HomeMy WebLinkAbout1029 Route 28 plans 5DEMOLITION NOTES
1. GENERAL:
a. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, AND BUILDING DESIGN STANDARDS AND
CONTRACTOR RULES AND REGULATIONS, PERTAINING TO SAFETY OF PERSONS, PROPERTY & ENVITONMENTAL PROTECTION.
b. PROVIDE AND MAINTAIN BARRICADES, LIGHTING, AND GUARDRAILS AS REQUIRED BY APPLICABLE CODES AND REGULATIONS TO
PROTECT OCCUPANTS OF BUILDING AND WORKERS. i
O OTHER
C. ERECT AND MAINTAIN DUSTPROOF PARTITIONS AS REQUIRED TO PREVENT SPREAD OF DUST, FUMES, AND SNOKE, ETC. T
PARTS OF THE BUILDING. ON COMPLETION, REMOVE PARTITIONS AND REPAIR
DAMAGED SURFACES TO MATCH ADJACENT SURFACES.
d. IFbEMOLITION IS PERFORMED IN EXCESS OF THAT REQUIRED, RESTORE EFFECTED AREAS AT NO COST TO THE OWNER. THE
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT AS REQUIRED TO COMPLETE DEMOLITION EXCEPT THOSE 6
ITEMS TO BE REUSED, RETURNED OR OTHERWISE DIRECTED. 6
TO OWNER A-5.1
A-5.1
e. REMOVE FROM SITE AND LEGALLY DISPOSE OF REFUSE, DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION
OPERATIONS.
D VAC EQUIPMENT INCLUDING DUCT WORK U.O.N.
f. REMOVE
ABANDONED H °• _ -
9. REMOVE ABANDONED ELECTRICAL, TELEPHONE AND DATA CABLING AND DEVICES, UNLESS OTHERWIDE NOTED.
2. PARTITIONS:
s
RREMOVE ALL ASSOCIATED STUDS, TRACKS FINISHES AND ELECTRICAL WIRING ALL THE WAY DOWN TO THE PANEL.
EMOVE ALL PARTITIONS IN THEIR ENTIRETY, WHERE INDICATED, INCLUDING GYPSUM WALL BOARD AND PLASTER PARTITIONS.
3. DOORS AND FRAMES:
a. REMOVE ALL DOORS, FRAMES AND RELATED HARDWARE, WHERE INDICATED. COORDINATE SLAVAGE WITH OWNER: A-5.1 - -
b. DEMOLITION CONTRACTOR SHALL NOT REMOVE BUILDING CORE DOORS INCLUDING FIRE EXIT AND ELEVATOR DOORS OR DOORS NOT °
d. ° a
PART OF
AREA
F WORK UNLESS OT
HER NOTED. P
WIDE U
4. CEILINGS: I °1
a. REMOVE ALL EXISTING LIGHTING, DIFFUSERS, RETURN GRILLES, EXIST LIGHTS, FIRE ALARM DEVICES AND ALL RELATED WIRING s P-3 d P-4
EXCEPT THROUGHOUT AREAOF WORK - U.O.N. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION.
b. ALL EXISTING CEILING TILE AND GRID SYSTEM TO BE DEMOLISHED THROUGHOUT AREA OF WORK EXCEPT 4 I
NEW STRUCT. FTG. & POSTS,
REFER TO STRUCT. bTLS.
WHERE OTHERWISE NOTED ON CEILING PLAN. G.C. TO COORDINATE ALL LIGHTING EQUIPMENT, DUCTWORK, ETC. °d ° I d
7
5. MILLWORK: , FINISHED BASEMENT
THROUGHOUT AREA OF WORK INCLUDING INSIDE CLOSETS AND OTHER AREAS A -5.1e
ALL EXISTING MILWORK THRO .
THE G.C. TO REMOVE A ; -<a FLOOR ABOVE; 2x12 16° O.C.oc. ,, °• - II
SCHEDULED FOR DEMOLITION WHETHER NOTED OR NOT ON DRAWING. I, . _ r-4" TO BOTTOM OF JOIST
SUB SLAB 6" THICK
ti. WINDOW TREATMENTS:
WINDOW TREATMENT HALL REMAIN, PROTECTa. DURING DEMOLITIONLITION AS REQUIRED. y'
I •°�•
b. FREE STANDING COLUMNS: k` P-2 1'
C. ALL FREE STANDING GYPSUM BOARD COLUMN ENCLOSURES AND ASSOCIATED FRAMING TO BE CAREFULLY REMOVED UNLESS P-1 6 ° I
OTHERWISE NOTED. G.C. TO IDENTIFY AND PROTECT ANY PLUMBING, HVAC OR ELECTRICAL RISERS TO REMAIN.A-5.1
7. FINISHES: SIM. SEE STRUCT
a. WALLS: ON WALLS OR COLUMN ENCLOSURES TO REMAIN, G.C. TO CAREFULLY REMOVE ALL EXISTING WALL FINISHES (WALL q, P 2
PANELING, ETC.) AND PREPARE WALL SURFACE TO RECEIVE NEW WALL FINISHES. 6
COVERING, WAL BASE,
b. FLOORS: THE G.C. TO REMOVE THROUGHOUT AREA OF WORK ALL EXISTING FLOORING AND ADHESIVE TO SLAB INCLUDING CARPET, A-5.1 °I
CARPET TILE, UNDERLAY, TILE AND RESILIENT FLOORING IN AREA OF WORK.
8. MEP NOTES:
a. A LICENSED PLUMBER AND ELECTRICIAN, SHALL BE ON-SITE TO SAFE OFF RESPECTIVE EQUIPMENT PRIOR TO DEMOLITION. P-5 SUMP
b. ALL EXISTING ELECTRICAL, MECHANICAL AND PLUMBING DEMOLITION TO BE VERIFIED BY ENGINEER - REFER TO MEP DRAWINGS. PUMP
C. THE G.C. SHALL REMOVE ALL WALL AND FLOOR CONDUITS LEFT AFTER DEMOLITION, INCLUDING SWITCH BOXES, ELECTRICAL, - — —
TELEPHONE AND DATA OUTLETS, JUNCTION BOXES, PLATES, BRIDGES, OR ANY OTHER ELECTRICAVDATA AND TELEPHONE WIRING
EQUIPMENT AND ALL RELATED WIRING BACK TO THE ELECTRICAL OR TELEPHONE CLOSET. COORDINATE WITH TELECOMMUNICATIONS
VENDOR AND CLIENT FIELD REPRESENTATIVE REFER TO MEP DRAWINGS. I ,
9. ELECTRICAL: d = . ° O °
a. ANY REMOVAL OF SUCH ELECTRICAL EQUIPMENT SHALL BE DONE IN SUCH A WAY AS TO ALLOW THE OPERATIONS OF ADJACENT
FLOORS OR WORKING AREAS IN THE SAME FLOOR THAT AREA NOT PART OF THE AREA OF SCOPE TO CONTINUE WITHOUT
INTERRUPTION OF ANY SERVICE DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL TAKE ALL NECESSARYOL.
< d °
COL.
PRECAUTIONS IN ORDER TO COMPLY WITH THIS ORDER.
b. G.C. SHALL HAVE AN ELECTRICIAN ON PREMISES DURING DEMOLITION AFFECTING ELECTRICAL LINES IN AREA OF WORK AND a • ° . -
ADJACENT SPACES.
C. ELECTRICAL CONDUITS IN EXISTING WALLS WHICH ARE DEEMED TO BE REMOVED, SHALL BE DEMOLISHED, UNLESS THEY RUN FROM OLD VAULT P-2
FLOOR SLAB TO FLOOR SLAB. COORDINATE WITH ENGINEER AS REQUIRED. I OIL
T TO REMAIN. G.C. TO SHALL
PANELS EXISTING PANELS IN CORE ELECTRIC CLOSESBURNER I
d. G.C. TO COORDINATE REMOVAL OF ELECTRICALI
REMOVE ALL HOMERUNS TO THE PANELS AND MAKE CIRCUIT BREAKERS SPARE FOR REUSE. EX
e. ALL EXISTING SPEAKERS/FIRE STROBES TO BE REMOVED THROUGHOUT AREA OF WORK, REFER TO MEP DRAWINGS FOR MORE BEAM I ABANDONED
INFORMATION. IT ROOM d
Nrc ELECT., P-5 SUMP
TS: PUMP
10. FLOOR OUTLETS: I
ALL POWER/DATA FLOOR OUTLETS ARE TO BE REMOVED AND SHALL HAVE WIRE/CABLE REMOVED BACK TO OR SOURCE, COL. SUB -PANEL
COORDINATE WITH MEP VERIFY QUANTITIES AND CONDITIONS IN FIELD. CONTRACTOR TO INCLUDE IN BID COST TO INFILL SLAB AS EHW XT ° d
5 P 6d
REQUIRED AFTER REMOVAL OF ALL FLOOR OUTLETS. °
11. TELECOM /DATA:
REMOVE ALL TELEPHONE AND DATA CABLING FROM DEVICE BACK TO THE RACKS OF 411
THE EXISTING COMMUNICATIONS CLOSET.
COORDINATE WITH TELECOMMUNICATIONS VENDOR AND CLIENT'S FIELD REPRESENTATIVE.
12. HVAC DUCTWORK: III
a. REFER TO MECHANICAL DRAWINGS FOR EXTENT OF DEMOLITION AND ADDITIONAL INFORMATION.
b. PROTECT ALL PERIMETER FAN COIL UNITS AND ENLOSURES DURING DEMOLITION AND CONSTRUCTION U.I.N.
Basement Proposed Plan
PLUMBING:
13.
a. REMOVE ALL PLUMBING FIXTURES AS SHOWN ON DEMOLITION PLAN. CAP PLUMBING LINES TEMPORARILY FOR FIXTURE J
REPLACEMENT OR RELOCATION PER NEW LAYOUT, ANY PLUMBING DETERMINED TO BE EXCESS SHALL BE REMOVED BACK TO RISER
AT THAT TIME.
b. EXISTING BASE BUILDING DRINKING FOUNTAINS TO REMAIN UNLESS LOCATED IN AREA OR WORK. CONTRACTOR TO ENSURE THAT
FOUNTAINS ARE IN GOOR WORKING ORDER AND INCLUDE IN BID THE COST TO REPAIR ANY THAT ARE NOT.
# I GENERAL SCOPE OF WORK NOTES:
P-1 IN BOTH BASMENTS, PROVIDE NEW LED UTILITY LIGHTING ON SINGLE SWITCHED CIRCUIT & INSUL. ALL
FLOOR JST. CAVITIES W/ 6" SPF
P-2 FILL ALL LOW SLAB AREAS AT REMOVED PARTITIONS AND SPACES TO PROVIDE A LEVEL FLOOR
P-3 NEW STRUCTURAL BEARING BEAMS, W/ NEW STEEL COLUMNS AND FOOTINGS
P-4 INFILL LOW SLAB AREA AT STAIR. PROVIDE TEMP SHORING AND BRACING FOR STAIR. REMOVE STAIR
FRAMING FROM BASEMENT TO LANDING. RECONSTRUCT LANDING WITH PT WOOD AFTER INFILL.
P-5 NEW SUMP PUMP PIT AND PUMP SYSTEM. REFER TO PLUMB. DWG. FOR DTLs.
P-6 PROVIDE NEW BASEMENT VENTILATION SYSTEM. REFER TO MECH. DWG.
P-7 PROVIDE NEW CASED OPENING
DEMOLITION LEGEND
—_ — -_ EXISTING PARTITIONS, EQUIPMENT, ETC.
(SHOWN DASHED) TO BE REMOVED
\ EXISTING DOOR AND FRAME TO BE REMOVED
� I
EXISTING CONSTRUCTION TO REMAIN
UNFINISHED BASEMENT
FLOOR ABOVE; 2x12 12" O.C.
7'-2" TO BOTTOM OF JOIST
P-1
COL.
AP -5
STEP DOWN
OIL TANKS:RS
,.
ELECTRICAL
SERVICE
TEL -COM
SERVICE
Basement Demo Plan
1 1/4" 1'-0"
i
A
NESGroup
Arch itectSPC
905 S. Main St. BIdq B Ste 201
781-331-8541
nes-grouparchitects.com
OCOPYRIGHT NES GROUP ARCHITECTS, PC.
ALL RIGHTS RESERVED. NO USE OR REPRODUCTION OF THIS
MATERIAL IS PERMITTED WITHOUT THE WRITTEN CONSENT OF
NES GROUP ARCHITECTS, PC.
No. Description Date
��
'IN
i.
CC# 0577
1029 MA -28
So. Yarmouth, MA
Flooding
Remediation &
Protection
Basement
Demolition and
Proposed Plans
Project Number 21028
Project status Permit/Construction Set
Date 11/01/22
Drawn By LKQ
Checked By TEC
A�l
e
Scale 1/411 = 1 1-011
DO NOT SCALE DRAWING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.