reproduction or use of this drawing and/orthe information contained in it is forbidden without the written permission of the owner. FedEx Yarmouth Sound Wall 225 Whites Path South Yarmouth, MA 02664 SITE PLAN PROJECT NO.:220705 DATE:9/19/22 DRAWN BY: ETT CHECKED BY:JMC No.:REVISION DESCRIPTION DATE: G2-1 OVERALL PLAN 0 40'60'20'10' GRAPHIC SCALE START OF 13-FT. SOUND WALL STA 0+00 END OF 16-FT. SOUND WALL STA 6+87.1 END OF 13-FT. SOUND WALL START OF 16-FT. SOUND WALL STA 1+06.6 SEE DETAIL A WALL CORNER STA 2+70.9 SEE DETAIL B WALL CORNER STA 3+48.8 SEE DETAIL A WALL CORNER STA 4+45.4 SEE DETAIL C WALL CORNER STA 4+74.4 SEE DETAIL D WALL CORNER STA 5+22.8 SEE DETAIL E WALL CORNER STA 6+00.3 SEE DETAIL F NOTES: 1. FIELD LOCATE ALL UTILITIES BEFORE EXCAVATING FOUNDATIONS 2. COORDINATE FOUNDATION LOCATIONS ADJACENT TO EXISTING WATER LINES AND HYDRANT ACCORDINGLY DETAIL C DETAIL D DETAIL E DETAIL F \\troy\geotechnical\2022 geotechnical\220705 fedex yarmouth sound wall\cad\220705.dwgDETAIL A DETAIL B SEE NOTE 2 SEE NOTE 2 11/4/22Architectural Review111/4/2022