Loading...
HomeMy WebLinkAbout23-A010 12 Stratford Lane"YRhr TOWN OF YARMOUTH 1146 ROUTE 28, SOUTH YARMOUTH, MA 02664 4451 RECEIVEL, Telephone (508) 398-2231 Ext. 1292—Fax (508) 398-0836 4 JAN 2 5 Y OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE yAK1vlUU i t APPLICATION FOR ol_ n KIN G SSG- - CERTIFICATE OF APPROPRIATENESS Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as amended, for proposed work as described below & on plans, drawings, photographs, & other supplemental info accompanying this application. PLEASE SUBMIT 4 copies OF SPEC SHEET(S), ELEVATIONS, PHOTOS, & SUPPLEMENTAL INFORMATION. Check All Categories That APRIy: Indicate type of Building: Commercial X Residential 1) Exterior Building Construction: New Building Addition Alterations Reroof Garage Shed X Solar Panels Other: 2) Exterior Painting: Siding Shutters Doors Trim Other: 3) Signs/Billboards: New Sign Change to Existing Sign 4) Miscellaneous Structures: Fence Wall Flagpole Pool Other: Please type or print legibly: Address of proposed work: 12 Stratford Ln, Yarmouth, MA 02675 MaplLot # 143_47 Owner(s): LUNDQUIST THOMAS W (LIFE EST) Phone #: 508-737-4090 All applications must be submitted by owner or accompanied by letter from owner approving submittal of application. Mailing address: 12 Stratford Ln, Yarmouth, MA 02675 Year built: 1975 Email: capecodautoconnection@hotmaii.com Preferred notification method: Phone Email Agent/contractor. Clean Energy Design Phone #: 508-563-6990 Mailing Address: PO Box 686, Osterville, MA 02655 Email: Info@cleanenergydeslgn.com Preferred notification method: X Phone X Email Description of Proposed Work: Installation of roof mounted solar panels - consisting of (33) Q Peak duo blk ML G10+ 400 panels Panels are black/black. Signed (Owner or agent): Date: 1 /18/23 ➢ Owner/contractor/agent Is aware that a permit Is required from the Building Department. (Check other departments, also.) ➢ If application Is approved, approval is subject to a 10-day appeal period required by the Act. ➢ This certificate is good far one year from approval date or upon date of expiration of Building Permit, whichever date shall be later. ➢ All new constniction will be subject to Inspection by OKH. OKH-approved plans MUST be available on -site for framing & final inspections. Rcvd Date: 3 Amount Cash/CK #: Rcvd by: L 5. 45 Days: Date Signed: Approved Approved with Modifications Reason for Denial_ Signed: Denied 1 APPLICATION #: �; � -A 01 0 o TOWN OF YARMOUTH 0 1 1146 ROUTE 29, SOUTH YARMOUTH, MASSACHUSETTS 026644451 Telephone (508) 398-2231 ExL 1292 Fax (508) 39"836 OLD KING'S HIGHWAY HISTORIC DISTRICT CONEMTTEE WAIVER OF 45-DAY DETERMINATION The applicant/applicant's agent understands and agrees that due to the current declared National and State public health emergencies the determination of our Application for a Certificate of Appropriateness/Demolition/Exemption may not be made within 45 days of the filing of such application. The applicant agrees to extend the time frame within which a determination is to be made as required by the Old King's Highway Regional Historic District Act. SECTION 9 -Meetings, Hearings, Time for Making Determinations "As soon as convenient after such public hearing; but in any event within forty-five (45) days after the filing of application, or within such further time as the applicant shall allow in writing, the Committee shall make a determination on the application. " Applicant understands that the review of this application will be scheduled as soon as the situation allows, Applicant/Agent Name (please print): Thomas Wi neman Applicant/Agent si 1118123 signature: Date: 1 w�- _.�_s ,��� . �_ RECEIVED JAN 2 5 2023 fAhiv+uu ; ;- .���nic� wT� Application #: 3 � 0 D TOWN OF YARMOUTH OLD KINGS HIGHWAY HISTORIC DISTRICT COMMITTEE ABUTTERS' LIST Applicant's (Owner) Name: LIP 6)+. Property Address/'Location: i.?, 5-z+A 4 L.*� Hearing Date: Notices must be sent to the Applicant and abutters (including owners of land on any public or private street or way) who's property directly abuts or is across the street from the Applicant Please provide the Assessor's Tax Map and Lot numbers only. The OKH Office will send out notices using the addresses as they appear on the most recent applicable tax list Note. Instructions for obtaining the abutters Map and Lot numbers can be found on the Old icing's H ghway Department page on the Town website www. armouth.ma.us Applicant Information: Abutter Information: JAN 2 5 2023 r'AHIVIOu I r Map Number Lot Number �w 3 Ll 13 14 I L13 _ L13 I `'t 3 LiG_ ) y 3 g� b el awl -- 1 `► 3 9 i Application #, 73.. Ao I u 82018 3 1 /25/23, 11:16 AM about:blank 12 Stratford Lane 43.50 143.74 143 85 143.107C 1 p�" 143.75 �P � 143.110.1 143.34 rp 143.76 143.861 143:Wi 4'1+43.77 O 143.35 w � w 1 --i9 143.7,8 143.111C 14#34C lww 14384 143.122 �i4342 143i* 39 143.112 143.83 14143 143"47 :143.121 � 14�49 P ,3. 1lw 143.79 143:143.150 �r13 44 �V IN' 143048 vice_ v 143.119 143.82 /- ' 143.45 � 3.01 1114 0 143.60 �1w � 1456 ��, w. �43.143?147 143.118 43.11 9p 143.81 1157 1431155 143.152 143:115 143.116 -- _ V i January 25.2023 ECEIV96 JAN 2 5 2023 +AriiViVu I r, 1 2.251 0 75 150 300 R 0 20 40 80 m saxat, ea. A-o as uses. 4:.A, NAZA save N RWO- ,Cw '&8. 03- RNA, Glo6x7Bflli[�_ pwtF3wmm Gm Geaa.e FEVA mmvr lu rw iV G'.L �w xnnnr� rims tea* trran m of 14 r4p.a. 06x xxv,.q rwroa ans ew 2ar em'—ft- �3 -A-o ff n about:blank i R lam. CR V E D JAN 2 5 2023 Solar Safes & Service Contract Y flhivi Vii � Y { OLD KING'S HIGHWAY This contract is made on December 31 st, 2022 between Clean Energy Design, LLC located at 11 Oak Lane, Osterville, MA with a mailing address of PO Box 686 Osterville, MA 0265S and, Customer Name & Project Address: Thomas Lundquist 12 Stratford Lane Yarmouth, MA USA Solar System Size: 13.20 kW Solar Electric (PV) Equipment To Be Installed: Customer Contact Info: capecodautoconnection@hobTk il.corn 508-737AO90 Type Manufacturer Model Quantity Module Qcells Q.PEAK DUO BLK ML-G10+ 400 33 Inverter SMA Solar Technology AG Sunny Boy 7.0-US 240V 1 Inverter SMA Solar Technology AG Sunny Boy 6.0-US 240V 1 Payment schedule: Due upon execution of contract $2p WO Due upon contractors notice of installation schedule: S3.034. Due upon installation of major components. $13,820 Due upon awgktion of elec r ] irtspection: S6,910 Due upon system commissioning W04 Total System Cost: a4&,068 Clean Energy DesV, LC, Nang Reynoldsnancy@Ueanenergydesign.corn Page 1 or4 ECRVED General Terms and Conditions of Sale JAN 2 5 2023 r Hrflviuu I I-, Our business relationships with our customers shall be based on our General Terms and Conditions of Sale, as defined below: 1, Turn Key Service: Contractor is providing a "turn key" system as specified above which includes all applicable standard hardware, materials, supplies and services required to provide a fully -operational system, including required permitting, interconnection, net metering documentation for systems under 15 kW AC only (if applicable) and SMART program registration. 2. Compliance to Building Codes: All work shall be completed in a workmanship like manner and in compliance with all building codes and other applicable laws. 3. License Status: To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work 4. Project Management & Use of Subcontractors: Project Manager is Tom Wineman Contractor may at its discretion engage subcontractors to perform work hereunder, provided Contractor shall fully pay said subcontractor and in all instances remain responsible for the proper completion of this Contract. 5. Change Order (Mid -Performance Amendments): The Contractor and Customer recognize that Contractor s original cost and time estimates may prove too low due to unforeseen events, or to factors unknown to the Contractor when the contract was made; Customer may desire a mid -job change in the specifications that would add time and cost to the specified work possibly inconvenience the Contractor; or Other provisions of the contract may be difficult to carry out because of unforeseen events, such as a materials shortage. Fquipment substitutes may need to be made because of availability issues. If these or other events beyond the control of the parties reasonable require adjustments to this contract, the parties shall make a good faith attempt to agree on all necessary particulars. Such agreements shall be put in writing, signed by the parties and added to this contract. Failure to reach agreement shall be deemed a dispute to be resolved as agreed herein. 6. Liability Waiver: Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees and subcontractors. 7, Permits and Approvals: Contractor shall obtain all permits necessary for the work to be performed. Permitting and Interconnection fees are included unless otherwise specified 8, Budget, Timeline & Installment Payments: In the event Customer shall fail to pay any periodic or installment payment due, Contractor may cease work without breach pending payment or resolution of any dispute. 9. Dispute Resolution: All disputes hereunder shall be resolved by binding arbitration in accordance with the rules of the American Arbitration Association. 10. Force Majeure: Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials. Any starting or completion dates stated by Contractor shall be subject to clarification of all technical details. Moreover, Contractor obligation to meet any deadlines shall be based on the punctual and proper fulfillment of the customer obligations. In the event of Force Majeure, delayed shipments by suppliers or subcontractors or other causes hindering punctual Completion for reasons that Contractor are not accountable for, Contractor shall be entitled to extend the Completion date(s) by a reasonable amount of time Clean Energy Design, LLC, Nancy Reynolds Page 2 of 4 ,;? -�-16f0/0 ■ an_W.VI.._■ ,ff ram, JAN 2 5 2023 11. Materials and Manufacturers Warranties: All materials shall be new, in compliance with all applicable laws and codes, and shall be covered by a manufacturer warranty when appropriate. 12. What Constitutes Completion: The work specified herein shall be considered completed upon approval to Interconnect by the Utility. Completion shall include commissioning and testing to verify that the equipment is performing to the designed specifications. 13. Owner Representations: The Owner represents and warrants that owner is the lawful owner of the Premises, and is duly authorized to enter into this Agreement. 13.1 The Owner hereby agrees to provide Contractor with reasonable access to the Premises during regular business hours and to make payments when they become due in accordance with the terms of this Agreement. 13.2 The Contractor retains the right to use photographs of the installation on the company website and/or for educational or marketing purposes. 14. Limited Warranties: Contractor will complete the specified work in a substantial and workmanlike manner according to standard practices prevalent in Contractor's trade. 14.1 Contractor warrants that the labor and materials provided as part of the specified work will be free from defects for a period of ten (10) years from the date of completion. 14.2 Contractor disclaims any liability for direct or indirect damages due to improper modifications, alterations or repair attempts, inappropriate use or operation, insufficient ventilation of electrical equipment, non-compliance with relevant safety standards or regulations, flood, lightning, over voltage, storm, fire (acts of nature) or damage caused by animals. 14.3 Contractor will not be liable for any direct, indirect or consequential damages, losses, costs or expenses however arising in contract or tort, including without restriction any economic losses of any kind, any loss or damage to property, any personal injury, any damage or injury arising from or as a result of misuse or abuse, or the incorrect operation of the equipment. 15. Site Maintenance: Contractor agrees to be bound by the following conditions when performing the specified work: 15.1 Contractor shall perform the specified work between the following hours- 7:00 am-7:00 PM. unless otherwise approved by the customer. 15.2 At the end of each days work, Contractor agrees to clean all debris from the work area and leave all appliances and facilities in good working order, except as follows. when the site is under construction and other contractors are working onsite creating debris. 16. Assignment by Contractor and Subcontracting: The Contractor shall not assign or in any way transfer any interest in this Agreement without the prior written consent of Owner, nor shall Contractor subcontract any services to anyone without the prior written approval of Owner. 17. Choice of Law: This Agreement shall be governed by and constructed in accordance with the laws of the Commonwealth of Massachusetts, without giving effect to its conflict of laws principles. 18 Survival: In the event of any termination of this Agreement, any provision of this Agreement which contemplates performance or observance subsequent to any termination or expiration of this Agreement will survive and continue in effect and will inure to the benefit of and be binding upon the Parties and their legal representatives, heirs. successors, and assigns. Clean Energy Design, LLC, Nancy Reynolds Page 3 of 4 'r;�3 -Ab)u R i } JAN 2 5 2023 19. Right of Cancellation! Customer may cancel this Contract vAthin live (5) days after signature by notifying Contractor of such in v.ritfng. in tip event that the customer cancels after 5 days. trLre i:fl1 be a 50%0 penalty fee incurred. 20- {niter Terms_ Customer wid GorttracWr addition-WIV agree that: All agreements between Customer and Contractor related to the specified work are incorporated in this Contract. Any modification to the Contract shall be in writing. i have read and agree to the above Sales Contract:' CUSTOMER: Signature ✓ �__..� Thomas Lundquist 9 CONTRACTOR!! __-_- Signature Thomas Wineman Ciean Energy Design, LLC, Narxy tieynolds 508-553-69go Date / ?f Date_Z— Page 4 of 4 97, -mil u EnergyDesign Simplifying Soar Power Site Plan 12 Stratford Lane, Yarmouth, MA 02675 JAN 2 5 2023 r r-niv,w i r 4 STRATFORD 9 AVON RQ LN Solar Panels Interior bas me nsp and SMA lnverters as ROM t STRATFOP N RO Ll`I Exterior - front of house - Utility Meter, SMART Production Meter and Disconnect 19 7 STRATFORD LN 20 STRATFORD L td PO Box 686, Osterville, MA 02655 Tel: 508.563.6990 Fax: 888,424.8824 www.cleanenergydesign.com - . EnergyDesign Simplifying Solar Power . Zoomed out satellite view Solar Panel Layout 12 Stratford Lane, Yarmouth, MA 02675 M model RECO-VED JAN 2 5 2023 YAHIViUU1 n a3 '� u PO Box 686, Osterviile, MA 02655 Tel: 508.563.6990 Fax: 888.424.8824 www.cleanenergydesign.com 1-130,10, EnergyDesign Simplifying Solar Power ,OWE INN - W-f- - JA N 2 5 2023 F rirlivivv i r'i PO Box 686, Osterville, MA 02655 Tel: 508.563.6990 Fax: 888.424.8824 www.cleanenergydesign.corn OPEAK DUO BLK IVIL-G10+ SERIES RFCFIVED QCe11$ 385-405Wp I 132Cells JAN 2 5 2023 20.6% Maximum Module Efficiency i rir'tlufVir+ MOD0,PEAK N-10 BILK ML-GIU, b busbar cell technology The ideal solution for. Rooftop arrays on residential buildings 12 busbar cell technology Breaking the 20 % efficiency barrier Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.6%, A reliable investment 6 Inclusive 25-year product warranty and 25-year linear In Mntyty performance warranty', Enduring high performance 10) Long-term yield security with Anti LeTC Technology, acilli t Anti PI6 Technology2 and Hot -Spot Protect. Extreme weather rating High-tech aluminium alloy frame, certified for high snow (5400Pa) and wind loads (400OPa). Innovative all-weather technology Optimal yields, whatever the weather with excellent low-lfght and temperature behaviour. n The most thorough testing }l•/`•f( programme in the industry Qceils is the first solar module manufacturer to pass the most comprehensive quality programme in the industry: The new "Quality Controlled PV' of the independent certification Institute TU`V Rheinland. ' See data sheet on rear for fu&re informatbn ' APT test conditions according to iECITS 62804-12015. method A I-1500V, 96 tO i 1'rinr.� � iWEl 23._Aor 0 RECRimn ' JA N 2 5 2023 -)U0 BLK NIL--G10+ SERIES 1 M€ llViiJV I i , OLD KILGIS HIGH" Mechanical Specification Format 74.0 in x 4113n x 1.26In (including frame) waow� arpsapu.r 0879mm x 1045mm x 32mm) Weight + 48.SSDs(22.Okg) s Front Cover 0.13 in (3.2 mm) therme2y pre -stressed giass •'0 •°"Vii°T�'•+ With anti -reflection technology • � +ssoFs� Back Cover Composke film a Freme Bieck anodised aluminium � Cell 6 x 22 monacrysolirm O.ANTUM solar half cefis Juncfonbox 2.09-3.98in-1.26-2.36inx0.59-0.71Fn (W01 mm : 32.60 mm x 15-16mm], FP67, with bypass diodes r-o.•.r.nrr Cable 4mm' Solar cable; (+) 2!49.21n 0250 mm), (-J x49.2 in 0250 mm) • v-P-4 + Connector ---- --- --- Sttlu611 MC4; Ip68 oy� ppf Pu�1 I u� ■ Electrical Characteristics POWER CLASS 385 390 $9E 400 405 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STCI (POWER TOLERANCE +5 W I-0W) Powerat MPP` P-1 IM 385 390 395 400 405 Short Circuit Current' I� [Al 11.04 11,07 11.10 1134 11,17 Open Circuit Voltage' Va M 45.19 45.23 45,27 463 4534 Ctlmerrt at MPP I_ [A] 10,59 10.65 10,71 1077 10.83 Voltage at MPP V_ M 36,36 36.62 36.88 3741 37,39 eftlency' 9 [%] z19,6 219.9 z20.1 220A Z!Xi$ MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Power at MPP PW [W] 288.8 292.6 296.3 300.1 303.8 E Short Circuit Current Isc (A] 8.90 8.92 8.95 8.97 9.00 Open Circuit Voltage Von IM 42.62 42,65 42.69 42.72 42.76 M Current at MPP ifs, [A] us 8.41 8.46 8.51 8.57 Voltage at MPP Vim, M 34,69 34.81 35.03 35.25 35.46 'Measurement tolerances P_±3%; ix V«±5%at STC:1000WIm2, 25±2'C, AM 1.5 according to FEC 60904-3 • 2800 W/m2, NMOT, spectrum AM 1.5 Ocelle PERFORMANCE WARRANTY l+�s.rrre r,Ao a9° -------------------"------ #Z Op I At least 98%of normal power during first year. Thereafter ma: 0.5%detFadarUm peryear. At tent 915%of nominal power up t010 years. At least 86%of nominal powerup to 25 yepr€ All data wtthin measurement tolerances. Full warren8es In accordance Win the wanenty terms f the Ocells sales organisatlon of your respective murdry. '9ererE prw riouwwdm for tlr 5 PV c ponlm wro are lrynast WW.Vim msapr lo 20M F b-ry 2021) TEMPERATURE COEFFICIENTS Temperature CoOkleat of I� a [%/K] Temperature Coefficient ofP_ V [%1K] at Properties for System Design Ma€dmum System Voltage V- M Maximum Series Fuse Rating )A DC] Max Design Load, PushJPulP MOW] Max.TestLoad,Push/ Pull' (IbsiltJ 3 See instsTlallon Manual ■ Qualifications and Certificates UL 61730, cE-compllmt. OW Cordrof PV TW Rh P9RFORf11ANCE AT LOW IRRADIANCE w I e I r 1 I 11 y 2 A - ma AO rpa YO 4m pERAtlIAhECt=:.,. ry®€ rn aocvle W-IxWw low 1rptlYxi larikt ovAl mmperumto STC ca.WN 2Wa 5T,VO rr'!. 40.04 Temperature Coefficient ofVo, -0-34 Nominal Module Operating Temperature 1000 (IEq/1000(UL) -- - - PV module classification 20 Fire Rating based on ANSI; UL 61730 75 (3600Pa)/55 (2660Pe) Permitted Module Temperature 113 (5400 Pa)184 (4000Ps) on Continuous Duty Nty htl - elnland, IEC 612152016. IEC 61730:2016, US. CbteM No. 9,893215(solar calls), �® b 1411T21S11 9 [%/K] -0.27 NMOT rF] 109±5.4 (43±3-C) Class 11 TYPE 2 -40'F up to+185'F (-40'C up to +85'C) ON 1h i C..,r , :relent, Imlekaoon„se Ows eunl ba IaOo� CeehSt Olrr €EChru:pl SafNCB f., fu ,, Inrarm•kn m•ppro W hqftillrllen a Oft prpsnct, �^ceQ� 4005pe t- 0.4tl Ork. Saxe W00. Frnne, CA K518, USA I IR N 907485e M 1 FWI, hg4prgli�eaapLLean I Wr MemFlppM.°pn i